Application for Amend to License NPF-21,deleting Channel Check from Tech Spec Table 4.3.2.1-1 Isolation Actuation Instrumentation Surveillance Requirements.Fee Paid
ML17279A319
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/01/1987
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17279A320 List:
References
GO2-87-188, TAC-65568, NUDOCS 8706110010
Download: ML17279A319 (6)


Text

REQ TO INFORMATION DISTRIBU N TEN (RIDS)

ACCESSION NBR: 8706110010 DOC. DATh: 87/06/01 NOTARIZED: YES DOCKET 0

)FAC IL: 50 397 WPPSS Nuc I ear Pro J ecto Unit 2z Wash ing ton Pub li c Pove 050003 P7 AUTH. NAME I AUTHOR AFF LIAT IQN BQRENBENi G. C. Washington Public Power Supply System:

RECIP. NANE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Application for amend to License NPF-2f revising Tech Specs isolation actuation instrumentati on surveillance requirementsi Table 4. 3. 2. i-i.

DISTRIBUT'IQN CODE: A001D COPIES RECEIVED: LTR ENCL BI ZE:

TITLE: QR Submittal: General Distr ibution NOTES:

I REC IP ENT COPIES RECIP I ENT COP IES ID CODE/NAI'1E LTTR ENCL ID CODE/MANE LTTR ENCL PD5 LA 0 PD5 PD 5 5 BANWORTH> R i INTERNAL: ACRB 6 6 ARII/DAF/LFMB NRR/DEBT/ADE NRR/DEST/ADS NRR/DOEA/TSB V.RR /P&h I LRB QGC/HDB2 0 0 01

<EXTERNAL: EGSrG BRUSKEi B 1 1 LPDR NRC PDR 1 1 NBIC g~~,g u caecal'SO<~

TOTAL NUBBER QF COP IEB REQUIRED: LT1R 24 ENCL 21

~ I ~ ~

f I

/ ~

g ~

, >j I

R lt

'il I

- )I I

l

'I

Washington Public Power Supply System 3000George Washington Way P.O. Box968 Richland, Washington 99352-0968 (509)372-5000 June 1, 1987 G02-87-188 Docket No. 50-397 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS - ISOLATION ACTUATION INSTRUMENTATION SURVEI LLANCE REQUIREMENTS, TABLE 4. 3. 2. 1-1

References:

1) Letter, G02-83-842, G. C. Sorensen (SS} to A. Schwencer (NRC), "Equipment Qualification Report for Safety-Related Equipment, September 1983", dated September 16, 1983
2) License Condition 2.C.(28), Equipment Qualification and License Amendment 8 In accordance with the Code of Federal Regulations, Title 10, Parts 50. 90 and 2 101, the Supply System hereby requests an amendment to the WNP-2

~

Technical Specifications. This amendment is being submitted to recognize a change in the facility required by 10CFR50.49.

Prior to November 30, 1985 and in order to close JIO-24 (Reference 1), the Supply System replaced four level indicating trip switches that provide the Reactor Water Level 2 containment isolation function, with Class 1E qualified instruments. The instruments'dentification numbers were MS-LITS-26A through D. The new design configuration relies upon non-indicating level switches for the isolation function only. The subject Table by step 4.3.2. 1-1, 2. c on page 3/4 3-22 requires that a channel check be performed once per shift during operational conditi ons 1, 2, 3, and 8. This requirement is typical for those types of devices used that provide both a trip and indi cating function or those devices that can be checked by derivation of the sensed parameter. Therefore, qualified level switches of the new design neither require nor support the performance of a channel check.

8>phllppip PDR 87pgp1 ADOCK P5PPP397 PDR p iJl~~a.globo@

I gage June Two 1 1987

~ ~ Q ~

REQUEST- FOR AMEND. TO TS - ISOLATION ACTUATION INSTRUMENTATION SURVEILLANCE REQUIREMENTS, TABLE 4.3.2;- 1-1 This amendment is merely an administrative deletion of a channel check that can no longer be performed, nor is it required. It has resulted from the proper implementation of a related license condition. For those devices designed to provide an indication function, other devices sharing a common reference leg to the trip units are channel checked in accordance with Table 4.3.7.5-1, Accident Monitoring Instrumentation Surveillance Requirements.

A review of, this request per 10CFR50. 59 and 50.92 has been conducted to conclude that no unreviewed safety questions or signifi cant hazards will result relative to the change because it does not:

1) Involve a significant increase in the probability or consequences of an accident previously evaluated because the instruments were approved for replacement by the NRC in License Amendment 8 as a recognized exception to the March 31, 1985 deadline imposed by License Condition 2.C.(28) and 10CFR50.49. The replacement devices are environmentally qualified and are specifically applied to perform the design bases function during the previously evaluated accident.
2) Create the possibi lity for an accident or malfunction of a different type than any previously evaluated because the logic design configura-tion is not altered, thus providing similar component fai lure protection and the devices used are environmentally qualified.
3) Involve a significant reduction in a margin of safety because the replacement required was recognized as an improvement over the existing components by replacement with qualified equipment and as such, represents an improvement in the margin of safety.

This change has been reviewed and approved by the WNP-2 Plant Operations Committee and the Supply System Corporate Nuclear Safety Review Board.

In accordance with 10CFR50.170.12(c), an application fee of One hundred fifty dollars ($ 150.00) accompanies this request. In accordance with 10CFR50.91, .the State of Washington has been provided a copy of this letter.

Should you have any questions regarding this matter, please contact Mr.

P. L. Powell, Manager, HNP-2 Licensing.

Very truly yours, G. C. orensen, Manager Regulatory Programs HLA/MRW/tmh Attachments cc: C Eschel s EFSEC DL Williams - BPA JB Martin - NRC RV NRC Site Inspector NS Reynolds .-"

BCPSR RB Samworth - NRC

~ ~

STATE OF WASHINGTON )

Subject:

)

County of Benton )

I, G. C. Sorensen, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it are true.

. S ensen, Manager Regula ory Programs On this day personally appeared before me G. C. Sorensen to me known to be the individual who executed the foregoing instrument and acknowledge that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIYEG under my hand and seal this ~~ day of , 1987.

otary Pu ic in orte State of Washington Residing at ne .BR

~ ~ ~ ~

I C'i~