Letter Sequence Supplement |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition, LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition, LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition, LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition, ML11276A118, ML113260423, ML13256A110, ML14163A002, ML16103A348
|
MONTHYEARML11276A1182011-09-28028 September 2011 Fort Calhoun Station - License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Other ML1132604232011-12-13013 December 2011 Online Reference Portal for National Fire Protection Association Standard (NFPA) 805 License Amendment Request Project stage: Other ML1135403342011-12-19019 December 2011 Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: Supplement LIC-11-0136, Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition)2011-12-22022 December 2011 Clarification of Supplement to License Amendment Request (LAR) 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2011 Edition) Project stage: Supplement ML1136300832011-12-29029 December 2011 Acceptance Review Email, License Amendment Request to Adopt National Fire Protection Standard NFPA -805 Performance-Based Standard for Fire Protection for Light-Water Reactor Electric Generation Plants, Project stage: Acceptance Review LIC-12-0033, Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station2012-03-20020 March 2012 Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station Project stage: Request ML1210205742012-04-11011 April 2012 Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Draft RAI ML1210205612012-04-11011 April 2012 Draft Request for Additional Information Email, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition). Project stage: Draft RAI ML1210400482012-04-26026 April 2012 Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-12-0083, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition2012-07-24024 July 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition Project stage: Response to RAI LIC-12-0120, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-08-24024 August 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI LIC-12-0135, Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station2012-09-27027 September 2012 Responses to Requests for Additional Information License Amendment Request 10-07 to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition, at Fort Calhoun Station Project stage: Response to RAI ML13016A4322013-01-16016 January 2013 E-mail, Request for Additional Information, Round 2, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13053A2262013-02-22022 February 2013 Email, Second Round Draft Request for Additional Information, Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants. Project stage: Draft RAI LIC-13-0033, Omaha Public Power District'S, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-04-23023 April 2013 Omaha Public Power District'S, Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request W3F1-2013-0022, Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 8052013-05-16016 May 2013 Response to 2nd Round Request for Additional Information Regarding Adoption of National Fire Protection Association Standard NFPA 805 Project stage: Request LIC-13-0060, Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station2013-05-21021 May 2013 Omaha Public Power District - Remaining Responses to Second Request for Additional Information License Amendment Request to Adopt NFPA 805 at Fort Calhoun Station Project stage: Request ML13178A0352013-06-27027 June 2013 Email Request for Additional Information Round 3 (Afpb), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition). Project stage: RAI LIC-13-0096, Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 8052013-07-29029 July 2013 Responses to Third Request for Additional Information Regarding License Amendment Request to Adopt NFPA 805 Project stage: Request ML13226A1222013-08-14014 August 2013 Email, Request for Additional Information Round 3 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI ML13256A1102013-09-12012 September 2013 Safe Shutdown Analysis (SSA) RAI Response - NFPA-805 Transition (ME7244) Project stage: Other ML13270A2872013-09-27027 September 2013 Email, Request for Additional Information Round 4 (Apla), Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: RAI LIC-13-0142, Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition2013-10-11011 October 2013 Probabilistic Risk Assessment (PRA) RAI Response - NFPA-805 Transition Project stage: Other LIC-13-0158, Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition2013-11-0404 November 2013 Probabilistic Risk Assessment (PRA) RAI Responses 19.01, 24, and 26 - NFPA-805 Transition Project stage: Other LIC-13-0167, Safe Shutdown Analysis (SSA) RAI 17.02 Response - NFPA-805 Transition (ME7244)2013-11-11011 November 2013 Safe Shutdown Analysis (SSA) RAI 17.02 Response - NFPA-805 Transition (ME7244) Project stage: Request LIC-13-0179, Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition2013-12-18018 December 2013 Probabilistic Risk Assessment (PRA) RAI Responses 01.j.04, 01.j.05, and 01.j.06 - NFPA-805 Transition Project stage: Other LIC-14-0004, Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition2014-01-24024 January 2014 Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 - NPFA-805 Transition Project stage: Other ML14036A0682014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 12/9/11 Affidavit Executed by C. M. Molnar, Westinghouse, LTR-RAM-II-10-046, Revision 1, Dated 4/22/2011 Project stage: Withholding Request Acceptance ML14036A0832014-02-18018 February 2014 Request for Withholding Information from Public Disclosure, 3/14/12 Affidavit Executed by J. A. Gresham, Westinghouse, Re.: Compact Containing Fire Dynamic Simulator Input Project stage: Withholding Request Acceptance ML14051A3972014-02-20020 February 2014 NFPA 805 IE PRA F&O Tables Project stage: Request ML14051A3882014-02-20020 February 2014 NFPA 805 Fpra F&O Tables Project stage: Request ML14070A5912014-02-28028 February 2014 Supplemental Response to Safe Shutdown Analyses (SSA) Request for Additional Information (RAI) 06 - NFPA-805 Transition Project stage: Supplement ML14115A2972014-04-10010 April 2014 Enclosure 1: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14115A2982014-04-10010 April 2014 Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance -Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement LIC-14-0042, Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2014-04-10010 April 2014 Enclosure 2: Fort Calhoun Station, Unit 1 - Supplement to License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Supplement ML14122A2452014-05-22022 May 2014 Request for Withholding Information from Public Disclosure, 3/26/13 Affidavit Executed by C. M. Molnar, Westinghouse, Re.: LTR-RAM-II-10-046, Rev. 3 Project stage: Withholding Request Acceptance LIC-14-0075, Request Clarifications to Draft National Fire Protection Association (NFPA) 805 Safety Evaluation Report2014-06-11011 June 2014 Request Clarifications to Draft National Fire Protection Association (NFPA) 805 Safety Evaluation Report Project stage: Request ML14098A0922014-06-16016 June 2014 Issuance of Amendment No. 275, Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants (2001 Edition) Project stage: Approval ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Other ML16103A3482016-04-0404 April 2016 Ft. Calhoun, Unit 1 - License Amendment Request (LAR) 16-01; Revised Commitment to Modify FCS Plant Systems as Part of the Implementation of NFPA 805 Project stage: Other LIC-16-0099, License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program2016-11-18018 November 2016 License Amendment Request (LAR) 16-06; Removal of License Condition 3.D., Fire Protection Program Project stage: Request 2013-04-23
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000285/20240032024-10-29029 October 2024 NRC Inspection Report 05000285/2024003 LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24243A1042024-09-12012 September 2024 Proposed Revision to the OPPD FCS DQAP - Request for Additional Information (License No. DPR-40, Docket Nos. 50-285, 72-054, and 71-0256) ML24255A0962024-09-12012 September 2024 License Amendment Request to Revise the License Termination Plan - Request Supplemental Information (License No. DPR-40, Docket No. 50-285) IR 05000285/20240022024-08-21021 August 2024 NRC Inspection Report 05000285/2024002 ML24235A0822024-08-10010 August 2024 Response to Fort Calhoun Station, Unit No. 1 - Phase 1 Final Status Survey Report to Support Approved License Termination Plan - Request for Additional Information - Request for Additional Information (EPID L-2024-DFR-0002) July 8, 2024 ML24180A2082024-07-0808 July 2024 Phase 1 Final Status Survey Reports Request for Additional Information Letter ML24183A3222024-07-0808 July 2024 Proposed Revision to the Omaha Public Power District Fort Calhoun Station Decommissioning Quality Assurance Plan - Acceptance Review LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) IR 05000285/20240012024-06-0505 June 2024 NRC Inspection Report 05000285/2024001 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan ML24079A1702024-03-10010 March 2024 ISFSI, Unit 1 - 10 CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management Review, Commitment Revisions and Revision of Updated Safe LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report ML24019A1672024-01-31031 January 2024 Issuance of Amendment to Renewed Facility License to Add License Condition to Include License Termination Plan Requirements IR 05000285/20230062023-12-21021 December 2023 NRC Inspection Report 05000285/2023006 LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information IR 05000285/20230052023-11-0202 November 2023 NRC Inspection Room 05000285/2023005 ML23276A0042023-09-28028 September 2023 U.S. EPA Response Letter to NRC Letter on Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites MOU - Fort Calhoun Station, Unit 1 – (License No. DPR-40, Docket No. 50-285) IR 05000285/20230042023-09-13013 September 2023 NRC Inspection Report 05000285/2023-004 LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 ML23234A2412023-08-18018 August 2023 Email - Letter to M Porath Re Ft Calhoun Unit 1 LTP EA Section 7 Informal Consultation Request ML23234A2392023-08-18018 August 2023 Letter to B Harisis Re Ft Calhoun Unit 1 LTP EA State of Nebraska Comment Request.Pdf IR 05000285/20230032023-07-10010 July 2023 – NRC Inspection Report 05000285/2023003 ML23082A2202023-06-26026 June 2023 Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska ML23151A0032023-06-0505 June 2023 – Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 IR 05000285/20230022023-06-0505 June 2023 NRC Inspection Report 05000285/2023002 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000285/20230012023-02-24024 February 2023 NRC Inspection Report 05000285/2023001 LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML23020A0462023-01-19019 January 2023 Threatened and Endangered Species List: Nebraska Ecological Services Field Office IR 05000285/20220062023-01-0505 January 2023 NRC Inspection Report 05000285/2022-006 ML22357A0662022-12-30030 December 2022 Technical RAI Submittal Letter on License Amendment Request for Approval of License Termination Plan IR 05000285/20220052022-10-26026 October 2022 NRC Inspection Report 05000285/2022-005 ML22276A1052022-09-30030 September 2022 Conclusion of Consultation Under Section 106 NHPA for Ft. Calhoun Station LTP ML22258A2732022-09-29029 September 2022 Letter to John Swigart, SHPO; Re., Conclusion of Consultation Under Section 106 Hnpa Fort Calhoun Station Unit 1 ML22265A0262022-09-26026 September 2022 U.S. Nuclear Regulatory Commissions Analysis of Omaha Public Power Districts Decommissioning Status Report (License No. DPR-40, Docket No. 50-285) IR 05000285/20220042022-09-14014 September 2022 NRC Inspection Report 05000285/2022004 ML22138A1252022-08-0303 August 2022 Letter to Mr. Timothy Rhodd, Chairperson, Iowa Tribe of Kansas and Nebraska, Re., Ft Calhoun LTP Section 106 ML22138A1222022-08-0303 August 2022 Letter to Mr. John Shotton, Chairman, Otoe-Missouria Tribe of Indians, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22138A1302022-08-0303 August 2022 Letter to Justin Wood, Principal Chief, Sac and Fox Nation, Oklahoma, Re., Ft Calhoun LTP Section 106 ML22214A0922022-08-0303 August 2022 Letter to Stacy Laravie, Thpo, Ponca Tribe of Nebraska, Re., Ft Calhoun LTP Section 106 2024-09-18
[Table view] |
Text
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
Upon removal of the Attachment, this letter is Decontrolled.
