Monthly Operating Rept for Nov 1981
ML20038C571
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/01/1981
From: Mcbride L
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20038C569 List:
References
NUDOCS 8112110237
Download: ML20038C571 (5)


Text

y ._

s M)NTHLY OPERATING INFORMATION DISTRIBUTION Number of Copies Di re c t o r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (Original of P Letter)

Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Karl V. Seyfrit. Director ---------------------------- 1 (P Letter)

Region IV of fice of Inspection and Enforcement Nuclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Di r e c t o r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter)

Of fice of Management Information and Program Control U. S. Nuclear Regulatory Comission Washington, D.C. 20555 Ted Cintula ----------------------------------- 1 (P Letter)

U. S. Nuclear Regulatory Comission 12105 National Maryland Bank Building Washington, D.C. 20555 Mr. Richard Phelps --- ---------------------------- 1 (P Letter)

FSV, GA, Site Rep resentative

. General Atomic Company P. O. Box 426 Platteville, Colorado 80651 NRC Resident Site Inspector --------------------------- 1 (P Letter)

Senior Vice President, Room 770 ------------------------- 1 (P Letter)

Vice President. Electrical Engineering and Planning, 39th Avenue - - - - - - - - - 1 (P Letter)

"ica President, P rdction Divis ion, Belleviev - - - - - - - - - - - - - - - 1 (P Letter)

Quality Assurance Manager ---------------------------- 1 (P Letter)

S i t e En ginee ring Coo rdinato r - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Nuclear P roj ec t Manager, Mon tbello - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Gary Reeves, Public Relations, Room 950 ---------------------1 (Original of Memo)

Bill Shinkle, Property Accounting, Holly Service Center ------------- 1 (Original of Mem)

Supervisor, Licensing and Administrative Services.

Nuclear Project Department, Monthello -e--c---- ---------- 1 (P Letter)

Supervisor, Project Engineering, Nuclear Project Department, MontSello - - - - - - 1 (P Letter)

Documents Control Technician, Montbello -------------------- 2 (2 P Letters)

Correspondence Coordinator. ';uclear Project Department Montbello -------- 1 (P Letter)

Nuclear Production Manager - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Ope ra t ion s Mana ge r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Administrative Services Manager --------------- --.------ 1 (P Istter)

PORC Con =1ttee - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

FSV NTSC Secretary - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

P Files ------------------------------------- 1 (P Letter)

Re co rd S to ra ge - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter)

Technical Services Review ---------------------------- 1 (P 14 tter)

Technical Ser rices Supervisor ---------------- --------- 1 (P Letter)

Grey Book Notebook - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Moatalf opewtons Folder ---------------------------- 1 Monthly Operating Inf ormation Folde r - - - - - - - - - - - - - - - - - - - - - - - 1 (P 14tterl Monthly Ope rating Inf ormation File - - - - - - - - - - - - - - - - - - - - - - - - 0 (Original of Report and 1 Copy of P Letter)

Gas Cooled Reactor Associates -------------------------- 1 (P Letter)

Attention: Mr. R. A. Evans 3344 North Torrey Pines Court Sui te 300 Lalo 11a, California 92037 Electric Power Research Institute - ---------------------- 1 (P Letter)

Attention: Mr. Melvin E. Lapides 3412 Hillview Avenue P. O. Box 10412 Palo Alto, California 94303 8112110237 811204 PDR ADOCK 05000267 R PDR

OPERATING DATA REPORT DOCKET No. 50-267 DATE 811201 CcMPLETED BY L. M. McBride TELEPHONE (303) 785-2224 OPE?ATING STATUS NOTES

1. Unit Name: hrt St_ Vrnin
2. Reporting Period: 811101 through 811130
3. Licensed Thermal Power Osit): 842
4. Nameplate Rating (Cross W e): 342
5. Design Electrical Racing (Net We): 330 -
6. Maxi: sum Dependable Capacity (Gross We): 142
7. Maximum Oependable Capacity (Net We): 110
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted, If Any (Net We): 231
10. Raasons for Rastrictions, If Any: NRC restriction of 70% pending resolution of temperature fl'actuations.

