|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20211P1421986-12-16016 December 1986 Order Terminating CPPR-170 & CPPR-171 for Marble Hill Nuclear Generating Station ML20215E6651986-12-16016 December 1986 Notice of Withdrawal of Application for OLs for Marble Hill Nuclear Generating Station,Per Util 850404 Motion to Terminate Proceedings.Aslb Issued Memorandum & Order LBP-86-37 on 861103,terminating OL Proceeding ML20215N6211986-11-0303 November 1986 Memorandum & Order LBP-86-37,terminating OL Proceeding,In Response to Applicant 850404 Motion.Served on 861104 ML20214K7331986-08-19019 August 1986 Response to Applicant 860702 Suppl to Motion to Terminate Proceedings & NRC 860721 Response to Board 860530 Memorandum & Order.Applicant Cannot Invoke Jurisdiction of NRC & ASLB W/O Accepting Conditions.Certificate of Svc Encl ML20214K7711986-08-12012 August 1986 Responds to NRC Staff Position on 860530 Memorandum & Order Re Facility Site Restoration.Opposes Any Decision Not Providing for clean-up of Site ML20205C3001986-08-11011 August 1986 Request for Extension of Time Until 860815 to File Response to Util 860702 Suppl to Motion to Terminate Proceeding & NRC 860721 Response to 860530 Memorandum & Order.Certificate of Svc Encl ML20203E3681986-07-21021 July 1986 Response to Board 860530 Memorandum & Order Re Util 850404 Motion to Terminate Proceeding & Util 860702 Suppl to Motion.In Absence of Issuance of Notice of Hearing,Util Motion Should Be Granted ML20203E4101986-07-21021 July 1986 Supplemental Affidavit of RB Samworth Re Termination of Const in Manner Favoring Reduction or Avoidance of Significant Environ Impacts,Per Util Motion for Withdrawal of Application.Certificate of Svc Encl ML20199L0521986-07-0202 July 1986 Suppl to Motion Supporting Terminating Proceeding.Argues That Board Has No Jurisdiction Over Surrender of Cps. Surrender of Permits to Director of NRR Should Render OL Proceeding Moot ML20206D5771986-06-18018 June 1986 Memorandum & Order Amending ASLB 860530 Order to Allow State of in Sassafras Audubon Soc to File Answer to Applicant Suppl to Motion to Terminate within 10 Days After Svc of Suppl.Encl Served.Served on 860619 ML20198K7291986-05-30030 May 1986 Memorandum & Order Directing That Applicants Suppl 850404 Motion to Terminate OL Proceeding within 30 Days of Svc of Order.Nrc May Respond to Applicants Suppl within 15 Days Following Svc of Suppl.Served on 860602 ML20140G0741986-03-28028 March 1986 Supplemental Answer Supporting Applicant 850404 Motion to Terminate Proceeding.Rb Samworth Affidavit Encl ML20140G1051986-03-27027 March 1986 Affidavit of RB Samworth Determining No Significant Detrimental Impact on or Offsite Resulting from Termination of Proceeding.W/Certificate of Svc ML20100G2871985-04-0404 April 1985 Motion to Terminate OL Proceeding.Cps Surrendered to NRC by .Certificate of Svc Encl ML20082R6581983-12-0808 December 1983 Pp 11 of Response to Sassafras Audubon Soc & Valley Watch, Inc Contentions ML20082K2541983-11-30030 November 1983 Response to Save the Valley,Inc 831021 Provisional Contentions.Contention 2 Should Be Deferred & Contentions 1 & 3-15 Should Not Be Admitted.Certificate of Svc Encl ML20078R6531983-11-10010 November 1983 Motion for Extension Until 831130 to Respond to Indiana Sassafras Audubon Soc & Valley Watch,Inc Amended Petitions to Intervene & Save the Valley Contentions.Certificate of Svc Encl ML20081M5501983-11-10010 November 1983 Motion for Extension to 831130 to Respond to Amended Petitions to Intervene & to Complete Technical Analysis of Numerous Contentions.Motion Granted by ASLB on 831114 ML20081A5011983-10-21021 October 1983 Petition of Save the Valley for Leave to Intervene,Listing 15 Contentions Re Integrity of Concrete in safety-related Structures,Electrical Work,Evacuation Plans & Common Mode Failures.Certificate of Svc Encl ML20024E0511983-08-0808 August 1983 Answer Opposing Indiana Sassafras Audubon Soc 830722 Amended Petition to Intervene.Soc Failed to Particularize Group Interests or Member Interest & Failed to Satisfy Injury in Fact Requirement.Certificate of Svc Encl ML20077G0821983-07-26026 July 1983 Amend to Vally Watch,Inc Petition to Intervene & Request for Hearing Re Ol.Affidavits of Members to Establish Standing Encl ML20077C8481983-07-21021 July 1983 Amend to Petition to Intervene in OL Hearing.Petitioner Makes Requisite Showing That Members Have Standing & Have Authorized Petitioner to Represent Interests.Contentions to Be Litigated Identified.Certificate of Svc Encl ML20090F6761983-07-0101 July 1983 Notices of Appearance in Proceeding.Certificate of Svc Encl ML20074A4561983-05-12012 May 1983 Answer to Indiana Sassafras Audubon Society (Isas) Petition for Leave to Intervene.Isas Fails to Establish Right to Intervene.Certificate of Svc Encl ML20074A4811983-05-12012 May 1983 Response W/O Objection to Save the Valley Petition for Leave to Intervene,Provided Applicant May Object to Contentions & Right to Hearing After Petition Suppl Filed. Certificate of Svc Encl ML20074A6481983-05-12012 May 1983 Response Opposing Valley Watch,Inc 820427 Petition for Leave to Intervene in Proceeding.Petitioner Fails to Estabish Sufficient Interest in Proceeding to Establish Standing as Matter of Right or Discretion.W/Certificate of Svc ML20073P9811983-04-25025 April 1983 Petition of Save the Valley to Intervene in OL Proceeding, Listing Contentions ML20073P9871983-04-19019 April 1983 Petition of Valley Watch,Inc to Intervene in OL Proceeding, Listing Contentions ML20073P9911983-04-16016 April 1983 Petition of Sassafras Audubon Soc of South Central in to Intervene in OL Proceeding,Listing Contentions ML20039B7421981-12-11011 December 1981 Commentary on Rc Deyoung 811208 Supplemental Decision Under 10CFR2.206.Hearing Necessary Since IE Action Allowing Resumption of Concrete Placement Violated Commission Criteria for Plant Reopening.Certificate of Svc Encl ML20062M6301981-12-11011 December 1981 Commentary on Rc Deyoung 811130 Supplemental Decision. Decision Lacks Candor Re Prior Commentary of Ofc of Policy Evaluation.Nrc Established Procedure Extremely Biased. Certificate of Svc Encl ML20140B2651981-08-31031 August 1981 Aug 1981 Official Newsletter of Save the Valley ML20009B2801981-07-10010 July 1981 Addendum to 810414 Petition for Commission Review of NRC 810327 Order to Resume Const at Facility.Independent Engineers Must Defend Determination of 95% Reliability. Certificate of Svc Encl.Related Correspondence ML19343D3821981-04-14014 April 1981 Petition & Supporting Memorandum for Review of NRC 810327 Order to Resume Const.No Written Findings or Conclusions Addressing Adequacy of License Investigation & Repairs of Concrete Placement Have Been Provided ML19323E4901980-05-14014 May 1980 Addl Comments on Intervenor 800507 Pleading Re Resumption of Work.Urges Commission to Consider Encl Affidavits Re Whether IE Should Have Confidence in QC Program & Whether New Madrid Seismic Zone Extension Should Be Made ML19305E5701980-05-0707 May 1980 Comments Re Reopening of Facility,Addressing Licensee 800305 Request for Insp of Safety Matls & Licensee Independent Exam of Concrete.Urges Positive Action Re QC Violations & Improperly Placed Concrete ML19316B1531980-04-29029 April 1980 Response to Save the Valley-Save Marble Hill 800423 Motion to Strike & Objections to Util Bill of Costs Re Civil Action 78-1369 on Appeal.Urges Assigning Costs to State of Ky & Intervenor.W/Certificate of Svc.Related Correspondence ML19211A9511979-12-10010 December 1979 Appeals for Review of Director'S Decision Under 10CFR2.206. Director Abused Discretionary Power in Denying Requests to Reopen Safety Hearings at Meaningful Point in Licensing Process ML19254F8161979-10-20020 October 1979 Motion in Opposition to NRC Motion for Denial of Audubon Society Request for Hearing on NRC 790815 Order Confirming Suspension of safety-related Const.Economic Injury Is Sufficient Status for Hearing ML19323E5131979-09-30030 September 1979 Affidavit Re Us Testing,Facility sub-contractors ML19208D5071979-09-24024 September 1979 Petition Calling for Revocation of Facility CP ML20136B4331979-09-0101 September 1979 Request to Suspend & Revoke CP & to Reopen Safety Hearings. Newspaper Articles Encl ML19207B4561979-08-29029 August 1979 Petition Objecting to Problems at Plant.Problems Include Poor Const & Qa,Nuclear Waste Storage & Lack of Demonstrated Need for Plant.Requests That CP Be Revoked,Safety Hearings Be Reopened & Congressional Hearings Be Initiated ML19259C8621979-08-12012 August 1979 Requests Revocation of Cp,Reopening of NRC Safety Hearings & Start of Planned Congressional Hearings ML19323E5171979-07-22022 July 1979 Affidavit Re Quality of Concrete Pours ML19323E5021979-07-0808 July 1979 Affidavit Re Glaring Concrete Workmanship Defects in & Around Containment & Alleged Improper Attitudes of Newberg- Marble Hill Const Co ML19323E4981979-07-0808 July 1979 Affidavit Re Glaring Concrete Workmanship Defects in & Around Containment & Alleged Improper Attitudes of Newberg-Marble Hill Const Co ML19323E4931979-07-0707 July 1979 Affidavit Re Glaring Concrete Workmanship Defects in & Around Containment & Alleged Improper Attitudes of Newberg- Marble Hill Const Co ML19323E5061979-05-0808 May 1979 Deposition Re Water Leaking,Patches & Honeycombs.Pp 2-22 ML19345B2591979-05-0808 May 1979 Statement of 790508 Appearance in Madison,In Re Const Deficiences.Pp 1-23 1986-08-19
[Table view] Category:PLEADINGS
MONTHYEARML20214K7331986-08-19019 August 1986 Response to Applicant 860702 Suppl to Motion to Terminate Proceedings & NRC 860721 Response to Board 860530 Memorandum & Order.Applicant Cannot Invoke Jurisdiction of NRC & ASLB W/O Accepting Conditions.Certificate of Svc Encl ML20214K7711986-08-12012 August 1986 Responds to NRC Staff Position on 860530 Memorandum & Order Re Facility Site Restoration.Opposes Any Decision Not Providing for clean-up of Site ML20205C3001986-08-11011 August 1986 Request for Extension of Time Until 860815 to File Response to Util 860702 Suppl to Motion to Terminate Proceeding & NRC 860721 Response to 860530 Memorandum & Order.Certificate of Svc Encl ML20203E3681986-07-21021 July 1986 Response to Board 860530 Memorandum & Order Re Util 850404 Motion to Terminate Proceeding & Util 860702 Suppl to Motion.In Absence of Issuance of Notice of Hearing,Util Motion Should Be Granted ML20199L0521986-07-0202 July 1986 Suppl to Motion Supporting Terminating Proceeding.Argues That Board Has No Jurisdiction Over Surrender of Cps. Surrender of Permits to Director of NRR Should Render OL Proceeding Moot ML20140G0741986-03-28028 March 1986 Supplemental Answer Supporting Applicant 850404 Motion to Terminate Proceeding.Rb Samworth Affidavit Encl ML20100G2871985-04-0404 April 1985 Motion to Terminate OL Proceeding.Cps Surrendered to NRC by .Certificate of Svc Encl ML20078R6531983-11-10010 November 1983 Motion for Extension Until 831130 to Respond to Indiana Sassafras Audubon Soc & Valley Watch,Inc Amended Petitions to Intervene & Save the Valley Contentions.Certificate of Svc Encl