ML18288A251

From kanterella
Revision as of 05:21, 6 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124)
ML18288A251
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 10/15/2018
From: James Kim
Plant Licensing Branch 1
To: Duke P, Bernard Thomas
Public Service Enterprise Group
References
L-2018-LLR-0124
Download: ML18288A251 (2)


Text

NRR-DMPSPEm Resource From: Kim, James Sent: Monday, October 15, 2018 8:41 AM To: Duke, Paul R.

Cc: Thomas, Brian J.

Subject:

Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124)

Paul, By letter dated September 24, 2018 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML18268A116), Public Service Enterprise Group Nuclear, LCC (PSEG, the licensee) submitted a relief request for Hope Creek Generating Station in accordance with 10 CFR 50.55a, Codes and standards, paragraph (g)(5)(iii) requesting approval for the third 10-year inservice inspection interval.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

The NRC staff has estimated that this licensing request will take approximately 250 hours10.417 days <br />1.488 weeks <br />0.342 months <br /> to complete. The NRC staff expect to complete this review in approximately 12 months, which is October 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any question, please contact me, James Kim, at James.Kim@nrc.gov or 301-415-4125.

James Kim, Project Manager Branch 1, Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1

Hearing Identifier: NRR_DMPS Email Number: 624 Mail Envelope Properties (James.Kim@nrc.gov20181015084000)

Subject:

Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124)

Sent Date: 10/15/2018 8:40:36 AM Received Date: 10/15/2018 8:40:00 AM From: Kim, James Created By: James.Kim@nrc.gov Recipients:

"Thomas, Brian J." <Brian.Thomas@pseg.com>

Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2431 10/15/2018 8:40:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: