MONTHYEARML20211P1421986-12-16016 December 1986 Order Terminating CPPR-170 & CPPR-171 for Marble Hill Nuclear Generating Station ML20215E6651986-12-16016 December 1986 Notice of Withdrawal of Application for OLs for Marble Hill Nuclear Generating Station,Per Util 850404 Motion to Terminate Proceedings.Aslb Issued Memorandum & Order LBP-86-37 on 861103,terminating OL Proceeding ML20215N6211986-11-0303 November 1986 Memorandum & Order LBP-86-37,terminating OL Proceeding,In Response to Applicant 850404 Motion.Served on 861104 ML20214K7331986-08-19019 August 1986 Response to Applicant 860702 Suppl to Motion to Terminate Proceedings & NRC 860721 Response to Board 860530 Memorandum & Order.Applicant Cannot Invoke Jurisdiction of NRC & ASLB W/O Accepting Conditions.Certificate of Svc Encl ML20214K7711986-08-12012 August 1986 Responds to NRC Staff Position on 860530 Memorandum & Order Re Facility Site Restoration.Opposes Any Decision Not Providing for clean-up of Site ML20205C3001986-08-11011 August 1986 Request for Extension of Time Until 860815 to File Response to Util 860702 Suppl to Motion to Terminate Proceeding & NRC 860721 Response to 860530 Memorandum & Order.Certificate of Svc Encl ML20203E3681986-07-21021 July 1986 Response to Board 860530 Memorandum & Order Re Util 850404 Motion to Terminate Proceeding & Util 860702 Suppl to Motion.In Absence of Issuance of Notice of Hearing,Util Motion Should Be Granted ML20203E4101986-07-21021 July 1986 Supplemental Affidavit of RB Samworth Re Termination of Const in Manner Favoring Reduction or Avoidance of Significant Environ Impacts,Per Util Motion for Withdrawal of Application.Certificate of Svc Encl ML20199L0521986-07-0202 July 1986 Suppl to Motion Supporting Terminating Proceeding.Argues That Board Has No Jurisdiction Over Surrender of Cps. Surrender of Permits to Director of NRR Should Render OL Proceeding Moot ML20206D5771986-06-18018 June 1986 Memorandum & Order Amending ASLB 860530 Order to Allow State of in Sassafras Audubon Soc to File Answer to Applicant Suppl to Motion to Terminate within 10 Days After Svc of Suppl.Encl Served.Served on 860619 ML20198K7291986-05-30030 May 1986 Memorandum & Order Directing That Applicants Suppl 850404 Motion to Terminate OL Proceeding within 30 Days of Svc of Order.Nrc May Respond to Applicants Suppl within 15 Days Following Svc of Suppl.Served on 860602 ML20140G0741986-03-28028 March 1986 Supplemental Answer Supporting Applicant 850404 Motion to Terminate Proceeding.Rb Samworth Affidavit Encl ML20140G1051986-03-27027 March 1986 Affidavit of RB Samworth Determining No Significant Detrimental Impact on or Offsite Resulting from Termination of Proceeding.W/Certificate of Svc ML20100G2871985-04-0404 April 1985 Motion to Terminate OL Proceeding.Cps Surrendered to NRC by .Certificate of Svc Encl ML20082R6581983-12-0808 December 1983 Pp 11 of Response to Sassafras Audubon Soc & Valley Watch, Inc Contentions ML20082K2541983-11-30030 November 1983 Response to Save the Valley,Inc 831021 Provisional Contentions.Contention 2 Should Be Deferred & Contentions 1 & 3-15 Should Not Be Admitted.Certificate of Svc Encl ML20078R6531983-11-10010 November 1983 Motion for Extension Until 831130 to Respond to Indiana Sassafras Audubon Soc & Valley Watch,Inc Amended Petitions to Intervene & Save the Valley Contentions.Certificate of Svc Encl ML20081M5501983-11-10010 November 1983 Motion for Extension to 