This Month Tear to Data Cu:sulative

11. Hours in Reporting Period 720 8.016 21.217
12. Nuncer of Hours Reactor Was Critical 209.0 5.443.2 14_578.4
13. Reactor Raserve Shutdown Hours 0.0 0.0 0.0
14. Hours cecerator on-Line 135.5 4.215.0 9.908.3 1$. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. cross Ther:nal Energy cenerated (mm) 97.826.4 2.225.852.0 4.933.944.8
17. Gross Electrical Energy Generated (PA) 35.671 819.562 1.691.356 is. Net Electrical Energy cen rated (sa) 31,700 754,958 1,554,259
19. enic Service raetor 18.8 52.6 46.7
20. Unit Availability ractor 18.8 52.6 46.7
21. Unit capacity Factor (Using MDC Net) 13.3 28.5 22.2
22. Unit Capacity Factor (Using DER Net) 13.3 28.5 22.2
23. Unit Forced Outage Rate 31.1 28.8 34.0 2f. . Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each): Maintenance / modification shutdown December 1, 1981 through January, 1982.
25. If Shut Down at End of Report Period, Escinated Date of Startup: February 1. 1982
26. Units in Test Status (Prior to Cocenercial Operation): Forecast Achieved INITIAL Cn TICALITr N/A N/A INITIAL tLECTRICIn N/A N/A COMMERCIAL CPERAT!CN N/A N/A a

~~~ ~'-

iocEET Ho. 50-267 UNIT NAME Fort St. Vrain DATE 811201 cort.Etro av L. M. McBride REPORT HUNMI November, _ 1981 Tri.EPuoNE (303) 785-2224 HEMIOD OF SiluTTING lxWN SYSTEH COWONENT NO. DATE TYPE DURATION REASON REACTOR I.ER f CODE ODDE CAUSE AND CORRECTIVE ACTION To PREVENT RITURRENCE 81-024811101 F 61.1 11 4 81-068/03L-0 CJA PENETR Steam generator B.2.3 penetration leakage of helium.

81-025811109 F 0.0 11 4 N/A CBI INSTRU Power reduct.an n a to loop shutdown.

81-026811109 S 523.4 B 2 N/A CBI XXXXXXX Loop-split modification.

8 l

t i

L l

4

t AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-267 Unit- Fort St. Vrain Date 811201 Completed By L. M. McBride '

Telephone (303) 785-2224 Month November. 1981 DAY AVERAGE DAILY POWER LEVEL . DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

! l 0.0 17 0.0 2 0.0' 18 0.0 3 32.6 19 0.0 4 196.3 20 0.0 5 232.4 21 0.0 6 290.4 22 0.0 7 309.8 23 0.0 8 316.4 24 0.0 9 27.9 25 0.0 10 0.0 26 0.0 11 0.0 27 0.0 1 12 0.0 28 0.0 13 0.0 29 0.0 s 14 0.0 30 0.0 i 15 0.0 31 N/A 16 0.0

  • Generator on line but no ' net generation.

.m m NG IT./CREL"*CN I

1. Name of Tacilit-r. Tor- St. Vrain Uni: No. 1
2. Scheduled date for nex: refueling shutdown. October 1. 1983 _.
3. Scheduled da:s for restar:

following refueli:2 9.c .-i .- t . iost3 ._

4.
  • Jill refueling or :ssumption of ,,

operation :horeaf:er require a "

te W -=7 specifica-don change or other 11ctuse =" mar' ent? Yes If answer is yes, what, in teneral, vill dese be? Use of type H-451 arachite.

If a=swer is =o, has the reload fuel design and core c=nfigura-ton been reviewed by your Plan:

Sadety Review Ccinnit:se to deter-

mise whether a=y unreviewed safety questions are associated w1:h :he core reimed (2eference ICC71 See: ion 50.59)? ,

If :o such review '..as taken -

clace. When is it scheduled?

5. Scheduled da:e(s) for submi::iss proposed licensing action a=d sutterting infor=ation. Not scheduled at this time: to be determined.
s. Impo rta= licens1=g considera-

-dons associa:ed wi h :sfueling, e.g., new or differene fuel de-sign or supplier, unreviewed design or perfor a-ce analysis i se: hods, sig=ificant changes is fuel design, new operati:g pro-

, cedures.

7. The su=ber of fuel assemblies 1482 EGR fuel ele =en:s (a) in :he core and (b) in 250 spen: HIGR fuel elemen:s j .,a

-- seen: ,ue.,. s orage eco_, .

3. he prese== lice = sed spent fuel.

pcol storage capaci:7 and de Capacity is li=1:ad in size to abou: one-( si s of any 1: crease is licensed :hird of core (appro:cisa aly 500 HIGR

( storage capaci:7 :ha: has been elemen:3). No change is planned.

requested or is planned, is et=ber of fuel asse=blies.

)

==

REFUELING INFORMATION (CONu.wru)

9. The projected date of the 1986 under the Three Party Agreement (Con-last refueling that can be tract AT (04-3)-633) between DOE, Public discharged to the spent fuel Service Company of Colorado (PSCo), and pool assuming the present General Atomic Company.*

licensed capacitv.

  • The 1986 date is based on the understanding that spent fuel discharged during the term of the Three Party Agreement will be shipped to the Idaho National Engineering Laboratory for storage by DOE at the Idaho Chemical Processing Plant (ICPP). The storage capacity has evidently been sized to accomodate fuel which is expected to be discharged during the eight year period covered by the Three Party Agreement.

i l

(