ML19260A287
ML19260A287 | |
Person / Time | |
---|---|
Site: | 05000471 |
Issue date: | 10/23/1979 |
From: | Abbot W THOMSEN, F. T. |
To: | Callihan A, Cole R, Goodhope A Atomic Safety and Licensing Board Panel |
References | |
NUDOCS 7911080550 | |
Download: ML19260A287 (1) | |
Similar Documents at 05000471 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18011B1361994-12-13013 December 1994
[Table view]Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20059M8421990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20151V9791988-07-28028 July 1988 Partial Response to FOIA Request for Documents Re Plant.App a Documents Encl & Available in PDR ML20206F3261986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in Pdr.W/O App B & C Documents ML20206F3301986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in PDR ML20099J8141984-04-25025 April 1984 FOIA Request for Documents Re Electrical Relay Failures Including Class 1E Relay Failures at Listed Plants & Utilization of GE Type Hfa 51 Series Ac Relays or Other Relays Using Lexan as Coil Spool Matl ML20027A8911982-09-22022 September 1982 FOIA Request for NRC Preliminary & Final Calculations of Reactor Accident Consequence Results for Facilities ML20086Q7091982-07-28028 July 1982 Forwards Analyses of Antirotation Pin & Impeller Ring Wear, Per Request.Encl Info Should Be Treated as company- Sensitive ML20055A2601982-05-28028 May 1982 Responds to FOIA Request for Documents Re Requests by Licensees for Exemption or Extension Beyond 820201 Date Specified by Final Rule,Commission Analysis,Comments,Or Actions Re Emergency Planning.Forwards App a Documents ML20051P0041982-05-0707 May 1982 Advises of Util Position Declining to Pay Charges Asserted in NRC 820415 Ltr.Charges W/O Regulatory Basis.Other Reasons for Declining Asserted in Pending Case of New England Power Co Vs NRC ML20042B4561982-03-19019 March 1982 Ack Receipt of Response to 820203 Ltr.Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML20042B7141982-03-19019 March 1982 Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20009H6841981-08-0303 August 1981 Forwards Updated Population Data & Description of Road Network Improvements Projected During First Yr of Plant Operation,In Response to NRC 810724 Request Re Evacuation Time & Population Estimates ML20010C5851981-05-27027 May 1981 Advises That Because of M Cleeton Medical History,Any Extra Radiation Would Pose Risk.Certificate of Svc Encl ML20004B6901981-05-19019 May 1981 Forwards AR & MW Cleeton Exceptions to ASLB Partial Initial Decision ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML20008F9011981-05-0606 May 1981 Clarifies Response to 10CFR50.34(e) Provided in PSAR Amend 43 Per 810506 Request.Test Date & Analysis Will Include Igniter Performance & Endurance Characteristics If Option Chosen Continues to Be Deliberate Ignition Sys ML19347E5171981-05-0505 May 1981 Clarifies Statement in 810429 PSAR Amend 43 Re Containment Sys Design Integrity,In Response to NRC 810505 Telcon Request ML20004F3831981-04-30030 April 1981 Forwards Util Latest Annual Rept,Portions of Which May Be Pertinent to Issues in Proceeding.Certificate of Svc Encl. W/O Rept.Related Correspondence ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19350C7931981-03-19019 March 1981 Informs That Commonwealth of Ma Reviewed Parties' Responses to ASLB 810219 Order.Aslb Should Schedule Hearings on Emergency Planning & Other TMI-related Issues for Sept 1981 ML19343D5261981-03-0404 March 1981 Advises of Review of Evacuation Roadway Network Re Facility. Traffic Control Beyond Emergency Planning Zone Will Avoid Congestion within Zone.Effective Traffic Mgt Plan Is Needed ML19350B5321981-02-27027 