831130 to Respond to Amended Petitions to Intervene & to Complete Technical Analysis of Numerous Contentions.Motion Granted by ASLB on 831114 ML20081A5011983-10-21021 October 1983 Petition of Save the Valley for Leave to Intervene,Listing 15 Contentions Re Integrity of Concrete in safety-related Structures,Electrical Work,Evacuation Plans & Common Mode Failures.Certificate of Svc Encl ML20024E0511983-08-0808 August 1983 Answer Opposing Indiana Sassafras Audubon Soc 830722 Amended Petition to Intervene.Soc Failed to Particularize Group Interests or Member Interest & Failed to Satisfy Injury in Fact Requirement.Certificate of Svc Encl ML20077G0821983-07-26026 July 1983 Amend to Vally Watch,Inc Petition to Intervene & Request for Hearing Re Ol.Affidavits of Members to Establish Standing Encl ML20077C8481983-07-21021 July 1983 Amend to Petition to Intervene in OL Hearing.Petitioner Makes Requisite Showing That Members Have Standing & Have Authorized Petitioner to Represent Interests.Contentions to Be Litigated Identified.Certificate of Svc Encl ML20090F6761983-07-0101 July 1983 Notices of Appearance in Proceeding.Certificate of Svc Encl ML20023C2321983-05-13013 May 1983 Response to Sassafras Audubon Soc of South Central Indiana 830416 Petition to Intervene.Requisite Standing to Intervene Not Established.Specific Aspects Appropriate for Consideration Identified by Soc.Certificate of Svc Encl ML20074A6481983-05-12012 May 1983 Response Opposing Valley Watch,Inc 820427 Petition for Leave to Intervene in Proceeding.Petitioner Fails to Estabish Sufficient Interest in Proceeding to Establish Standing as Matter of Right or Discretion.W/Certificate of Svc ML20074A4811983-05-12012 May 1983 Response W/O Objection to Save the Valley Petition for Leave to Intervene,Provided Applicant May Object to Contentions & Right to Hearing After Petition Suppl Filed. Certificate of Svc Encl ML20074A4561983-05-12012 May 1983 Answer to Indiana Sassafras Audubon Society (Isas) Petition for Leave to Intervene.Isas Fails to Establish Right to Intervene.Certificate of Svc Encl ML20073P9811983-04-25025 April 1983 Petition of Save the Valley to Intervene in OL Proceeding, Listing Contentions ML20073P9871983-04-19019 April 1983 Petition of Valley Watch,Inc to Intervene in OL Proceeding, Listing Contentions ML20073P9911983-04-16016 April 1983 Petition of Sassafras Audubon Soc of South Central in to Intervene in OL Proceeding,Listing Contentions ML20039B7421981-12-11011 December 1981 Commentary on Rc Deyoung 811208 Supplemental Decision Under 10CFR2.206.Hearing Necessary Since IE Action Allowing Resumption of Concrete Placement Violated Commission Criteria for Plant Reopening.Certificate of Svc Encl ML20062M6301981-12-11011 December 1981 Commentary on Rc Deyoung 811130 Supplemental Decision. Decision Lacks Candor Re Prior Commentary of Ofc of Policy Evaluation.Nrc Established Procedure Extremely Biased. Certificate of Svc Encl ML20039C1801981-11-30030 November 1981 Directors Decision 81-22,supplementing Directors Decision 81-10,permitting Resumption of safety-related Concrete Work. Addl Concrete Sampling Unnecessary to Assure Acceptable Confidence in Quality of Concrete ML20032C5501981-11-0404 November 1981 Response to Commission 811005 Directive to Wj Dircks. Commissioners Should Accept Stated Criteria of 95% Reliability w/95% Confidence on Multiple Sampling Test & Order IE to Rescind 810327 Order.Certificate