ML20081M5501983-11-10010 November 1983 Motion for Extension to 831130 to Respond to Amended Petitions to Intervene & to Complete Technical Analysis of Numerous Contentions.Motion Granted by ASLB on 831114 ML20009B2801981-07-10010 July 1981 Addendum to 810414 Petition for Commission Review of NRC 810327 Order to Resume Const at Facility.Independent Engineers Must Defend Determination of 95% Reliability. Certificate of Svc Encl.Related Correspondence ML19343D3821981-04-14014 April 1981 Petition & Supporting Memorandum for Review of NRC 810327 Order to Resume Const.No Written Findings or Conclusions Addressing Adequacy of License Investigation & Repairs of Concrete Placement Have Been Provided ML19323E4901980-05-14014 May 1980 Addl Comments on Intervenor 800507 Pleading Re Resumption of Work.Urges Commission to Consider Encl Affidavits Re Whether IE Should Have Confidence in QC Program & Whether New Madrid Seismic Zone Extension Should Be Made ML19305E5701980-05-0707 May 1980 Comments Re Reopening of Facility,Addressing Licensee 800305 Request for Insp of Safety Matls & Licensee Independent Exam of Concrete.Urges Positive Action Re QC Violations & Improperly Placed Concrete ML19316B1531980-04-29029 April 1980 Response to Save the Valley-Save Marble Hill 800423 Motion to Strike & Objections to Util Bill of Costs Re Civil Action 78-1369 on Appeal.Urges Assigning Costs to State of Ky & Intervenor.W/Certificate of Svc.Related Correspondence ML19211A9511979-12-10010 December 1979 Appeals for Review of Director'S Decision Under 10CFR2.206. Director Abused Discretionary Power in Denying Requests to Reopen Safety Hearings at Meaningful Point in Licensing Process ML19254F8161979-10-20020 October 1979 Motion in Opposition to NRC Motion for Denial of Audubon Society Request for Hearing on NRC 790815 Order Confirming Suspension of safety-related Const.Economic Injury Is Sufficient Status for Hearing ML19208D5071979-09-24024 September 1979 Petition Calling for Revocation of Facility CP ML20136B4331979-09-0101 September 1979 Request to Suspend & Revoke CP & to Reopen Safety Hearings. Newspaper Articles Encl ML19207B4561979-08-29029 August 1979 Petition Objecting to Problems at Plant.Problems Include Poor Const & Qa,Nuclear Waste Storage & Lack of Demonstrated Need for Plant.Requests That CP Be Revoked,Safety Hearings Be Reopened & Congressional Hearings Be Initiated ML19259C8621979-08-12012 August 1979 Requests Revocation of Cp,Reopening of NRC Safety Hearings & Start of Planned Congressional Hearings ML19269D5031979-04-0909 April 1979 Util Responds in Support of De Minimus Theory Per ALAB-509, as Modified by ALAB-512 & 790305 Order.Recommends Termination of Reservation of Jurisdiction Initiated in ALAB-480 & Continued in ALAB-493.Certificate of Svc Encl ML20148H4281978-10-24024 October 1978 NRC Staff'S Response to Motion to Consolidate Hearings on Radon. Ecology Action,Intervenor in One of the Proc & Representing Intervenors in 4 Other Proc Filed 781003 to Consolidate.Nrc Requests Expeditious Ruling by Appeals Bd ML20148C2021978-10-18018 October 1978 Licensee Response in Opposition to Ecology Action of Oswego Motion to Consolidate Hearings on Radon Issue.Motion Should Be Denied.Certificate of Svc Encl ML20148A2451978-10-13013 October 1978 Motion for Aslab to Consolidate Cases Into Single Hearing in Answer to ALAB-480 Re Radon Issue.Evidence Is Generic & Will Apply to All Nuclear Reactors ML20197B2061978-10-0303 October 1978 Intervenor Motion to Consolidate Hearings on Radon Issue. Proposes Joint Representation of Intervenors,Applicants & Staff at Aslab Hearings & Compilation of Generic Proposed Findings 1986-08-19
[Table view] |
Text
._
.- A.
e,
, 'ccc w to uwrc .
O MAY 141980 > :
BEFORE THE NUCLEAR REGULATORY COISIISSIONERS Dd CTse tA th CarDE & 3e:Aa IN RE THE PROPOSED MARBLE IIILL ) DOCKET IJOS. 50-546, 547
% -bk ifUCLEAR POWER PLANT, PUBLIC ) ' ' "" \ ~ /
SERVICE IllDIANA, LICEllSEE )
SAVE THE VALLEY ADDITIOtJAL COMMENTS TO CONfJISSIOITERS COliCERIIIfJG RESUI.iPTION OF WORK AT MARBLE HILL Comes now Save The Valley by its attorney, and states:
- 1. That on May 7, 1980, Save The Valley presented its comments regarding the consideration of the reopening of Mar.ble Hill.
- 2. That this pleading incorporates herein a 'nd makes a part hereof said May 7, 1980 comments.
- 3. That in response to a request of the Honorable Peter Bradford, a Commissioner of the flRC, regarding a Sassafras Audubon Society filing of September 1, 1979, and more particularly concerning " heavy fault" in the base of the ~ reactor containment building, Save The Valley presents the July 7, 1979 Affidavit of one Jewel W. Rogers, the Affidavit of one, Michael L. Walston dated July 8, 1978 and the Affidavit of one, Stanley J. Mortensen dated July 8, 1979; that said Jewel W. Rogers, Michael L. Walston and Stanley J. Mortensen were concrete finishers ac I arble Hill who exposed certain glaring concrete workmanship defects in and around containment and certain alleged improper attitudes of the flewberg-Marble Hill Construction Company; said Exhibits are entitled "1", "2" and "3".
THIS DOCUMENT CONTAINS POOR QUALITY PAGES 8 005 230 h0L G
s
- 4. That further Save The Valley includes herein and makes a part hereof a copy of a certain Charles Edward Cutshall deposition of May 8 3 1979; please see Page 5, 'Line 22 through the end regarding
" water leaking ... at a fast rate", also see Page 18, Line 18 through i
the bottom regarding " patches as large as S... feet in square . ..,
that are patched in"; also see Page 19, Line 1 through end redarding observation of honeycombs; said sworn statement is entitled Exhibit "4".
- 5. Also find enclosed an Affidavit of James E. Henry, Jr. dated September 1, 1979, regarding United States Testing, one of the sub-contractors at Marble Hill, said Exhibit is entitled "S".
- 6. Find enclosed an Affidavit of Gary Huttsell regarding quality of concrete pores and entitled Exhibit "6".
- 7. That the remainder of the additional comments shall center upon the New Madrid Seismic Zone and the Wabash Valley Seismic Zone;
- a. Earthquakes east of the Rocky Mountains differ from their western counterparts in being more perceptible and more damaging.
Eastern earthquakes may be 100 times more perceptible in terms of area.
effect. In effect, the ground shaking has a larger duration at distant points. Geology in the Siting of Nuclear Power Plants, The' Geological Society of America, 1979. . i.