February 1981 Informs That Commonwealth of Ma Needs Time to Evaluate Suppl to SER Re Emergency Planning,To Prepare New Interrogatories, to Evaluate Answers to Interrogatories & to Prepare Written Testimony.W/Notice of Appearance & Certificate of Svc ML19341D4641981-02-25025 February 1981 Forwards Intervenors Cleeton Exceptions to ASLB 810202 Partial Initial Decision ML19341C4871981-02-24024 February 1981 Forwards Endorsement 43 to Maelu Policy MF-58 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML20003C1181981-02-18018 February 1981 Forwards Commonwealth of Ma 810218 Exceptions to ASLB 810202 Partial Initial Decision ML20003B4821981-02-0909 February 1981 Forwards Endorsements 56,57 & 4 to ANI Policies NF-188, NF-188 & Binder EB-31,respectively & Endorsement 4 to Maelu Binder XB-31 ML19341B2671981-01-23023 January 1981 Informs of No Plans for Filing Application & Review Requests,Per NRC 801205 Request.Cp Receipt or Const Completion Dates Undetermined Until NRC Issuance of Policy for Resumption of CP Licensing ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19347B3151980-10-10010 October 1980 Forwards Amend 40 to Psar.Amend Incorporates Revised Section 13.3,emergency Planning,In Response to Final Emergency Planning Rule ML20062J3251980-09-30030 September 1980 Discusses Emergency Planning Regulations,In Response to Re L Boyd Concerns.Fema Is Responsible for Adequacy of Emergency Preparedness in States & Communities Around Nuclear Plants ML19331E2871980-07-14014 July 1980 Forwards Recommendation for Item 3.1.6/3.2.4 Re Cable Combustibility for Fire Protection Review.Recommends That Licensee Be Required to Coat Okonite & Kerite Cables ML19330C2071980-07-14014 July 1980 Responds to IE Bulletin 80-11, Masonry Wall Design. Inaccessible Block Walls Surveyed & Program to re-evaluate Walls Near safety-related Sys Developed.Justification for re-evaluation Criteria to Be Submitted by 801108 ML19323H6951980-06-0909 June 1980 Request Mod of First Page of Distribution List.Distribution List Encl ML19323G8941980-05-0202 May 1980 Responds to ASLB 800327 Order Requesting Date of Planned Testimony Re Emergency Planning Issue.Written Testimony Will Be Filed within 4-6 Wks from Receipt of NRC Evaluation. Related Correspondence ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML19323A8721980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML19323A8681980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML20062J3301980-04-18018 April 1980 Requests Response to Encl L Boyd Inquiry About Emergency Preparedness Around Facility ML19323G2211980-04-0808 April 1980 Expresses Concern Re on-job Intoxication of Facility Employees.Boston Herald American 800403 Article Encl ML19305C3711980-03-17017 March 1980 Responds to NRC Request Re Necessity of Antitrust Hearing Following Ma Municipals' Withdrawal of Petition to Intervene.Antitrust Hearing Unnecessary Re Instant Application ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19296D2931980-02-25025 February 1980 Forwards Endorsement 38 to Maelu Policy MF-58 ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19260D6061980-02-0505 February 1980 Forwards Endorsements 50 & 51 to Nelia Policy NF-188 1994-12-13 Category:INCOMING CORRESPONDENCE MONTHYEARML18011B1361994-12-13013 December 1994