of Svc Encl ML20140B2651981-08-31031 August 1981 Aug 1981 Official Newsletter of Save the Valley DD-81-10, Order Granting Extension Until 810805 for Commission to Review Directors Decision DD-81-101981-07-21021 July 1981 Order Granting Extension Until 810805 for Commission to Review Directors Decision DD-81-10 ML20009B2801981-07-10010 July 1981 Addendum to 810414 Petition for Commission Review of NRC 810327 Order to Resume Const at Facility.Independent Engineers Must Defend Determination of 95% Reliability. Certificate of Svc Encl.Related Correspondence ML19343D3821981-04-14014 April 1981 Petition & Supporting Memorandum for Review of NRC 810327 Order to Resume Const.No Written Findings or Conclusions Addressing Adequacy of License Investigation & Repairs of Concrete Placement Have Been Provided ML19351D4331980-10-0606 October 1980 Order Granting Extension Until 801014 for Commission to Review Directors Decision Under 10CFR2.206 ML19332B3011980-09-23023 September 1980 Order Granting Extension Until 801006 for Commission to Elect Whether to Review Directors Decision Under 10CFR2.206 ML19332A7581980-09-0202 September 1980 Directors Decision Under 10CFR2.206 Denying Save the Valley Request for Action Re Resumption of Work at Facility. Evidence of Extension of Fault Zone Towards Plant Site Is Inconclusive ML19343B0271980-06-17017 June 1980 Transcript of 800617 Interview of J Henry in Louisville,Ky. Pp 1-242 ML19323E4901980-05-14014 May 1980 Addl Comments on Intervenor 800507 Pleading Re Resumption of Work.Urges Commission to Consider Encl Affidavits Re Whether IE Should Have Confidence in QC Program & Whether New Madrid Seismic Zone Extension Should Be Made ML19305E6111980-05-0707 May 1980 Transcript of 800507 Briefing in Washington,Dc.Pp 1-65. Morning Session ML19305E5701980-05-0707 May 1980 Comments Re Reopening of Facility,Addressing Licensee 800305 Request for Insp of Safety Matls & Licensee Independent Exam of Concrete.Urges Positive Action Re QC Violations & Improperly Placed Concrete ML19316B1531980-04-29029 April 1980 Response to Save the Valley-Save Marble Hill 800423 Motion to Strike & Objections to Util Bill of Costs Re Civil Action 78-1369 on Appeal.Urges Assigning Costs to State of Ky & Intervenor.W/Certificate of Svc.Related Correspondence ML19323D1581980-03-25025 March 1980 Transcript of 800325 Hearing in Madison,In ML19305B7201980-03-13013 March 1980 Memorandum & Order Denying Sassafras Audubon Society & Knob & Valley Audubon Society Requests for Hearing Re IE Order Confirming Const Suspension.Ie Shall Review Requests Prior to Const.W/P Bradford Dissenting Views & Certificate of Svc ML19211A9511979-12-10010 December 1979 Appeals for Review of Directors Decision Under 10CFR2.206. Director Abused Discretionary Power in Denying Requests to Reopen Safety Hearings at Meaningful Point in Licensing Process ML19260B5491979-12-0606 December 1979 Statement of CC Williams Before House Committee on Govt Operations,Subcommittee on Energy & Natural Resources Re Quality of Const at Site 1986-08-19
[Table view] Category:PLEADINGS
