NRR E-mail Capture - Beaver Valley Power Station, Units 1 and 2 - Acceptance of Requested Licensing Action Request to Change Cyber Security Implementation Plan Milestone 8 Completion Date (TAC Nos. MF5879 and Mf 5880)
ML15090A341
Person / Time
Site: Beaver Valley
Issue date: 03/31/2015
From: Taylor Lamb
Plant Licensing Branch 1
To: Lentz T
First Energy Services
References
TAC MF5879, TAC MF5880
Download: ML15090A341 (2)


Text

NRR-PMDAPEm Resource From: Lamb, Taylor Sent: Tuesday, March 31, 2015 10:10 AM To: Lentz, Thomas A. (Licensing) (talentz@firstenergycorp.com)

Cc: Lashley, Phil H. (phlashley@firstenergycorp.com)

Subject:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REQUEST TO CHANGE CYBER SECURITY IMPLEMENTATION PLAN MILESTONE 8 COMPLETION DATE (TAC NOS. MF5879 AND MF 5880)

Dear Mr. Thomas Lentz,

By letter dated March 19, 2015 (Agencywide Documents Access and Management System Accession No. ML15084A346), FirstEnergy Nuclear Operating Company submitted a license amendment request for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS). The proposed amendment revises the cyber security plan Milestone 8 full implementation date as set forth in the cyber security plan implementation schedule.

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-7128.

Taylor A Lamb Project Manager U.S. Nuclear Regulatory Commission NRR/DORL/LPLI-2 MS: OWFN-8B1A Phone: 301-415-7128 1

Hearing Identifier: NRR_PMDA Email Number: 1960 Mail Envelope Properties (Taylor.Lamb@nrc.gov20150331100900)

Subject:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: REQUEST TO CHANGE CYBER SECURITY IMPLEMENTATION PLAN MILESTONE 8 COMPLETION DATE (TAC NOS. MF5879 AND MF 5880)

Sent Date: 3/31/2015 10:09:59 AM Received Date: 3/31/2015 10:09:00 AM From: Lamb, Taylor Created By: Taylor.Lamb@nrc.gov Recipients:

"Lashley, Phil H. (phlashley@firstenergycorp.com)" <phlashley@firstenergycorp.com>

Tracking Status: None "Lentz, Thomas A. (Licensing) (talentz@firstenergycorp.com)" <talentz@firstenergycorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2538 3/31/2015 10:09:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: