Category:Letter
MONTHYEAR05000186/LER-2024-003, University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.212024-10-25025 October 2024 University of Missouri Research Reactor, Specification Deviation from Technical Specification 3.2.g.21 ML24281A1322024-10-0404 October 2024 University of Missouri - Notification of NIST Award 60NANB23D160 NEPA Catex ML24270A0992024-10-0101 October 2024 Examination Confirmation Letter No. 50-186/Ol-25-01, University of Missouri - Columbia ML24142A1432024-08-27027 August 2024 Examination Result Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24142A1422024-08-27027 August 2024 Examination Report Letter No. 50-186/OL-24-02, University of Missouri - Columbia ML24184A1132024-07-0202 July 2024 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.10.d IR 05000186/20242012024-05-29029 May 2024 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2024201 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d2024-05-23023 May 2024 Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d ML24081A1332024-04-0202 April 2024 University of Missouri-Columbia (MURR) – Change of Facility Project Manager ML24044A1162024-03-0101 March 2024 Examination Confirmation Letter No. 50-186/OL-24-02, University of Missouri-Columbia ML24064A1922024-03-0101 March 2024 Federal Funding for the Conversion of the University of Missouri-Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel ML24059A4412024-02-28028 February 2024 Univ. of Missouri - Columbia - Submittal of Annual Operating Report Technical Specification 6.6.e IR 05000186/20232022023-12-12012 December 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023202 ML23198A0222023-08-29029 August 2023 Examination Report Letter No. 50-186/OL-23-02, University of Missouri - Columbia ML23198A0232023-08-29029 August 2023 Examination Result Letter No. 50-186/OL-23-02, University of Missouri-Columbia ML23221A1172023-08-0303 August 2023 Written Communication as Specified by 10 CFR 50.4(b)(4) Regarding the Submittal of the Physical Security Plan for the University of Missouri Research Reactor as a Part of the Process to Renew Amended Facility Operating License R-103 ML23213A0592023-08-0101 August 2023 Written Communication as Specified by University of Missouri Research Reactor Technical Specification 6.6.2(d) Regarding a Permanent Change in the Facility Organization Involving the Executive Director ML23186A2132023-07-31031 July 2023 Examination Confirmation Letter No. 50-186/OL-23-03, University of Missouri - Columbia IR 05000186/20232012023-07-31031 July 2023 The Curators of the University of Missouri – U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000186/2023201 05000186/LER-2023-003, University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b2023-06-0606 June 2023 University of Missouri - Columbia Research Reactor, Written Communication as Required Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.b ML23124A0422023-05-0808 May 2023 Examination Confirmation Letter 50-186/OL-23-02, University of Missouri - Columbia ML23103A0742023-04-10010 April 2023 University of Missouri, Columbia Research Reactor, Shipment of Radioactive Material Shipment Identifier MURR 23-01 Highway Route Controlled Quantity ML23024A2772023-04-0707 April 2023 Cover Letter for the Security Inspection Report for the University of Missouri (Public) - October 2022 ML23087A1132023-03-29029 March 2023 Examination Report No. 50-186/OL-23-01, University of Missouri-Columbia ML23089A3162023-03-29029 March 2023 Letter Notifying Univ. of Missouri That Us Dept. of Energy Funding Will Not Be Available in Fiscal Year 2023 to Complete the Conversion of MURR to LEU Fuel ML23087A1142023-03-29029 March 2023 Examination Results Letter No. 50-186/OL-23-01, University of Missouri - Columbia ML23055B1372023-02-24024 February 2023 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e IR 05000186/20222022023-02-23023 February 2023 The Curators of the University of Missouri - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2022202 - Cover Letter and Enclosure ML23031A0132023-02-14014 February 2023 Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia ML23017A2072023-01-13013 January 2023 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 6.1.f ML22349A0422022-12-0808 December 2022 Written Communication as Specified in 10 CFR 50.54(b)(5) Regarding Changes to the University of Missouri-Columbia Research Reactor Facility Emergency Plan Without Prior Commission Approval Pursuant to 10 CFR 50.54(q)(3) ML22314A2102022-11-0909 November 2022 Written Communication as Required by Technical