Proposed Tech Spec Pages 3.7/4.7-19 & 3.7/4.7-20,relaxing Control Room Emergency Ventilation Sys Operability Requirements
ML18033A332
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/17/1988
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18033A330 List:
References
TAC-R00447, TAC-R00448, TAC-R00449, TAC-R447, TAC-R448, TAC-R449, TVA-BFN-TS-253, NUDOCS 8808250254
Download: ML18033A332 (16)


Text

ENCLOSURE l PROPOSED TECHNICAL SPECIFICATION REVISION BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (TVA BFN TS 253) 8808250254 880817 PDR ADOGK 0500025'r" P PDG

7 4 7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control Room Emer enc Ventilatio 4.7.E Control Room Emer enc Ventilation

  • l. Except as specified in l. At least once every 18 months, Specification 3.7.E.3 below, the pressure drop across the both control room emergency combined HEPA filters and pressurization systems charcoal adsorber banks shall shall be OPERABLE at all be demonstrated to to be less times when any reactor than 6 inches of water at system vessel contains irradiated design flov rate (+ 10%).

fuel.

2. a. The results of the in-place 2 ~ a ~ The tests and sample cold DOP and halogenated analysis of Specification hydrocarbon tests at design 3.7.E.2 shall be performed flovs on HEPA filters and at least once per operating charcoal adsorber banks cycle or once every shall show g99% DOP removal 18 months, whichever occurs and g99% halogenated first for standby service hydrocarbon removal when or after every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of tested in accordance with system operation and ANSI N510-1975. following significant painting,. fire, or chemical release in any ventilation zone communicating with the system.
b. The results of laboratory b. Cold DOP testing shall be carbon sample analysis shall performed after each show g90% radioactive methyl complete or partial iodide removal at a velocity replacement of the HEPA when tested in accordance. filter bank or after any with ASTM D3803 structural maintenance on (130 C, 95% R.H.). the system housing.
c. System flov rate shall be C~ Halogenated hydrocarbon shown to be within F10% testing shall be performed design flow when tested in after each complete or accordance with ANSI partial replacement of the N510-1975 . charcoal adsorber bank or after any structural maintenance on the 'system housing.
  • LCO not applicable until just d. Each circuit shall be operated withdraving the first control rod prior'o at least 10 hours every month.

for the purpose of making the reactor critical from the unit 2 cycle 5 outage.

BFN 3.7/4.7-19 Unit 1

7 4 CONTAINMENT SYST MS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control Room Emer enc 4.7.E. Control Room Emer enc Ventilation Ventilation

3. From and after the date that 3. At least once every 18 months, one of the control room automatic initiation of the emergency pressurization control room emergency systems is made or found to pressurization system shall be be INOPERABLE for any reason, demonstrated.

reactor operation or refueling operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.

  • 4. If these conditions cannot be 4. During the simulated automatic met, reactor shutdown shall be 'ctuation test of this system initiated and all reactors shall be in Cold Shutdown (see Table 4.2.G), it shall be verified that the following within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for reactor dampers operate as indicated:

operations and refueling operations shall be terminated Close: FCO-150 B, D, E, and F within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Open: FCO-151 FCO-152

  • LCO not applicable until just prior to withdrawing the first control rod for the purpose of making the reactor critical from the unit 2 cycle 5 outage.

BFH 3.7/4.7-2O Unit 1

7 4 7 CONTA NMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control Room Emer enc Ventilation 4.7.E Control Room Emer enc Ventilation

  • 1. Except as specified in 1. At least once every 18 months, Specification 3.7.E.3 below, the pressure drop across the both control room emergency combined HEPA filters and pressurization systems charcoal adsorber banks shall shall be OPERABLE at all be demonstrated to to be less than times when any reactor 6 inches of water at system vessel contains irradiated design flow rate (+ 10%).

fuel.

