ML17313A197

From kanterella
Revision as of 03:28, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Class 1E,125 Volt,Dc Battery Load Profiles That NRC Requested During 980106 Telcon.Battery Load Profiles Submitted as Addl Info for Ltr Dtd 971217,requesting Amend to TS 3/4.8.2 & Bases Section 3/4.8
ML17313A197
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/28/1998
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-04066-JML-S, 102-4066-JML-S, NUDOCS 9802110005
Download: ML17313A197 (11)


Text

CATEGORY 1~

DISTRIBUTIO&SYSTEM (RIDS)

REGULAT RY INFORMATION ACCESSION~NBR:9802110005 DOC.DATE: 98/01/28 NOTARIZED: NO DOCKET FACIL:ST+'-50.-,528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 "S'l8$-50~'529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Class 1E,125 Volt,DC battery load profiles that NRC requested during 980106 telcon.Battery load profiles submitted as addi info for ltr dtd 971217. A DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution I ENCL 3 SIZE: (P T E

NOTES: STANDARDIZED PLANT 0500052+

Standardized. plant. 05000529 Standardized plant. 0500053 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR'ENCL ID CODE/NAME LTTR ENCL PD4-2 LA 1 1 PD4-2 PD 1 1 .

CLIFFORD, J 1 1 INTERNAL: ACRS 1 1 CENTER 1 1 1 NRR/DE/ECGB/A 1 1 1 1 NRR/DRCH/H1CB 1 1 NRR/DSSA/SPLB 1 ' 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 D OGC/HDS2 1 0 0

EXTERNAL: NOAC 1 1 NRC PDR 1 1 E

N NOTE TO ALL NRZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

Camellment. Inenatlaa &oyy.

James M. Levine TEL (602)393-5300 Mail Station 7602 Palo Verde Nuclear Senior Vice President FAX (602)3934077 P.O. Box 52034 Generating Station Nuclear Phoenix, AZ 65072-2034 102-04066 JML/SAB/RMW U.S. Nuclear Regulatory Commission January 28, 1998 ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

References:

1. Letter 102-04053-JML/SAB/RMW, Request for Amendment to Technical Specification (TS) 3/4.8.2, Electrical Power Systems, D.C.

Sources, and Bases Section 3/4.8, dated December 17, 1997, from.

J. M. Levine, Senior Vice President, Nuclear, APS to USNRC.

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN 50-628/529/530 Class 1E, 126 Volt, D.C., Battery Load Profiles Enclosed are the Class 1E, 125 Volt, D.C., battery load profiles that you requested during the telephone conversation that was held between APS and members of your staff on January 06, 1998. Battery "A" has the highest equipment loading of each of the four Class 1E, 125 Volt, D.C., batteries. The performance test that is performed on each of the batteries has been superimposed on the duty cycle load profile for Battery "A" to demonstrate how the performance test bounds the duty cycle load profiles for all of the Class 1E, 125 Volt, D.C., batteries. The battery load profiles are being submitted as additional information for Reference 1.

Please contact Scott A. Bauer at (602) 393-5978 if you have any questions or require additional information.

Sincerely,

'P802ii0005 980i28 PDR ADQCK 05000528>

P PDR,)

JML/SAB/RMW/rlh i 3.uo3.2 Enclosure cc: E. W. Merschoff (all w/Enclosure)

K. E. Perkins IIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII,IIII J. W. Clifford J. H. Moorman

ENCLOSURE

t t

II II R

60 Performance Test 50 (585 amps for 120 minutes to 1.86 volts per cell)

I54 40 240 158 0 20 40 60 80 100 120 TIME IN MINUTES

I 20 40 60 80 TIME IN MINUTES

201 20 40 60 80 120 TIME IN MINUTES

20 40 60 . 80 100 120 TlME 1N MINVTES