Specification 6.6.d(2), Other Reports, Regarding a Change in University of Missouri-Columbia Research Reactor Organization Involving the Reactor Facility Director ML22304A0042022-10-27027 October 2022 University of Missouri - Columbia, Shipment of Radioactive Material, Highway Route Controlled Quantity ML22291A0322022-10-14014 October 2022 University of Missouri Written Communication as Required by 10 CFR 73, Appendix G Regarding a Deviation from the MURR Physical Security Plan ML22290A0042022-10-12012 October 2022 University of Missouri-Columbia Research Reactor, Reportable Event Report Pursuant to 20.2201(a)(ii) Regarding Loss of Licensed Material During Shipment IR 05000186/20222012022-06-14014 June 2022 The Curators of the University of Missouri - U.S. NRC Routine Inspection Report No. 05000186/2022201 ML22158A0792022-06-0606 June 2022 Submittal of Revised Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22097A0592022-04-0707 April 2022 Approval for Spent Nuclear Fuel Highway Route Application - NRC Route No. 182D - Docket Number 050-0186 ML22088A0782022-03-25025 March 2022 Univ. of Missouri, Federal Funding for the Conversion of the Columbia Research Reactor from Highly-Enriched Uranium Fuel to Low-Enriched Uranium Fuel IR 05000186/20212032022-03-0202 March 2022 The Curators of the University of Missouri U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000186/2021203 ML22056A5162022-02-25025 February 2022 Submittal of Annual Operating Report for the University of Missouri-Columbia Research Reactor as Required by MURR Technical Specification 6.6.e ML22038A6012022-02-0808 February 2022 Acceptance for Spent Nuclear Fuel Highway Route Application NRC No. 182D-Docket No. 050-0186 ML22013B1412022-01-21021 January 2022 Examination Confirmation Letter No. 50-186-OL-22-02, University of Missouri-Columbia 05000186/LER-2021-004, University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.102021-11-23023 November 2021 University of Missouri Research Reactor, Deviation from Technical Specification 3.2.g.10 ML21327A3042021-11-23023 November 2021 Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.f.6 ML21298A1972021-10-25025 October 2021 University of Missouri-Columbia Research Reactor - Written Communication as Required by University of Missouri Research Reactor Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specification 3.2.g.6 ML21253A2482021-09-23023 September 2021 Examination Confirmation Letter No. 50-186/OL-22-01, University of Missouri Columbia ML21221A3252021-08-0909 August 2021 University of Missouri-Columbia Research Reactor, Written Communication as Required by Technical Specification 6.6.c(3) Regarding a Deviation from Technical Specifications 3.2.a ML21217A2982021-08-0505 August 2021 University of Missouri-Columbia Research Reactor - Reportable Event Report Pursuant to 20.2203(a)(2)(iv) ML21215A4982021-07-0707 July 2021 Univ of Missouri, Submittal of Revised Road Transportation Security Plan for the Shipment of Irradiated Reactor Fuel 2024-08-27
[Table view] Category:Technical Specification
MONTHYEARML21075A2922021-03-16016 March 2021 Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CFR 50.90 ML20153A4602020-06-0101 June 2020 Univ. of Missouri - Written Communication as Specified by 10 CFR 50.4(b)(l) Regarding Revisions to the Bases for Technical Specifications 3.4.a, 3.4.b, and 4.4.a ML19263A6632019-09-18018 September 2019 Univ. of Missouri - Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 1 ML18319A0962018-11-13013 November 2018 University of Missouri-Columbia Research Reactor, Supplemental Information to Support a Revision to the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CPR 50.90 ML18109A0392018-04-17017 April 2018 Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CFR 50.90 ML15203A8672015-07-20020 July 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Requesting U.S. Nuclear Regulatory Commission Approval to Amend the Technical Specifications Appended to Amended Facility License No. R-103 Pursuant to 10 CFR 50.59(c) and 10 CFR 50.90 ML15203A8512015-07-20020 July 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Requesting U.S. Nuclear Regulatory Commission Approval to Amend the Technical Specifications Appended to Amended Facility License No. R-103 Pursuant to 10 CFR 50.59(c) and 10 CFR 50.90 ML15203A8552015-07-20020 July 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Requesting U.S. Nuclear Regulatory Commission Approval to Amend the Technical Specifications Appended to Amended Facility License No. R-103 Pursuant to 10 CFR 50.59(c) and 10 CFR 50.90 ML14030A1322014-01-27027 January 2014 Letter from the University of Missouri-Columbia Research Reactor Regarding Amended Facility License R-103 ML11356A0852011-12-19019 December 2011 Written Communication Regarding University of Missouri - Columbia - Request for Additional Information, License Amendment, Center Test Hole ML0716301312007-06-0808 June 2007 University of Missouri - Columbia Research Reactor, Request to Amend the Technical Specifications Appended to License R-103 ML0716301252007-06-0808 June 2007 University of Missouri - Columbia Research Reactor, Request to Amend the Technical Specifications Appended to License R-103 2021-03-16