[Table view]Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld ML20099J8141984-04-25025 April 1984 FOIA Request for Documents Re Electrical Relay Failures Including Class 1E Relay Failures at Listed Plants & Utilization of GE Type Hfa 51 Series Ac Relays or Other Relays Using Lexan as Coil Spool Matl ML20027A8911982-09-22022 September 1982 FOIA Request for NRC Preliminary & Final Calculations of Reactor Accident Consequence Results for Facilities ML20086Q7091982-07-28028 July 1982 Forwards Analyses of Antirotation Pin & Impeller Ring Wear, Per Request.Encl Info Should Be Treated as company- Sensitive ML20051P0041982-05-0707 May 1982 Advises of Util Position Declining to Pay Charges Asserted in NRC 820415 Ltr.Charges W/O Regulatory Basis.Other Reasons for Declining Asserted in Pending Case of New England Power Co Vs NRC ML20042B7141982-03-19019 March 1982 Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B4561982-03-19019 March 1982 Ack Receipt of Response to 820203 Ltr.Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20009H6841981-08-0303 August 1981 Forwards Updated Population Data & Description of Road Network Improvements Projected During First Yr of Plant Operation,In Response to NRC 810724 Request Re Evacuation Time & Population Estimates ML20010C5851981-05-27027 May 1981 Advises That Because of M Cleeton Medical History,Any Extra Radiation Would Pose Risk.Certificate of Svc Encl ML20004B6901981-05-19019 May 1981 Forwards AR & MW Cleeton Exceptions to ASLB Partial Initial Decision ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML20008F9011981-05-0606 May 1981 Clarifies Response to 10CFR50.34(e) Provided in PSAR Amend 43 Per 810506 Request.Test Date & Analysis Will Include Igniter Performance & Endurance Characteristics If Option Chosen Continues to Be Deliberate Ignition Sys ML19347E5171981-05-0505 May 1981 Clarifies Statement in 810429 PSAR Amend 43 Re Containment Sys Design Integrity,In Response to NRC 810505 Telcon Request ML20004F3831981-04-30030 April 1981 Forwards Util Latest Annual Rept,Portions of Which May Be Pertinent to Issues in Proceeding.Certificate of Svc Encl. W/O Rept.Related Correspondence ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19350C7931981-03-19019 March 1981 Informs That Commonwealth of Ma Reviewed Parties' Responses to ASLB 810219 Order.Aslb Should Schedule Hearings on Emergency Planning & Other TMI-related Issues for Sept 1981 ML19343D5261981-03-0404 March 1981 Advises of Review of Evacuation Roadway Network Re Facility. Traffic Control Beyond Emergency Planning Zone Will Avoid Congestion within Zone.Effective Traffic Mgt Plan Is Needed ML19350B5321981-02-27027 February 1981 Informs That Commonwealth of Ma Needs Time to Evaluate Suppl to SER Re Emergency Planning,To Prepare New Interrogatories, to Evaluate Answers to Interrogatories & to Prepare Written Testimony.W/Notice of Appearance & Certificate of Svc ML19341D4641981-02-25025 February 1981 Forwards Intervenors Cleeton Exceptions to ASLB 810202 Partial Initial Decision ML19341C4871981-02-24024 February 1981 Forwards Endorsement 43 to Maelu Policy MF-58 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML20003C1181981-02-18018 February 1981 Forwards Commonwealth of Ma 810218 Exceptions to ASLB 810202 Partial Initial Decision ML20003B4821981-02-0909 February 1981 Forwards Endorsements 56,57 & 4 to ANI Policies NF-188, NF-188 & Binder EB-31,respectively & Endorsement 4 to Maelu Binder XB-31 ML19341B2671981-01-23023 January 1981 Informs of No Plans for Filing Application & Review Requests,Per NRC 801205 Request.Cp Receipt or Const Completion Dates Undetermined Until NRC Issuance of Policy for Resumption of CP Licensing ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19347B3151980-10-10010 October 1980 Forwards Amend 40 to Psar.Amend Incorporates Revised Section 13.3,emergency Planning,In Response to Final Emergency Planning Rule ML19330C2071980-07-14014 July 1980 Responds to IE Bulletin 80-11, Masonry Wall Design. Inaccessible Block Walls Surveyed & Program to re-evaluate Walls Near