Earthquakes in the center of the United States have received less attention than those in the West. Only in'the New Hadrid Seismic Zone is one able to delineate an active fault system.S Similar studies in
, e other areas should enable one to outline other active faults. Karble Hill is located at the northeastern edge of a l'arger damage cone of the 1811 I ew Madrid earthquake; magnitude - recurrence . curves (Page 88, Figure 3) show that almost as many earthquakes of similar magnitude Page 2. .
s occurred in three (3) months in the New Madrid Seismic Zone as in 40 years in Southern California. Geology In The Siting of Nuclear Power Plants.
f j b. During 1978 and 1979 seismic refraction experiments were carried out in Southeastern Illinois and Southwestern Indiana as part i
of an integrated geological - geophysical research program directed i
toward understanding the seismo-tectonics of the New Madrid Seismic Zone and its extenstion to the Northeast. Recent geophysical results from this program suggest that a basement structural feature extends from the New Madrid area Northeast across the 38th parallel structural feature and northeasterly into Indiana. The Wabash River Valley Fault Zone occurs along the Northwestern margin feature but at an angle to it.
Baldwin, J.L., Crustal Seismic Studies Related to the Northeast Extension of the New Madrid Seismic Zone; from Abstracts with Programs, North-Central Section of Geological Society of America, April 10, 11, 1980 Annual Meeting.
Essentially the New Madrid line runs from the Southeast corner of Mississippi and extends up' into Kentucky, Arkansas and Tennessee; the New Madrid extension according to the above Baldwin Survey may be quite close to Marble Hill and was not considered in the environmental hearing on Marble Hill.
In North-Central Kentucky near Harmony Landing and in Southeastern Indiana near the Charlestown, Indiana Powder Plant, there exists structurally deformed late ordovician to early silurian straca ( a considerable amount of crushed and cracked rock and soil deformation).
, Page 3.
4 Marble Hill lies approximately 13 miles from Harmony Landing, Kentucky and Charlestown, Indiana. Geological Society of America Bulletin, September, 1969, Volume 80, Page 1881.
Because of the New Madrid' Extension Seismic Zone and because of the crushed and cracked rock and soil deformation, it would seem that the earthquake possibilities at Marble Hill are greater than those i
stated in the environmental studies on Marble Hill.
Further studies would seem to be indicated from Mr. Baldwin who is' presently with the Department of Geoscienses at Purdue University in Lafayette, Indiana.
- c. Dr. Stanley M. Totten, Professor of Geology at Hanover Collede in Hanover, Indiana, has granted this writer the right to include his relevant comment regarding the archaeologic'al strata located at Marble Hill; "One of my major concerns is what might happen. if radioactive fluids leak from the reactor containment build'ing. 'The fluid would enter cracks in the bedrock (at Marble Hill) and would flow laterally along the top of the shale and seep out along the river bluff as springs. The fluid would then flow down the steep slopes, soak into the gravel terrace near the river and probably reach the river itself.
Once the fluid became free of the containment building, it would be difficult if not impossible to recapture it."
Page 4.
l l
l l
6 s .. ,
- d. Dr. Totten specifically studied and observed the Charlestown, Indiana and Harmony Landing, Kentucky crushed rock, stone and soil deformation and believes said conditions to cause Marble Hill to be worthy of further seismic studies and believes said results may not ,
necessarily be the same as those made in the environmental findings of the IIRC at the time the original construction permit was granted.
WHEREFORE, the Petitioner respectfully requests the Commissioners to more fully examine the Affidavits and evidence herein to determine for themselves whether the NRC, Division of Inspection: and Enforcement should have confidence that the PSI Quality Control Program is properly rehabilitated, and secondly, whether or not there should be a further study made of the !!ew Madrid Seismic Zone Extension and its implications regarding Marble Hill.
RESPECTFULLY SUBMITTED, SAVE THE VALLEY e
BY: /* S-t % I/i y'IN, ..b THOMAS M. DATTILO, ATTORNEY FOR SAVE THE VALLEY THOMAS M. DATTILO -
ATTORNEY FOR SAVE THE VALLEY 311 EAST MAIN STREET
!!ADISON, INDIANA 47250 PHONE: 812-265-6355 Page 5.