[Table view] Category:Amendment
MONTHYEARML21075A2922021-03-16016 March 2021 Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CFR 50.90 ML19263A6632019-09-18018 September 2019 Univ. of Missouri - Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 1 ML18319A0962018-11-13013 November 2018 University of Missouri-Columbia Research Reactor, Supplemental Information to Support a Revision to the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CPR 50.90 ML18109A0392018-04-17017 April 2018 Written Communication as Specified by 10 CFR 50.4(b)(l) Requesting U.S. Nuclear Regulatory Commission Approval to Revise the Technical Specifications Appended to Renewed Facility Operating License No. R-103 Pursuant to 10 CFR 50.90 ML15203A8672015-07-20020 July 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Requesting U.S. Nuclear Regulatory Commission Approval to Amend the Technical Specifications Appended to Amended Facility License No. R-103 Pursuant to 10 CFR 50.59(c) and 10 CFR 50.90 ML15203A8512015-07-20020 July 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Requesting U.S. Nuclear Regulatory Commission Approval to Amend the Technical Specifications Appended to Amended Facility License No. R-103 Pursuant to 10 CFR 50.59(c) and 10 CFR 50.90 ML15203A8552015-07-20020 July 2015 Written Communication as Specified by 10 CFR 50.4(b)(1) Requesting U.S. Nuclear Regulatory Commission Approval to Amend the Technical Specifications Appended to Amended Facility License No. R-103 Pursuant to 10 CFR 50.59(c) and 10 CFR 50.90 ML14030A1322014-01-27027 January 2014 Letter from the University of Missouri-Columbia Research Reactor Regarding Amended Facility License R-103 ML11356A0852011-12-19019 December 2011 Written Communication Regarding University of Missouri - Columbia - Request for Additional Information, License Amendment, Center Test Hole ML0716301312007-06-0808 June 2007 University of Missouri - Columbia Research Reactor, Request to Amend the Technical Specifications Appended to License R-103 ML0716301252007-06-0808 June 2007 University of Missouri - Columbia Research Reactor, Request to Amend the Technical Specifications Appended to License R-103 2021-03-16
[Table view] |
Text
UNIVERSITY of MISSOURI RESEARCH REACTOR CENTER November 13, 2018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
REFERENCE:
Docket No. 50-186 University of Missouri-Columbia Research Reactor Renewed Facility Operating License No. R-103
SUBJECT:
Supplemental Information to support a revision to the Technical Specifications appended to Renewed Facility Operating License No. R-103 pursuant to 10 CPR§ 50.90 By letter dated April 17, 2018, the University of Missouri-Columbia Research Reactor (MURR) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to revise Technical Specification (TS) 3.7, "Radiation Monitoring Systems and Airborne Effluents," and TS 6.2, "Review and Audit."
On October 4, 2018, during a call between MURR and NRC staff, a discussion was held about improving the clarity and removing any potential ambiguity to TS 6.2.b. TS 6.2.b was revised based on that discussion. By letter dated October 8, 2018, MURR submitted this change to the NRC.
On November 1, 2018, a second discussion was held between MURR and NRC staff to add an additional change to TS 6.2.b. TS 6.2.b has been revised again based on that discussion. This submittal supersedes the October 8, 2018 submittal in its entirety.
Enclosure 1 contains the proposed, revised TS page A-68 with track changes. Enclosure 2 contains the proposed, revised TS page A-68 with changes accepted and revision bars.
~ '
1513 Research Park Drive Columbia, MO 65211 Phone: 573-882-4211 Fax: 573-882-6360 Web: http://w~b.missouri.edu/~murrwww Fighting Cancer with Tomorrow's Technology
If there are any questions regarding the responses, please contact me at (573) 882-5118 or MeffertB@missouri.edu. I declare under penalty of perjury that the foregoing is true and correct.