2. a. The results of the in-place 2~ a ~ The tests and sample cold DOP and halogenated analysis of Specification hydrocarbon tests at design 3.7.E.2 shall be performed flows on HEPA filters and at least once per operating charcoal adsorber banks cycle or once every shall show g99% DOP removal 18 months, whichever occurs and g99% halogenated first for standby service hydrocarbon removal when or after every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of tested in accordance with system operation and ANSI N510-1975. following significant painting, fire, or chemical release in any ventilation zone communicating with the system.
b. The results of laboratory b. Cold DOP testing shall be carbon sample analysis shall performed after each show 290% radioactive methyl complete or partial iodide removal at a velocity replacement of the HEPA when tested in accordance filter bank or after any with ASTM D3803 ~

structural maintenance on (130'C, 95% R.H.). the system housing.

c. System flow rate shall be C ~ Halogenated hydrocarbon shown to be within gl0% testing shall be performed design flow when tested in after each complete or accordance with ANSI partial replacement of the N510-1975. charcoal adsorber bank or after any structural maintenance on the system housing.
  • LCO not applicable until just prior d. Each circuit shall be operated to withdrawing the first control rod at least 10 hours every month.

for the purpose of makixg the reactor critical from the unit 2 -cycle 5 outage.

BFN 3.7/4.7-19 Unit 2

4 7 CO AINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control Room Eme enc 4.7.E. Contro Room Emer enc Ventilation 1

3. From and after the date that 3. At least once every 18 months, one of the control room automatic initiation of the emergency pressurization control room emergency systems is made or found to pressurization system shall be be INOPERABLE for any reason, demonstrated.

reactor operation or refueling operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.

  • 4. If these conditions cannot be 4. During the simulated automatic met, reactor shutdown shall be actuation test of this system initiated and all reactors (see Table 4.2.G), it shall be shall be in Cold Shutdown verified that the following within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for reactor dampers operate as indicated:

operations and refueling operations shall be terminated Close: FCO-150 B, D, E, and F within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Open: FCO-151 FCO-152

  • LCO not applicable until just prior to withdrawing the first control rod for the purpose of making the reactor critical from the unit 2 cycle 5 outage.

BFN 3.7/4.7-2O Unit 2

4. 7

~

CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control Room Emer enc Ventilation 4.7.E Contro Room Eme e c Ventilation

l. Except as specified in 1. At. least once every 18 months, Specification 3.7.E.3 below, the pressure drop across the both control room emergency combined HEPA filters and pressurization systems charcoal adsorber banks shall shall be OPERABLE at all be demonstrated to to be less than times when any reactor 6 inches of water at'system vessel contains irradiated design flow rate (g 10%).

fuel.

2. a. The results of the in-place 2. a. The tests and sample cold DOP and halogenated analysis of Specification hydrocarbon tests at design 3.7.E.2 shall be performed flows on HEPA filters and at least once per operating charcoal adsorber banks cycle or once every shall show y99% DOP removal 18 months, whichever occurs and g99% halogenated first for standby service hydrocarbon removal when or after every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of tested in accordance with system operation and ANSI N510-1975. following significant painting, fire, or chemical release in any ventilation zone communicating with the system.
b. The results of laboratory b. Cold DOP testing shall be carbon sample analysis shall performed after each show g90% radioactive methyl complete or partial iodide removal at a velocity replacement of the HEPA when tested in accordance filter bank or after any with ASTM D3803 . structural maintenance on (130'C, 95% R.H.). the system housing.
c. System flow rate shall be c. Halogenated hydrocarbon shown to be within +10% testing shall be performed design flow when tested in after each complete or accordance with ANSI partial replacement of the N510-1975. charcoal adsorber bank or after any structural maintenance on the system housi~g.
  • LCO not applicable until just prior d. Each circuit shall be operated to withdrawing the first control rod at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> every month.

for the purpose of making the reactor critical from the unit 2-cycle 5 outage.