MONTHYEARML20214K7331986-08-19019 August 1986 Response to Applicant 860702 Suppl to Motion to Terminate Proceedings & NRC 860721 Response to Board 860530 Memorandum & Order.Applicant Cannot Invoke Jurisdiction of NRC & ASLB W/O Accepting Conditions.Certificate of Svc Encl ML20214K7711986-08-12012 August 1986 Responds to NRC Staff Position on 860530 Memorandum & Order Re Facility Site Restoration.Opposes Any Decision Not Providing for clean-up of Site ML20205C3001986-08-11011 August 1986 Request for Extension of Time Until 860815 to File Response to Util 860702 Suppl to Motion to Terminate Proceeding & NRC 860721 Response to 860530 Memorandum & Order.Certificate of Svc Encl ML20203E3681986-07-21021 July 1986 Response to Board 860530 Memorandum & Order Re Util 850404 Motion to Terminate Proceeding & Util 860702 Suppl to Motion.In Absence of Issuance of Notice of Hearing,Util Motion Should Be Granted ML20199L0521986-07-0202 July 1986 Suppl to Motion Supporting Terminating Proceeding.Argues That Board Has No Jurisdiction Over Surrender of Cps. Surrender of Permits to Director of NRR Should Render OL Proceeding Moot ML20140G0741986-03-28028 March 1986 Supplemental Answer Supporting Applicant 850404 Motion to Terminate Proceeding.Rb Samworth Affidavit Encl ML20100G2871985-04-0404 April 1985 Motion to Terminate OL Proceeding.Cps Surrendered to NRC by .Certificate of Svc Encl ML20081M5501983-11-10010 November 1983 Motion for Extension to 831130 to Respond to Amended Petitions to Intervene & to Complete Technical Analysis of Numerous Contentions.Motion Granted by ASLB on 831114 ML20078R6531983-11-10010 November 1983 Motion for Extension Until 831130 to Respond to Indiana Sassafras Audubon Soc & Valley Watch,Inc Amended Petitions to Intervene & Save the Valley Contentions.Certificate of Svc Encl ML20032C5501981-11-0404 November 1981 Response to Commission 811005 Directive to Wj Dircks. Commissioners Should Accept Stated Criteria of 95% Reliability w/95% Confidence on Multiple Sampling Test & Order IE to Rescind 810327 Order.Certificate of Svc Encl ML20009B2801981-07-10010 July 1981 Addendum to 810414 Petition for Commission Review of NRC 810327 Order to Resume Const at Facility.Independent Engineers Must Defend Determination of 95% Reliability. Certificate of Svc Encl.Related Correspondence ML19343D3821981-04-14014 April 1981 Petition & Supporting Memorandum for Review of NRC 810327 Order to Resume Const.No Written Findings or Conclusions Addressing Adequacy of License Investigation & Repairs of Concrete Placement Have Been Provided ML19323E4901980-05-14014 May 1980 Addl Comments on Intervenor 800507 Pleading Re Resumption of Work.Urges Commission to Consider Encl Affidavits Re Whether IE Should Have Confidence in QC Program & Whether New Madrid Seismic Zone Extension Should Be Made ML19305E5701980-05-0707 May 1980 Comments Re Reopening of Facility,Addressing Licensee 800305 Request for Insp of Safety Matls & Licensee Independent Exam of Concrete.Urges Positive Action Re QC Violations & Improperly Placed Concrete ML19316B1531980-04-29029 April 1980 Response to Save the Valley-Save Marble Hill 800423 Motion to Strike & Objections to Util Bill of Costs Re Civil Action 78-1369 on Appeal.Urges Assigning Costs to State of Ky & Intervenor.W/Certificate of Svc.Related Correspondence ML19211A9511979-12-10010 December 1979 Appeals for Review of Directors Decision Under 10CFR2.206. Director Abused Discretionary Power in Denying Requests to Reopen Safety Hearings at Meaningful Point in Licensing Process ML19254F8161979-10-20020 October 1979 Motion in Opposition to NRC Motion for Denial of Audubon Society Request for Hearing on NRC 790815 Order Confirming Suspension of safety-related Const.Economic Injury Is Sufficient Status