Letter Sequence Other |
|---|
EPID:L-2017-LLA-0030, Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (Approved, Closed) |
Results
Other: ML19158A272, ML19158A273, ML19158A274, ML19158A275, ML19158A276, ML19162A104, ML19162A114, ML19186A211, ML19186A212, ML19193A017, ML20155K741, ML20155K742, ML20155K743, ML20155K744
|
MONTHYEARML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML18117A4722018-04-27027 April 2018 International - HI-STORM FW Amendment 4 Response to Request for Additional Information Project stage: Response to RAI ML18115A3792018-05-21021 May 2018 Bf, Units 1, 2, and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2 Request for Additional Information Related to License Amendment Request to Incorporate New Technical Specification for Unbalanced Voltage Relays Project stage: RAI ML18208A6372018-07-27027 July 2018 Supplement to HI-STORM FW Amendment 4 RAIs Responses Project stage: Request ML19011A1272019-01-29029 January 2019 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Second Request for Additional Information (W/Enclosure) Project stage: RAI ML19093A0472019-03-18018 March 2019, 4 April 2019 Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 Project stage: Request ML19093A0482019-04-0404 April 2019 Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate of Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (W/Enclosure 1) Project stage: RAI ML19109A1812019-04-12012 April 2019 International - HI-STORM FW Amendment 4 Response to Second Request for Additional Information Project stage: Request ML19162A1142019-06-11011 June 2019 Affidavit Pursuant to 10 CFR 2.390 Project stage: Other ML19162A1042019-06-11011 June 2019 HI-STORM FW FSAR (Report HI-2114830 Proposed Rev. 5.G), Changed Pages (non-proprietary) Project stage: Other ML19162A1032019-06-11011 June 2019 Submittal of Supplement to HI-STORM FW Amendment 4 Second Round RAI Response Project stage: Supplement ML19186A2102019-07-0505 July 2019 International HI-STORM FW Amendment 4 Second Supplement to 2nd Round RAIs Project stage: Supplement ML19186A2112019-07-0505 July 2019 International Certificate of Compliance No. 1032 Project stage: Other ML19186A2122019-07-0505 July 2019 International - Attachment 2, Table 3.2.2, Limiting Parameters Project stage: Other ML19193A0172019-07-11011 July 2019 Letter to R. Ngwayah Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Updated Review Schedule Project stage: Other ML19198A1402019-07-15015 July 2019 Letter to R. Ngwayah Approval of Holtec International Request for Withholding Information from Public Disclosure - Certificate of Compliance No. 1032, HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment Request No. 4 Project stage: Withholding Request Acceptance ML19158A2722019-12-20020 December 2019 Memorandum to J. Cai User Need for Rulemaking for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Other ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2712019-12-20020 December 2019 Package: User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Request ML19158A2762019-12-20020 December 2019 Enclosure 4: Preliminary CoC 1032 Amendment No. 4 SER (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a Project stage: Other ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Project stage: Other ML20155K7412020-06-15015 June 2020 Letter to Holtec Issuing Certificate of Compliance No. 1032 Amendment No. 4 for HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B Project stage: Other ML20155K7402020-06-15015 June 2020 Issuance of Certificate of Compliance No 1032 Amendment No. 4 for HI-STORM Flood/Wind Mulitpurpose Canister Storage System Project stage: Request ML20155K7452020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Final Safety Evaluation Report Project stage: Approval 2019-03-18
[Table View] |
Text
December 20, 2019 MEMORANDUM TO: June Cai, Chief Materials Rulemaking and Project Management Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards FROM: Daniel I. Doyle, Acting Chief /RA/
Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
SUBJECT:
USER NEED FOR RULEMAKING FOR THE HOLTEC HI-STORM FLOOD/WIND MULTIPURPOSE CANISTER STORAGE SYSTEM, AMENDMENT NO. 4 The purpose of this communication is to request support for rulemaking activities in the Division of Fuel Management (DFM) for the following Title 10 of the Code of Federal Regulations (10 CFR) Part 72 licensing action:
- 1. Changes to 10 CFR 72.214 rule text (changes appear in bold):
Certificate Number: 1032.
Initial Certificate Effective Date: June 13, 2011, superseded by Amendment Number 0, Revision 1, on April 25, 2016.
Amendment Number 4 Effective Date: [insert 75 days from date of Federal Register publication].
SARs Submitted by: Holtec International.
SAR
Title:
Final Safety Analysis Report for the HI-STORM FW System.
Docket Number: 72-1032.
Certificate Expiration Date: June 12, 2031.
Model Numbers: HI-STORM FW MPC-32ML, MPC-37, and MPC-89.
- 2. By letter dated March 11, 2016, and as supplemented on September 16, 2016, January 31, 2017, April 27, 2018, July 27, 2018, April 12, 2019, June 11, 2019, and July 5, 2019, Holtec International submitted an amendment request to the U.S. Nuclear Regulatory Commission for the HI-STORM Flood/Wind Multipurpose Canister Storage System Certificate of Compliance (CoC) No. 1032. The proposed changes include the following:
CONTACT: Yen-Ju Chen, NMSS/DFM (301) 415-1018
J. Cai 1) Add MPC-32ML for storage in HI-STORM FW system and allow fuel assembly class 16x16D as content for MPC-32ML.
- 2) Add fuel assembly class 16x16E as content for MPC-37.
- 3) Separate the design pressure for the short-term operation from the off normal condition to provide clarity in final safety analysis report (FSAR) Table 2.2.1.
- 4) Add a caution note in FSAR Section 9.2.1 that states fuel cladding is not exposed to air during loading operations.
- 5) Update the definition of undamaged fuel assembly in FSAR Glossary to be aligned with the definition in Appendix A and FSAR Table 2.1.3 (Note 14).
- 6) Replace Charpy test program with fracture toughness test program from the revised Metamic-HT Sourcebook (Holtec, 2017b) in FSAR Sections 1.2.1.4.1 and 3.4.
- 7) Add a caution note in FSAR Section 9.2.3 that states low-enriched fuel must be shown to be without known or suspected grossly breached rods.
- 3. The proposed CoC, CoC Appendix ATechnical Specifications, CoC Appendix B Approved Contents and Design Features, and preliminary safety evaluation report (SER) have been placed in ADAMS (see references below) and are available for your use in the rulemaking package. DFM will designate these documents as Official Agency Records after the Executive Director for Operations has approved the package (ADAMS Package No. ML19158A271).
The Office of the General Counsel has reviewed this memorandum with its referenced documents and has no legal objection to its contents.
DOCKET No.: 72-1032 CAC No.: 001028 EPID: L-2017-LLA-0030 ADAMS
References:
- 1. Proposed CoC 1032 Amendment No. 4 (ML19158A273)
- 2. Proposed CoC 1032 Amendment No. 4 Appendix A (ML19158A274)
- 3. Proposed CoC 1032 Amendment No. 4 Appendix B (ML19158A275)
- 4. Preliminary CoC 1032 Amendment No. 4 SER (ML19158A276)
Package: ML19158A271, Memo: ML19158A272
- concur by email OFFICE DFM DFM OGC DFM NAME YChen WWheatley* LClark* DDoyle DATE 12/19/2019 9/19/2019 12/18/2019 12/20/2019