BFN-Unit 3 3.7/4.7-19

.7 4.7 CONTAINMENT SYSTEMS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.7.E. Control Room Emer enc 4.7.E. Control Room Emer enc Ventilation Ventilation

3. From and after the date that 3. At least once every 18 months, one of the control room automatic initiation of the emergency pressurization control room emergency systems is made or found to pressurization system shall be be INOPERABLE for any reason, demonstrated.

reactor operation or refueling operations is permissible only during the succeeding 7 days unless such circuit is sooner made OPERABLE.

  • 4. If these conditions cannot be 4. During the simulated automatic met, reactor shutdown shall be 'ctuation test of this system initiated and all reactors shall be in Cold Shutdown (see Table 4.2.G), it shall be, verified that the following within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for reactor dampers operate as indicated:

operations and refueling operations shall be terminated Close: FCO-150 B, D, E, and F within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Open: FCO-151 FCO-152 LCO not applicable until just prior to withdrawing the first control rod for the purpose of making the reactor critical from the unit 2 cycle 5 outage.

BFN-Unit 3 3.7/4.7-20

ENCLOSURE 2 DESCRIPTIOH AHD JUSTIFICATION BROMHS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 Descri tion of Chan e The Browns Ferry Nuclear (BFH) Plant Technical Specifi.cations require specific safety-related systems to be operable during the handling of spent fuel, operations over the spent fuel pool, and loading fuel in the reactor vessel.

BFH is proposing the attached temporary changes to units 1, 2, and 3 technical specifications for the Control Room Emergency Ventilation System (CREVS).

This request involves denoting limiting conditions for operati.ons (LCO) 3.7.E.1, 3.7.E.3, and 3.7.E.4 by an asterisk and defining them as not, being applicable until just before the withdrawal of the first control rod for the purpose of making the reactor critical from the unit 2, cycle 5 outage.

Reason for Chan e The proposed temporary changes to the technical specifi.cations, as shown in attachment 1, are to provide a relaxation of the system operability requirements for the CREVS to support the BFN fuel load activities and the addit.ional activities needed to support, unit 2 restart, just before the withdrawal of the first control rod for the purpose of making, the reactor critical from the unit. 2, cycle 5 outage.

Technical specification, LCO 3.7.E.1, presently requires both CREVS to be operable at all times when any reactor vessel contains irradiated fuel, except as specified in LCO 3.7.E.3. Mhen one of the CREVS is found or made to be inoperable, refueling operations are permissible only for the succeeding seven days (LCO 3.7.E.3). If both CREVSs are inoperable, refueling operations must terminate within two hours (LCO 3.7.E.4).

refuel BFH submitted and HRC approved (safety evaluation report dated July 20, 1988) technical specification amendments (151, 147, 122) which allow both CREVSs to be inoperable while no fuel was in any reactor vessel. This was based on the fact that the BFH fuel has decayed for at least, three years, therefore, the

. radiological consequences due to potential fuel handling accident are far below that, evaluated by the current BFN Final Safety Analysis Report.

Additional activities are required for uni.t 2 restart which involve loading in the unit 2 reactor vessel (RV) and performing, tests (e.g., RV

...hydrostatic test) with,the RV intact.. These. activities,.are.no,different than a typical refueling operation. With CREVS inoperable, current technical specifications, LCOs 3.7.E.1, 3.7.E.3, and 3.7.E.4, would prevent loading fuel into. the reactor vessel. The ability to temporarily relax the CREVS operability requirements during, these activities would greatly facilitate currently planned unit 2 restart, work whi.le not compromising nuclear safety.

Reason for Chan e (Cont'd)

The proposed technical specification changes are written to allow these reload and testing operations to take place even though work on the CREVS may still be in progress. Since the CREVS is a common system and since its operability is required for the operation of any unit, the technical specification change is written to ensure that LCOs 3.7.E.1, 3.7.E.3, and 3.7.E.4 become applicable just before the withdrawal of the first control rod ~ for the purpose of making unit 2 critical from the current outage.

Justification for Chan e The CREVS is designed to protect the control room operators by pressurizing the main control room (MCR) with filtered air during a fuel handling accident condition. The CREVS uses charcoal adsorbers to assure the removal of radioactive iodine from the air and high efficiency particulate absolute (HEPA) filters for removing particulate matter. These filters and adsorbers will keep the resulting doses, in the event of a design basis fuel handling accident, less than the allowable levels stated in criterion 19 of the General Design Criteria for Nuclear Power Plants Appendix A to 10 CFR 50.