ENDORSEMENT:
Sincerely, Reviewed and Approved
~a~
Bruce A. ~fert
\~Z:S J. David Robertson, PhD Reactor Manager Reactor Facility Director cc: Reactor Advisory Committee Reactor Safety Subcommittee Isotope Use Subcommittee Dr. Mark McIntosh, Vice Chancellor for Research, Graduate Studies and Economic Development Mr. Geoffrey Wertz, U.S. Nuclear Regulatory Commission Mr. William Schuster, U.S. Nuclear Regulatory Commission
Enclosures:
- 1. Proposed, revised Technical Specification page -A-68 (with track changes)
- 2. Proposed, revised Technical Specification pages - A-68 (with accepted changes and revision bars)
JACQUELINE L MATYAS My Commission Expires Mardi 26, 2019 Howard County Commlsslon#15634308 Page 2 of2
ENCLOSURE I UNIVERSITY OF MISSOURI RESEARCH REACTOR Date: TECHNICAL SPECIFICATIONS Amendment No.: Docket No. 50-186, License No. R-103 6.2 Review and Audit - Continued
- b. The RAC may appoint subcommittees consisting of knowledgeable members of the public, students, faculty, and staff of MU when it deems it necessary in order to effectively discharge its primary responsibilities. When subcommittees are appointed, these subcommittees shall consist of no less than three (3) members with no more than one (1) student appointed to each subcommittee. The subcommittees may be authorized to act on behalf of the RAC.
The RAC and its subcommittees shall maintain minutes of meetings in which the items considered and the committees ' recommendations are recorded.
Dissemination of the minutes to the Office of the Chancellor, the RAC and its subcommittees shall be done within three-four (M ) months after the meetings.
Independent actions of the subcommittees shall be reviewed by the parent committee at the next regular meeting. A quorum of the committee or the subcommittees consisting of at least fifty percent of the appointed members shall be present at any meeting to conduct the business of the committee or subcommittee. Additionally, reactor facility staff shall not constitute greater than fifty percent of the quorum for a meeting of the RAC. Reactor facility staff shall not constitute a majority of the RAC. The RAC shall meet at least quarterlyfour (4) times per calendar year - at intervals not to exceed four (4) months.
A meeting of a subcommittee shall not be deemed to satisfy the requirement of the parent committee to meet at least once during each calendar quarterquarterly.
- c. Any additions, modifications or maintenance to the systems described in these Specifications shall be made and tested in accordance with the specifications to which the system was originally designed and fabricated or to specifications approved by the NRC.
- d. Following a favorable review by the NRC, the RAC, or the Reactor Facility Management, as appropriate, and prior to conducting any experiment, the Reactor Manager shall sign an authorizing form which contains the basis for the favorable review.
- e. Audits:
(1) Audits of the following functions shall be conducted by an individual or group without immediate responsibility in the area to be audited:
- 1. Facility Operations, for conformance to the Technical Specifications and license conditions, at least annually;
- 11. Operator Requalification Program , for compliance with the approved program, at least every two (2) years ;
A-68
ENCL0SURE2 UNIVERSITY OF MISSOURI RESEARCH REACTOR Date: TECHNICAL SPECIFICATIONS Amendment No.: Docket No. 50-186, License No. R-103 6.2 Review and Audit - Continued
- b. The RAC may appoint subcommittees consisting of knowledgeable mem,bers of the public, students, faculty, and staff of MU when it deems it necessary in order to effectively discharge its primary responsibilities. When subcommittees are appointed, these subcommittees shall consist of no less than three (3) members with no more than one (1) student appointed to each subcommittee. The subcommittees may be authorized to act on behalf of the RAC.
The RAC and its subcommittees shall maintain minutes of meetings in which the items considered and the committees' recommendations are recorded.
Dissemination of the minutes to the Office of the Chancellor, the RAC and its subcommittees shall be done within four (4) months after the meetings.
Independent actions of the subcommittees shall be reviewed by the parent committee at the next regular meeting. A quorum of the committee or the subcommittees consisting of at least fifty percent of the appointed members shall be present at any meeting to conduct the business of the committee or subcommittee. Additionally, reactor facility staff shall not constitute greater than fifty percent of the quorum for a meeting of the RAC. Reactor facility staff shall not constitute a majority of the RAC. The RAC shall meet at least four (4) times per calendar year- at intervals not to exceed four (4) months.
A meeting of a subcommittee shall not be deemed to satisfy the requirement of the parent committee to meet quarterly.
- c. Any additions, modifications or maintenance to the systems described in these Specifications shall be made and tested in accordance with the specifications to which the system was originally designed and fabricated or to specifications approved by the NRC.
- d. Following a favorable review by the NRC, the RAC, or the Reactor Facility Management, as appropriate, and prior to conducting any experiment, the Reactor Manager shall sign an authorizing form which contains the basis for the favorable review.
- e. Audits:
(1) Audits of the following functions shall be conducted by an individual or group without immediate responsibility in the area to be audited:
- i. Facility Operations, for conformance to the Technical Specifications and license conditions, at least annually; ii. Operator Requalification Program, for compliance with the approved program, at least every two (2) years; A-68