~~
jjjjjjjj Omaha Public Power Oistrict 444 South 1(jh Street Mall Omaha, NE 68102-2247 LlC-14-0009 February 28, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station, Unit No. 1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285
Subject:
Supplemental Response to Safe Shutdown Analyses (SSA) Request for Additional Information (RAI) 06 - NFPA-805 Transition (ME7244)
References:
- 1. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk), License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) at Fort Calhoun Station, dated September 28, 2011 (LlC-11-0099) (ML112760660)
- 2. Letter from OPPD (D. J. Bannister) to NRC (Document Control Desk),
Responses to Requests for Additional Information Re: License Amendment Request 10-07 to Adopt NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants," 2001 Edition, at Fort Calhoun Station, dated July 24, 2012 (LlC-12-0083) (ML12208A131)
- 3. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk),
Probabilistic Risk Assessment (PRA) RAI Responses 26.01 and 24.01 -
NFPA-805 Transition (ME7244), dated January 27,2014 (LlC-14-0004)
The purpose of this letter is to supplement the Omaha Public Power District's (OPPD) response to Safe Shutdown Analyses (SSA) RAI 06 as submitted to the NRC in Reference 2. Page 87 of the Enclosure to Reference 2 noted that the revision to the License Amendment Request (LAR)
(Reference 1), Transition Report, Attachment C, Table B-3 provided on the SharePoint Portal would be reflected in the NFPA-805 transition LAR supplement.
However, as noted in Reference 3, OPPD will not be supplementing the NFPA-805 LAR because the information is contained in OPPD's RAI responses. Therefore, the attachment to this letter is provided to docket the information placed on the Share Point Portal in response to SSA RAI 06.
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
Upon removal of the Attachment, this letter is Decontrolled.
Employment with Equal Opportunity
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
Upon removal of the Attachment, this letter is Decontrolled.
U. S. Nuclear Regulatory Commission LI C-14-0009 Page 2 Attachment C (Table 8-3) of the LAR was updated to incorporate the response to SSA RAI 006.
Please note that the information for fire area 06-9 (page C-101 of Attachment C, Table 8-3) was updated and thus is different from the information uploaded to the Share Point Portal in the original SSA RAI 006 response. Attachment C (Table 8-3) was also updated to identify fire protection features that are "Required for Risk Significance," as credited in the final fire PRA model supporting the response to PRA RAI 24.01.
OPPD requests that the Attachment, which contains sensitive security-related information, be withheld from public disclosure pursuant to 10 CFR 2.390.
No regulatory commitments are contained in this letter.
In accordance with 10 CFR 50.91, a copy of this letter, without the attachment, is being provided to the designated State of Nebraska official.
If you should have any questions regarding this submittal or require additional information, please contact Mr. 8i11 R. Hansher, Supervisor-Nuclear Licensing, at 402-533-6894.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 28, 2014.
Louis P. Cortopassi Site Vice President and CNO LPC/BJVImle
Attachment:
LAR Attachment C Table 8-3 Fire Area Transition c: M. L. Dapas, NRC Regional Administrator, Region IV (w/o Attachment)
J. W. Sebrosky, NRC Senior Project Manager (w/o Attachment)
J. C. Kirkland, NRC Senior Resident Inspector (w/o Attachment)
Manager Radiation Control Program, Nebraska Health & Human Services, R & L Public Health Assurance, State of Nebraska (w/o Attachment)
SECURITY-RELATED INFORMATION - WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390 The Attachment to this letter contains security-related information.
Upon removal of the Attachment, this letter is Decontrolled.