TVA is proposing to relax the operability requirements (3.7.E.l, 3.7.E.3, and 3.7.E.4) of the CREVS until just before the withdrawal of the first control rod for the purpose of making the reactor critical. At this point, the existing technical specifications LCOs 3.7.E.l, 3.7.E.3, and 3.7.E.4 will become applicable. This temporary change will enable work to be performed on the CREVS and the associated control room HVAC ducting, as necessary. This consists of a one time change to the technical specifications.

The filtration function that the CREVS provides is not presently needed in 'the event of a fuel handling accident. 10 CFR 50 Appendix A (GDC 19) requires that in the event of an accident, the radiation dosage to the occupants in the MCR not exceed 5 REM whole body or its equivalent to any part of the body for the duration of the accident. This same radiation dose limit is endorsed in section 6.2.4 of NUREG 0800. TVA has evaluated the potential consequences to the control room operators in the event of a fuel handling accident.

Currently, all three units are defueled with the irradiated fuel stored in the spent fuel pool. The irradiated fuel has decayed for approximately three years and the, only remaining volatile fission product of any significance's Kr-85. Kr-85 is an inert gas that is not filtered by the CREVS.

Essentially, no iodine is present in the decayed fuel. Because of the "scrubbing" effect of the fuel pool water and since Kr-85 is the only radioi. otopc 'of any significance, virtually no particulates .would enter the CREVS intake ductwork. Since essentially no iodine is present in the fuel, the inhalation dose is negligible, and therefore, assuming the failure of two assemblies (i.e., 124 fuel pins), the MCR doses would be .002 REM whole body gamma, 0.200 REM beta, and 0.0 REM inhalation. These calculated doses are far below the dose level acceptable in the event of an accident. In order to reach the dose limit of 10 CFR 50 Appendix A, approximately 300 of the assemblies currently stored in the BFN fuel pool would have to fail.

1756y/SJL

Justification for Chan e (Cont'd)

Other events that might occur during fuel load were reviewed. The only other event that has a potential to cause fuel damage, other than the fuel handling accident, is a pipe break inside the primary containment after the fuel has been loaded in the vessel. This would result in a loss of reactor water inventory. The BFN Technical Specifications require the Core and Containment Cooling System (CCCS) to be operable when there is irradiated fuel in the reactor vessel (3.5.A). Therefore, if a pipe break occurred, the CCCS would provide an adequate supply of water to mitigate any fuel cladding damage which would result in a release of fission products. Again, because of the current fission product inventory of the fuel, the only significant isotope is Kr-85.

Since CREVSs function is to filter any iodine, perform any mitigation function.

it would not be needed to The operation of the CREVS is not needed to mitigate any of the applicable design basis events which could occur during the time between loading fuel in the unit 2 reactor vessel and just before the withdrawal of the first control rod for the purpose of making the reactor critical from the current outage.

, For this reason, TVA is requesting the temporary relaxation of the CREVS technical specifications as specified in attachment 1. This relaxation will allow unit restart work to proceed and not compromise the health and safety of the public.

1756y/SJL

ENCLOSURE 3 DETEBHIHATIOH OF HO SIGNIFICANT HAZARDS CONSIDERATION BROMHS PERRY NUCLEAR PLANT UNITS 1, 2, AND 3 Descri tion of Pro osed Technical S ecification Amendment The proposed amendment to the Browns Ferry Nuclear Pla'nt Units 1, 2, and 3 Technical Specifications requests temporary changes to the operability requirements for the Control Room Emergency Ventilation System (CREVS). This will allow system modifications and maintenance needed for restart to proceed in parallel with those activities just before the withdrawal of the first control rod making the reactor critical from the unit 2, cycle 5 outage.