for Hearing ML19208D5071979-09-24024 September 1979 Petition Calling for Revocation of Facility CP ML20136B4331979-09-0101 September 1979 Request to Suspend & Revoke CP & to Reopen Safety Hearings. Newspaper Articles Encl ML19207B4561979-08-29029 August 1979 Petition Objecting to Problems at Plant.Problems Include Poor Const & Qa,Nuclear Waste Storage & Lack of Demonstrated Need for Plant.Requests That CP Be Revoked,Safety Hearings Be Reopened & Congressional Hearings Be Initiated ML19259C8621979-08-12012 August 1979 Requests Revocation of Cp,Reopening of NRC Safety Hearings & Start of Planned Congressional Hearings ML19220C6681979-04-11011 April 1979 Response to ALAB-509 Re Radon Emissions & De Minimus Theory from Perkins Record.Certificate of Svc Encl ML19220C8111979-04-11011 April 1979 Response to 790404 Brief of Philadelphia Electric Co,Public Svc Electric & Gas,& Atlantic City (Nj) Electric Co Re De Minimus Theory.Certificate of Svc Encl ML19269D5031979-04-0909 April 1979 Util Responds in Support of De Minimus Theory Per ALAB-509, as Modified by ALAB-512 & 790305 Order.Recommends Termination of Reservation of Jurisdiction Initiated in ALAB-480 & Continued in ALAB-493.Certificate of Svc Encl ML19220D0341979-04-0404 April 1979 Motion to Suspend & Revoke CP for Proposed Facility Because of TMI Incident ML19289F8931979-04-0202 April 1979 Motion for Extension Until 790411 to Prepare Response to ALAB-509.Granted for Appeal Board on 790403 ML20148H4281978-10-24024 October 1978 NRC Staff'S Response to Motion to Consolidate Hearings on Radon. Ecology Action,Intervenor in One of the Proc & Representing Intervenors in 4 Other Proc Filed 781003 to Consolidate.Nrc Requests Expeditious Ruling by Appeals Bd ML20148C2021978-10-18018 October 1978 Licensee Response in Opposition to Ecology Action of Oswego Motion to Consolidate Hearings on Radon Issue.Motion Should Be Denied.Certificate of Svc Encl ML20148A2451978-10-13013 October 1978 Motion for Aslab to Consolidate Cases Into Single Hearing in Answer to ALAB-480 Re Radon Issue.Evidence Is Generic & Will Apply to All Nuclear Reactors ML20197B2061978-10-0303 October 1978 Intervenor Motion to Consolidate Hearings on Radon Issue. Proposes Joint Representation of Intervenors,Applicants & Staff at Aslab Hearings & Compilation of Generic Proposed Findings 1986-08-19
[Table view] |
Text
.
e
=
BEFORE THE IIUCLEAR REGULATORY CO!C4ISSIC.'l 4
WASHIIIGTOtl, D. C.
DOCKETED g
USNRC 8-APR s 21981
- Commissioners, Joseph M. Hendrie, Chairman,
't:;
Peter A.
Bradford Victor G11insky b
Office cf De Secretary
/\\p' 0::ut.;t.Seni:
f
~
John F. Aherne Er # 1 d
((< '
hyh a
"I4Y 0 2 ;ggy,,, AL2 IN THE MATTER OF PUBLIC SERVICE gy
- %g D'00 OF INDIA!!A, MARBLE HILL NUCLEAR
%'a
}
POWER PLANT, DOCKET tlOS. STfi 50-546 k
AND STN 50-547
% j sy k ' lh '0 l
\\?
SAVE THE VALLEY'S PETITIOff TO THE COMMISSIONERS TO REVIEW THE NRC MARCH 27, 1981 ORDER TO RESUME cot!STRUCTION AT MARBLE HILL Comes now Save The Valley, by its attorney, and fo cause of Save The Valley's Petition To The Conmissioners To Review The llRC March 27, 1981 Order To Resume Construetion at Marble Hill, states:
1.
That on or about March 27, 1981, the NRC acting by and through Victor Stello, Direc tor of Inspection and Enforcement, Washington, D.
C.,
(hereinaf ter called Direc tor), lifted the August 15, 1979 Order Confirming Suspension of Construction to the Public Service Company of Indiana.
2.
That there has been approved by the Director in conjunction i
l l
with Save The Valley, the petitioner herein, an agreement to allow an independent examination of the existing concrete at Marble Hill and an examination of tt}e report submitted by the licensee as prepared by Sargent & Lundy, Report SL-3753, 11-20-79,
" Evaluation of In-Place Y
N' 1
Sol 9105040350 l
1
'l l
Concrete,. Marble Hill Generating Station, Units 1 & 2"; at the conclusion of the review, the consultants were to provide " written u
findings and conclusions which address the adequacies of the licensee's
[
i investigation and repairs relative to problems found in the. field after
!t concrete placement," and will " provide written findings and conclusions" I
f addressing the adequacy of the repaired structural or expected strength
[
reduction," Scope For Civil-Struc tural Consultant Support On Marble
[
t Hill dated May 1, 1980 The NRC, Division of Inspection and Enforcement.
l L
Washington, D.C., attached hereto and entitled Exhibit "1".
l 3.
That the NRC, Division of Inspection and Enforcement, Chic ago,
advised orally that a written report of the independent engineers would be submitted to Save The Valley; that Save The Valley's engineering f
i consultant would be privileged to comment thereon, either by mail or.
personally in Washington, D.C.,
at a meeting of the independent engineers, the Save The Valley engineering consultant (presumably with a Save The Valley representative) and the NRC.
4.
That to the petitioner's knowledge, there has been provided no written findings and conclusions which address the adequacy of the licensee's investi6ation and repairs relative to problems found in the field after concrete placement; to the petitioner's knowledge, the i
consultants have not provided signed written findings and conclusions I
which address the question of adequacies of the repaired struc tures or expected strength reduction and Save offered no findings concerning porosity in said concrete.
i l
l 2.
l
1
?
5.
That the petitioner questions whether Victor Stello, the Director of Inspection and Enforcement, Washington, D.C., has abused t
his discretion in lifting the August 15, 1979 order confirming, suspension i of construction without having complied :with subparagraph four (4)
I herein.
i 6.
That the NRC Division of Inspection and Enforcement, has stated l
further that Report SL-3753, suora, should include therein as its criteria that the concrete quality of internal concrete in structures at Marble Hill shall meet the structural integrity criteria of 95%
reliability and 95% confidence level; that on or about barch 4,
- 1981, the Save The Valley engineer rubmitted Exhibit "A" to the NRC, Region III with copies to the Director and the two independent engineers; s aid Exhibit "A" questioned whether the NRC had actual reason to celleve Ona said :est criteria had been met and/or exceeded.
That on March 26, 1981, the petitioner responded :o a letter of Victor Stello dated March 20, 1981 and also enclosed as Exhibit "3".
7.
That as part of a certain March 13, 1960 Pecorandum And Order by the NRC, the Ccn. mission ordered the Director :o "brief the Ccmmission prior to lif ting the order suspending construction at Marble Hill", and, "in any event not (to allow resunption of construction) earlier than five (5) days after the briefing".
and a cognizable interest of 8.
That Save The Valley has standins Save The Valley has been adverc;
- fected by the actions of the
^
Director, on March 27, 1981, and prior thereto if a briefing has been held before the Commissioners and no notice given to the petitioner herein of said briefing.
3.
r e
af
9.
That, further, Save The Valley's interest has been adversely affected by the fact that the Director has granted a resumption of work order without having received the signed written findings and conclusions of the independent engineers;. further, the Director of Inspection and Enforcement has made said order allowing resumption of concrete placing before allowing Save The Valley's engineer time to review the independent engineers' final written report.
10.
That 20 days have not elapsed since the date of the Direc tor of Inspection and Enforcement's decision.
For the above reasons, Save The Valley respectfully requests that the NRC Commissioners review the March 27, 1981 decision of Victor Stello, to determine if he has abused his discretion under 10 CFR'2.206 (c)(1) and other relevant sections of the CFR, and for all other proper relief in the premises.
RESPECTFULLY SUSIIITTED, SAVE THE VALLEY, PETITIOIER
__)J --.brfbM BY:
Th0 MAS M.
DATTILO, A! !ORIEY FOR SAVE THE VALLEY, PETITICIER I
DATED: APRIL 14 1981.