safety-related Sys Developed.Justification for re-evaluation Criteria to Be Submitted by 801108 ML19331E2871980-07-14014 July 1980 Forwards Recommendation for Item 3.1.6/3.2.4 Re Cable Combustibility for Fire Protection Review.Recommends That Licensee Be Required to Coat Okonite & Kerite Cables ML19323H6951980-06-0909 June 1980 Request Mod of First Page of Distribution List.Distribution List Encl ML19323G8941980-05-0202 May 1980 Responds to ASLB 800327 Order Requesting Date of Planned Testimony Re Emergency Planning Issue.Written Testimony Will Be Filed within 4-6 Wks from Receipt of NRC Evaluation. Related Correspondence ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML20062J3301980-04-18018 April 1980 Requests Response to Encl L Boyd Inquiry About Emergency Preparedness Around Facility ML19323G2211980-04-0808 April 1980 Expresses Concern Re on-job Intoxication of Facility Employees.Boston Herald American 800403 Article Encl ML19305C3711980-03-17017 March 1980 Responds to NRC Request Re Necessity of Antitrust Hearing Following Ma Municipals' Withdrawal of Petition to Intervene.Antitrust Hearing Unnecessary Re Instant Application ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19296D2931980-02-25025 February 1980 Forwards Endorsement 38 to Maelu Policy MF-58 ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19260D6061980-02-0505 February 1980 Forwards Endorsements 50 & 51 to Nelia Policy NF-188 ML19257A7031980-01-0202 January 1980 Forwards 780209 Ltr to NRC Re J & s Pires & R & D Fitts Notice of Claims Against Util.Both Claimants Have Filed Suit ML19270H8001979-12-27027 December 1979 Forwards Design Review & Supplemental Recommendations Re Exposed Steel protection,self-contained Breathing Apparatus, Generation Seals,Fire Detector Testing,Cable Combustibility & Dc Power Sys Hazard Analysis ML19256F4471979-11-20020 November 1979 Notifies That 791119 Meeting W/Ma Wildlife Federation & NRC Will Be Rescheduled Either 791123 or Filing Date for Ma Wildlife Federation Pleadings Moved to 791130 ML19256F2971979-11-12012 November 1979 Informs of Minor Change in Schedule for Requests for Findings of Fact & Conclusions of Law.Possibility Exists of Stipulation Between Nrc,Intervenor Ma Wildlife Federation & Applicant ML19262A8891979-11-0808 November 1979 Discusses Applicant 791101 Transmittal of Four Documents on Revolving Credit Agreement.If Introduced as Evidence,State of Ma Reserves Right to cross-examine Rebuttal Testimony ML19260B1201979-11-0505 November 1979 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision ML19260B1261979-11-0505 November 1979 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision.Certificate of Svc Encl ML19210D7701979-11-0101 November 1979 Forwards Util & Bank Consortium 790731 Credit & Loan agreement,791012 Amend 1,State of Ma Dept of Public Util Orders Re Agreement & Util Affidavit ML19260C2131979-10-29029 October 1979 Responds to 790913 Request for Addl Info Needed to Complete Review of Util Response to IE Bulletin 78-10 Re Bergen- Patterson Hydraulic Shack Suppressor Accumulator Spring coils.Safety-related Hydraulic Snubbers Inspected in 1979 1994-12-13 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML20042B7141982-03-19019 March 1982