Basis for Pro osed No Si nificant Hazards Consideration Determination NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to an operating license involves no significant hazards considerations if of the facility in accordance with the proposed amendment would not (1) operation involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduct.ion in a margin of safety.

1. The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed temporary changes to the technical specifications involve relaxations to system operability requirements for the CREVS during leading to and-just before withdrawal of the first control rod those'ctivities for the purpose of making the reactor critical from the unit 2, cycle 5 outage. The fuel that will be moved from the spent fuel pool to the reactor vessel has decayed for approximately three years, thus reducing the need for this system to be operable by the technical specifications for postaccident iodine removal.

The fuel handling accident evaluated in the Final 'Safety Analysis Report (FSAR), Section 14.6.4, represents the most, severe event. in tecum of radioactive release and dose consequences that, are applicable. The movement. of the fuel from the fuel pool to the reactor vessel is a typical refueling operation in which the current.FSAR analysis is still valid.

.The current conditions of. the fuel are. well within the bounds of the FSAR analysis. The FSAR calculations used freshly irradiated fuel (unloaded from the core 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reactor shutdown) which contains large amounts of fission products, specifically iodine.- The irradiated being handled has decayed approximately three years and- the only fuel'resently remaining volatile fission product of any significance is Kr-85, which is an inert gas. Because of this decay time, there is essentially no iodine present and therefore no need for the operability of this system-with iodine removal capability.

Basis for Pro osed No Si ficant Hazards Consideration Determination (Cont'd)

The proposed temporary changes to the technical specifications do not affect the precursors for any accident analysis and therefore do not involve a significant increase in the probability of an accident previously evaluated. The present required availability of systems in the technical specifications is based on FSAR accident analysis assumptions and limitations. The present condition of the fuel in the spent fuel pool is such that over 300 assemblies would have to fail before the FSAR limiting assumptions for releases and dose consequences could be reached, thus allowing a reduction in the number of systems required to mitigate such a limiting event. The requested relaxation in system operability for the CREVS has been evaluated and a determination reached that the present FSAR assumptions and limitations will be maintained. Therefore, the proposed temporary changes do not involve a significant increase in the consequences of an. accident previously evaluated.

2. The proposed amendment does not create the possibility of a new or different kind of accident from an accident previously evaluated. The proposed temporary changes will relax present system however, no new modes of plant operations are introduced operability'equirements, which could contribute to the possibility of a new or different kind of accident. The fuel handling accident is the most severe event that could occur during fuel load or any other activity being conducted just before withdrawal of the first control rod for the purpose of making the reactor critical from the unit 2, cycle 5 outage.
3. The proposed amendment does not involve asignificant reduction in a margin of safety. The proposed temporary technical specification changes will reduce the'perability requirements of the CREVS during fuel load and those activities leading to the withdrawal of the first control rod for the purpose of making the reactor critical from the current outage.

However, the irradiated fuel has decayed for approximately three years and the only remaining volatile fission product of any significance is Kr-85.

Essentially, no iodine is present in the decayed fuel. Because of the "scrubbing" effect of the fuel pool water and since Kr-85 is the only radioisotope of any significance, virtually no radioactive particulates would be present in the CREVS intake ductwork. There is essentially no iodine currently present in the CREVS intake ductwork. Since essentially no iodine is currently present in the fuel, the filtration function that CREVS provides would not be needed until .after reactor- critically in which the production of'iodine would begin. Thus, the relaxation in the system operability requirements for CREVS until just before the withdrawal of the first control rod for the purpose of making the reactor critical from the current outage allows restart work to be completed and does not reduce the margin of safety.

1756y/SJL

e Basis for Pro osed No Si nificant Hazards Consideration Determination (Cont'd)

The proposed temporary changes will ensure that the appropriate safety-related systems needed to mitigate a fuel handling accident are operable and will be able to perform their intended safety function if called upon. Therefore, the proposed changes do not represent a significant reduction in a margin of safety.

Determination of Basis for Pro osed No Si nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration exists, TVA has made a proposed determination that the application involves no significant hazards consideration.