MEMORANDUM Commissioner Bradford in re Public Service Company of Indiana, Memorandum And Order, dated March 13, 1980 in his disscating opinion i
i stated:
I 4.
l l
[
-:e
The quality assurance and quality control (QA-QC) program is supposed to assure that the plant is built according to its design.
If the QA-QC program fails, the plant becomes a pottntial threat ' to the public health and safety, for NRC's regulatory decisions assume the plant is built according to its design.
NRC does not normally monitor nuclear power plant construction in great detail.
Instead, NRC relies primarily on the licensee and their contractors to assure the QA-QC program is working.
7 AEC 7, 11, (1974)
(T)he NRC has found it difficult to support a civil penalty sanction for QA-QC violations because of the general nature of construction permit and QA program requirement.
The Director of NRC's Division of Inspection and Enforce-ment has properly suspended safety-related construction at the 04arble Hill) site pending the licensee's submission of a new QA-QC program which will be judged according to certain stated criteria.
The issue is whether the inspection efforts in this case and the Director's judgment about the proper remedy should be examined in an evidentiary proceeding.
Given the seriousness of the problems uncovered at the site and their possible significance to the safe operation of the plant (a hearing),is potentially helpful to us as a supplement to our own enforcement effort.
Additionally, it would allow interested citizens to participate in assessing and determining the risks they are being told to live with.
.. (A)t Marble Hill, events have given citizens some basis for concern aoout the licensee ('s) commitment to their safety and about the sufficiency of NRC surveillance.
Commissioner Bradford further stated in Wisconsin Electric Power Comoany, Docket No. 50-266 in an Order dated May 12, 1980 in dissent in conjunction with Commissioner Gilinsky the following concerning the levels of illusion involved in the NRC's application in denying hearings:
The (NRC) agency so misstates history that it is clearly either incapable of giving an accurate account of its own past doings or else its legal positions are being chosen after the desired result has been decided.
the Commission's Pell Mell Retreat from meaningful public inciairy in the twisting between here l
and Marble Hill so suggests to the staff and the outside world that the agency is run by people living in fear of their own citizenry.
(T)he message can only be that the NRC's priority in citizen involvement is a relatively low one."
s.
This (dissenting)-opinion (would) (allow) a hearing to a group able to make a reasonable showing that the action taken by the staff had failed in some important respect to remedy a particular safety concern.
The petitioner herein analogizes the present fact situation with the stated comments of Commissioner Bradford with their relevance toward the present Marble Hill state of facts.
The NRC Director of Inspection and Enforcement has, albeit gratuitously, provided for an independent examination of concrete in conjunction with the petitioner under certain stated criteria.
The Director has made a present judgment dated March 27, 1981, which on the surface would manifest that the NRC wanted a desired result, that result being the same as its prior interpretation in initially approving Report SL-3753 soon after Movember 20, 1979.
lias the stated criteria of 95% confidence with 95% reliability been met and/or exceeded?
The petitioner contends based on statistical evidence that said criteria has not been met and/or sufficiently explained to assure the URC and the peopi. ;f Southern Indiana and Northern Kentucky tha: the plant is built according to its design and l
tha: the concrete is a potential threat to the public health and safety l
of the area.
The NRC's independent consultants were to provide written findings and conclusions; they were to provide an independent assessment of the type and extent of deficiencies in concrete construction; they were to 6.
. -. ~
4 provide an independent assessment of needed repairs or remedial actions and independent conclusions regarding capabilities of affected structures to perform the intended design functions..The Director has, in our opinion, abused his. discretion in allowing a resumption of work, allegedly based on the NRC's position prior to the tendering of said above written documentation to the public and to the affected STV engineer.
See Task Order No. 2, Objections Of Tasks, Page 1 of the NRC, Division of Inspection and Enforcement included herein and made a part hereof and entitled Exhibit "C".
This action is not intended to delay the proceedings; has the Director made the resumption order effective immediately, in essence frustrating any attempts by Save The Valley to appeal or thwart his decision Shafiy v.