[Table view]Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19257A7031980-01-0202 January 1980 Forwards 780209 Ltr to NRC Re J & s Pires & R & D Fitts Notice of Claims Against Util.Both Claimants Have Filed Suit ML19256F2971979-11-12012 November 1979 Informs of Minor Change in Schedule for Requests for Findings of Fact & Conclusions of Law.Possibility Exists of Stipulation Between Nrc,Intervenor Ma Wildlife Federation & Applicant ML19210D7701979-11-0101 November 1979 Forwards Util & Bank Consortium 790731 Credit & Loan agreement,791012 Amend 1,State of Ma Dept of Public Util Orders Re Agreement & Util Affidavit ML19260A2871979-10-23023 October 1979 Advises That Intervenors Cleeton Support & Join Commonwealth of Ma Memorandum Opposing Dismissal of Emergency Planning Contentions ML19208C5101979-07-30030 July 1979 Advises of Receipt of Commonwealth of Ma Motion to Defer Forthcoming Evidentiary Hearings on Emergency Planning & Class 9 Accidents ML19208D0131979-07-23023 July 1979 Forwards Applicant Answers to Commonwealth of Ma Interrogatories Re Need for Power Issue.W/O Encl ML19242D5391979-07-0303 July 1979 Clarifies Withdrawal of 790518 Ltr.Withdrawal Not Intended ML19242B3751979-06-26026 June 1979 Forwards Util Objections & Motions for Protective Orders Re Certain Commonwealth of Ma Interrogatories Concerning Need for Power Issue.Certificate of Svc Encl ML19282C7991979-04-26026 April 1979 Forwards Complaints Re New Class Action Against Boston Edison Co,Et Al,Commenced by Plymouth County Nuclear Info Committee,Inc,Et Al.Summons,Order & Class Action Complaint Encl ML19284A4721979-01-25025 January 1979 Provides Comments on NRC 790116 Statement of Outstanding Issues in Proceeding Re Alternative Sites,Financial Qualification,Need for Power & NRC Reactor Safety Study ML19259A7411978-12-29029 December 1978 Refutes Position in 781208 Ltr of RM Butler (Boston Edison Co) That Site Analysis Should Not Be Recirculated Pursuant to NEPA ML20062D2181978-11-0303 November 1978 Believes That Alternative Sites Issue Is at Heart of Nuc Lic Process & That NEPA Mandates the Recirculation of Fes Suppl in This Case ML20062D9061978-11-0303 November 1978 Comments on 781012 Meeting Re Recirculating Final Environ Statement Suppl Relating to Alternate Sites.Intervenors Disagree with Facil Decision Not to Recirculate Fes ML20062C1231978-10-20020 October 1978 Forwards Memorandum Re Points & Authorities Relied Upon in Support of Position That Recirculation of Suppl Staff Site Analysis Not Legally Required Under NEPA ML20062D9261978-10-20020 October 1978 Forwards Memo Setting Forth Points & Auth Used to Support Position That Recirculation of Suppl Staff Site Analysis Is Not Req Under NEPA or NRC NEPA Reg ML19257A7051978-02-0909 February 1978 Notifies of Receipt of R Fitts & J Pires Notices of Claim Against Util.Claimants Allege Anxiety,Apprehension & Loss of Wages Due to Exposure 1982-03-19 |
Text
S I M ON DS. WI N S LOW, WI LLis & AB B OTT a p se a r c a s s o m a t a s sociatio N ATTO R N EYS AT LAW 5 0 CO NG RES S STRE ET S O S T O N. M A S S A C H U S ETT S O250 9 WI LLI A M S ABSOTT Anta Coot 657 52F5E20 October 23, 1979 Andrew C. Goodhope, Esq Dr. A. Dixon Callihan 3320 Estelle Terrace Union Carbide Corporation Wheaton, Maryland 20906 P. O. Box Y Oak Ridge, Tennessee 37830 Dr. Richard F. Cole Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington D.C. 20555 RE: In the Matter of Boston Edison Company, et. al _l,.
(Pilgrim Nuclear Generating Station, UniF2)
Docket No. 50-471 Gentlemen:
For the record, the Cleetons fully support the Memorandu-of the Cor:monwealth of Mar 3achusetts in Opposition to Dismissal of its contention on Emergency Planning.
The Cleetens also have a contention on Emergency Planning and join in the same reasons put forth by the Commonwealth against dismissal of such contention.
Sincerely yours ,
William S. Abbott USA / sea Counsel to Alan R. Cleeton and Perion Cleeton cc: Barry H. Smith, Esc.
M/M Alan R. Cleetod # h Chief Librarian, Plymouth Public Library A George H. Lewald, Esq. k %5"'
4 Frank S. Wright, Esq. -
r-1297 360 5 ogh(3[$p r g
+ -
e os 7911080 E C