ML18319A096

From kanterella
Revision as of 16:23, 2 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
University of Missouri-Columbia Research Reactor, Supplemental Information to Support a Revision to the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CPR 50.90
ML18319A096
Person / Time
Site: University of Missouri-Columbia
Issue date: 11/13/2018
From: Meffert B, Robertson J
Univ of Missouri - Columbia
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18319A096 (4)


Text

UNIVERSITY of MISSOURI RESEARCH REACTOR CENTER November 13, 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

REFERENCE:

Docket No. 50-186 University of Missouri-Columbia Research Reactor Renewed Facility Operating License No. R-103

SUBJECT:

Supplemental Information to support a revision to the Technical Specifications appended to Renewed Facility Operating License No. R-103 pursuant to 10 CPR§ 50.90 By letter dated April 17, 2018, the University of Missouri-Columbia Research Reactor (MURR) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to revise Technical Specification (TS) 3.7, "Radiation Monitoring Systems and Airborne Effluents," and TS 6.2, "Review and Audit."

On October 4, 2018, during a call between MURR and NRC staff, a discussion was held about improving the clarity and removing any potential ambiguity to TS 6.2.b. TS 6.2.b was revised based on that discussion. By letter dated October 8, 2018, MURR submitted this change to the NRC.

On November 1, 2018, a second discussion was held between MURR and NRC staff to add an additional change to TS 6.2.b. TS 6.2.b has been revised again based on that discussion. This submittal supersedes the October 8, 2018 submittal in its entirety.

Enclosure 1 contains the proposed, revised TS page A-68 with track changes. Enclosure 2 contains the proposed, revised TS page A-68 with changes accepted and revision bars.

~ '

1513 Research Park Drive Columbia, MO 65211 Phone: 573-882-4211 Fax: 573-882-6360 Web: http://w~b.missouri.edu/~murrwww Fighting Cancer with Tomorrow's Technology

If there are any questions regarding the responses, please contact me at (573) 882-5118 or MeffertB@missouri.edu. I declare under penalty of perjury that the foregoing is true and correct.

ENDORSEMENT:

Sincerely, Reviewed and Approved

~a~

Bruce A. ~fert

\~Z:S J. David Robertson, PhD Reactor Manager Reactor Facility Director cc: Reactor Advisory Committee Reactor Safety Subcommittee Isotope Use Subcommittee Dr. Mark McIntosh, Vice Chancellor for Research, Graduate Studies and Economic Development Mr. Geoffrey Wertz, U.S. Nuclear Regulatory Commission Mr. William Schuster, U.S. Nuclear Regulatory Commission

Enclosures:

1. Proposed, revised Technical Specification page -A-68 (with track changes)
2. Proposed, revised Technical Specification pages - A-68 (with accepted changes and revision bars)

JACQUELINE L MATYAS My Commission Expires Mardi 26, 2019 Howard County Commlsslon#15634308 Page 2 of2

ENCLOSURE I UNIVERSITY OF MISSOURI RESEARCH REACTOR Date: TECHNICAL SPECIFICATIONS Amendment No.: Docket No. 50-186, License No. R-103 6.2 Review and Audit - Continued

b. The RAC may appoint subcommittees consisting of knowledgeable members of the public, students, faculty, and staff of MU when it deems it necessary in order to effectively discharge its primary responsibilities. When subcommittees are appointed, these subcommittees shall consist of no less than three (3) members with no more than one (1) student appointed to each subcommittee. The subcommittees may be authorized to act on behalf of the RAC.

The RAC and its subcommittees shall maintain minutes of meetings in which the items considered and the committees ' recommendations are recorded.

Dissemination of the minutes to the Office of the Chancellor, the RAC and its subcommittees shall be done within three-four (M ) months after the meetings.

Independent actions of the subcommittees shall be reviewed by the parent committee at the next regular meeting. A quorum of the committee or the subcommittees consisting of at least fifty percent of the appointed members shall be present at any meeting to conduct the business of the committee or subcommittee. Additionally, reactor facility staff shall not constitute greater than fifty percent of the quorum for a meeting of the RAC. Reactor facility staff shall not constitute a majority of the RAC. The RAC shall meet at least quarterlyfour (4) times per calendar year - at intervals not to exceed four (4) months.

A meeting of a subcommittee shall not be deemed to satisfy the requirement of the parent committee to meet at least once during each calendar quarterquarterly.

c. Any additions, modifications or maintenance to the systems described in these Specifications shall be made and tested in accordance with the specifications to which the system was originally designed and fabricated or to specifications approved by the NRC.
d. Following a favorable review by the NRC, the RAC, or the Reactor Facility Management, as appropriate, and prior to conducting any experiment, the Reactor Manager shall sign an authorizing form which contains the basis for the favorable review.
e. Audits:

(1) Audits of the following functions shall be conducted by an individual or group without immediate responsibility in the area to be audited:

1. Facility Operations, for conformance to the Technical Specifications and license conditions, at least annually;
11. Operator Requalification Program , for compliance with the approved program, at least every two (2) years ;

A-68

ENCL0SURE2 UNIVERSITY OF MISSOURI RESEARCH REACTOR Date: TECHNICAL SPECIFICATIONS Amendment No.: Docket No. 50-186, License No. R-103 6.2 Review and Audit - Continued

b. The RAC may appoint subcommittees consisting of knowledgeable mem,bers of the public, students, faculty, and staff of MU when it deems it necessary in order to effectively discharge its primary responsibilities. When subcommittees are appointed, these subcommittees shall consist of no less than three (3) members with no more than one (1) student appointed to each subcommittee. The subcommittees may be authorized to act on behalf of the RAC.

The RAC and its subcommittees shall maintain minutes of meetings in which the items considered and the committees' recommendations are recorded.

Dissemination of the minutes to the Office of the Chancellor, the RAC and its subcommittees shall be done within four (4) months after the meetings.

Independent actions of the subcommittees shall be reviewed by the parent committee at the next regular meeting. A quorum of the committee or the subcommittees consisting of at least fifty percent of the appointed members shall be present at any meeting to conduct the business of the committee or subcommittee. Additionally, reactor facility staff shall not constitute greater than fifty percent of the quorum for a meeting of the RAC. Reactor facility staff shall not constitute a majority of the RAC. The RAC shall meet at least four (4) times per calendar year- at intervals not to exceed four (4) months.

A meeting of a subcommittee shall not be deemed to satisfy the requirement of the parent committee to meet quarterly.

c. Any additions, modifications or maintenance to the systems described in these Specifications shall be made and tested in accordance with the specifications to which the system was originally designed and fabricated or to specifications approved by the NRC.
d. Following a favorable review by the NRC, the RAC, or the Reactor Facility Management, as appropriate, and prior to conducting any experiment, the Reactor Manager shall sign an authorizing form which contains the basis for the favorable review.
e. Audits:

(1) Audits of the following functions shall be conducted by an individual or group without immediate responsibility in the area to be audited:

i. Facility Operations, for conformance to the Technical Specifications and license conditions, at least annually; ii. Operator Requalification Program, for compliance with the approved program, at least every two (2) years; A-68