NRC, !;a. 80-1691 (D.C. Cire. C t. ), November 19, 1980, as reported in ERC, 12-5-80, page 1185.
Concerning 10 CFR, Sec. 2.206(C)(1), within 20 days after :he date of the Directors' decision, under this section that no proceeding will be instituted or other action taken in whole or in part the Commission may on its own motion review that decision in whole or in l
part to determine if the Director has abused his discretion.
This review power does not limit in any way the Commission's supervisory power of delegated staff actions.
7.
i i
l
e I
If the Director has granted the original Section 2.206 request of Save The Valley for the purpose of not allowing any further review thereon, then the Code of Federal Regulations' letter and spirit, in our opinion, has been violated.
It is obvious that the original Order of August 15, 1979, granting a hearing, was a sham.
See Bradford dissenting opinion, in Wisconsin Electric Power Company, Docket No.
of a Section 50-266, dated May 12, 1980, supra.
Likewise the grantina 2.206 Motion of Save The Valley without a finn commitment on the part of the Director to carry out his stated objectives may be considered to be less than acceptible.
For the above reasons, the petitioner respectfully requests the NRC Commissioners to review in whole and in part the actions of the Director on March 27, 1981 to determine whether or not he has abused-his discretion; and to rescind the Director's March 27, 1981 resumption of work order, and for all other proper relief in :he premises.
SAVE THE VALLEY, PETITIONER BY:
- 4. O A
THOPAS M.
DATTILO, ATTORHEY FOR SAVE THE VALLEY, PETITIONER 311 EAST MAIM STREET MADISON, INDIANA 47250 PHONE: 812-265-6355 DATED: APRIL 14, 1981 l
1 8.
i
~
CERTIFICATE OF SERVICE I hereby certify that a copy of the foregoing Petition ha,s been mailed to the following:
Peter A. Bradford, tiRC, Washington, D.C. 20555, Certified Mail Joseph M. Hendrie, tIRC, Washington, D.C. 20555, Regular U.S. Mail Victor Gilinsky, flRC, Washington, D.C. 20555, Regular U.S. Mail John F. Aherne, tJRC, Washington, D.C. 20S55, Regular U.S. Mail James Keppler, !!RC, Roosevelt Rd., Glen Ellyn, Ill., Reg. U.S. Mail James Pope, Public Service Co. of Indiana, 1000 E. Maln St.,
Plainfield, Indiana 46168 Regular U.S. Mail tiRC Docketing Section, Washington, D.C.
20555, Regular U.S.
': ail,
postage prepaid, this 14th day of April, 1981.
N Ms THOMAS M.
DATTILO e,
k
/
s\\
ee'esgg,2 3
l kog2..,,,.....-,~-3/
,5/
l t '~
'k*,Q gnA j
i
/
Q'-
1 l
9.
l l
5/1/80 SCOPE FOR CIVIL-STRUCTURAL CONSULTANT SUPp0RT ON MARBLE HILL The scope of the work to be completed by a civil-structural engineer or group will include a review of the deficiencies which were found through visual observation such as the local honeycombing and voids to ascertain that significant deficiencies were detected. The effort will also involve a review of the other techniques used to locate voids, discontinuities, etc., to determine if all significant deficie.1cies have in all probability been detected. These techniques included coring and pulse echo. The repair procedures and repairs made as a result of the findings of the investigations are also to be reviewed for adequacy.
The main basis of the consultant's review effort will be the report submitted by the licensee and its references as prepared by Sargent &,
Lundy, Report SL-3753,11/20/79, " Evaluation of In-Place Concrete, Marble Hill Generating Station, Units 1 and 2."
At the conclusion of the review, the consultant will provide written findings and conclusions which address the adequacy of the licensee's investigation and repairs reiative to problems found in the field after concrete placement. The consultant.will also need to provide written findings and conclusions which i
address the question of structural adequacy of the repaired structures or 1
I expected strength reduction, if such is the case.