Letter Sequence Other |
---|
EPID:L-2017-LLA-0030, Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (Approved, Closed) |
|
MONTHYEARML18022A6122018-01-19019 January 2018 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System-Request for Additional Information Project stage: RAI ML19011A1272019-01-29029 January 2019 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Second Request for Additional Information (W/Enclosure) Project stage: RAI ML19093A0472019-03-18018 March 2019, 4 April 2019 Package: Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate If Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 Project stage: Request ML19093A0482019-04-0404 April 2019 Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate of Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (W/Enclosure 1) Project stage: RAI ML19193A0172019-07-11011 July 2019 Letter to R. Ngwayah Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Updated Review Schedule Project stage: Other ML19198A1402019-07-15015 July 2019 Letter to R. Ngwayah Approval of Holtec International Request for Withholding Information from Public Disclosure - Certificate of Compliance No. 1032, HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment Request No. 4 Project stage: Withholding Request Acceptance ML19158A2752019-12-20020 December 2019 Enclosure 3: Proposed CoC 1032 Amendment No. 4 Appendix B (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2722019-12-20020 December 2019 Memorandum to J. Cai User Need for Rulemaking for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Other ML19158A2732019-12-20020 December 2019 Enclosure 1: Proposed CoC 1032 Amendment No. 4 (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2742019-12-20020 December 2019 Enclosure 2: Proposed CoC 1032 Amendment No. 4 Appendix a (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML19158A2712019-12-20020 December 2019 Package: User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 Project stage: Request ML19158A2762019-12-20020 December 2019 Enclosure 4: Preliminary CoC 1032 Amendment No. 4 SER (Memorandum to J. Cai User Need for Rule Making for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4) Project stage: Other ML20155K7452020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Final Safety Evaluation Report Project stage: Approval ML20155K7402020-06-15015 June 2020 Issuance of Certificate of Compliance No 1032 Amendment No. 4 for HI-STORM Flood/Wind Mulitpurpose Canister Storage System Project stage: Request ML20155K7442020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix B Project stage: Other ML20155K7432020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Appendix a Project stage: Other ML20155K7422020-06-15015 June 2020 Certificate of Compliance No. 1032 Amendment No. 4 Project stage: Other ML20155K7412020-06-15015 June 2020 Letter to Holtec Issuing Certificate of Compliance No. 1032 Amendment No. 4 for HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Other 2019-03-18
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML24018A0852024-01-31031 January 2024 Safety Determination of a Potential Structural Failure of the Full Basket During Accident Conditions for the HI-STORM 100 and HI-STORM Flood/Wind Dry Cask Storage Systems ML22327A2292022-12-0909 December 2022 Summary of Public Meeting with Holtec International, LLC to Discuss Amendment No. 10 to Certificate of Compliance No. 1032 ML22145A4072022-10-13013 October 2022 User Need Memorandum for Rulemaking for the Holtec HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 6 ML22019A2462022-04-25025 April 2022 HI-STORM FW Amendment 8 Rulemaking User Need Memo ML21123A0622021-05-0505 May 2021 Summary of Public Meeting with Holtec International to Discuss Upcoming Application for Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind, Amendment No. 7 ML21082A0852021-04-0909 April 2021 Summary of Closed Meeting with Holtec International and U.S. Nuclear Regulatory Commission Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems ML20014E6172020-02-14014 February 2020 Memo Re User Need for Rulemaking for the Holtec HI-STORM FW MPC System, Amendment No. 5 ML19158A2722019-12-20020 December 2019 Memorandum to J. Cai User Need for Rulemaking for the Holtec HI-STORM Flood-Wind Multipurpose Canister Storage System, Amendment No. 4 ML19093A0482019-04-0404 April 2019 Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate of Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (W/Enclosure 1) ML18289A4132018-10-16016 October 2018 Memorandum to A. Rivera-Varona Summary of September 12, 2018, Licensing Meeting with Holtec International to Discuss Technical Topics Related to Two Amendments Applications (W/Enclosure) 2024-01-31
[Table view] |
Text
December 20, 2019 MEMORANDUM TO: June Cai, Chief Materials Rulemaking and Project Management Branch Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards FROM: Daniel I. Doyle, Acting Chief /RA/
Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards
SUBJECT:
USER NEED FOR RULEMAKING FOR THE HOLTEC HI-STORM FLOOD/WIND MULTIPURPOSE CANISTER STORAGE SYSTEM, AMENDMENT NO. 4 The purpose of this communication is to request support for rulemaking activities in the Division of Fuel Management (DFM) for the following Title 10 of the Code of Federal Regulations (10 CFR) Part 72 licensing action:
- 1. Changes to 10 CFR 72.214 rule text (changes appear in bold):
Certificate Number: 1032.
Initial Certificate Effective Date: June 13, 2011, superseded by Amendment Number 0, Revision 1, on April 25, 2016.
- Amendment Number 4 Effective Date: [insert 75 days from date of Federal Register publication].
SARs Submitted by: Holtec International.
SAR
Title:
Final Safety Analysis Report for the HI-STORM FW System.
Docket Number: 72-1032.
Certificate Expiration Date: June 12, 2031.
Model Numbers: HI-STORM FW MPC-32ML, MPC-37, and MPC-89.
- 2. By letter dated March 11, 2016, and as supplemented on September 16, 2016, January 31, 2017, April 27, 2018, July 27, 2018, April 12, 2019, June 11, 2019, and July 5, 2019, Holtec International submitted an amendment request to the U.S. Nuclear Regulatory Commission for the HI-STORM Flood/Wind Multipurpose Canister Storage System Certificate of Compliance (CoC) No. 1032. The proposed changes include the following:
CONTACT: Yen-Ju Chen, NMSS/DFM (301) 415-1018
J. Cai 1) Add MPC-32ML for storage in HI-STORM FW system and allow fuel assembly class 16x16D as content for MPC-32ML.
- 2) Add fuel assembly class 16x16E as content for MPC-37.
- 3) Separate the design pressure for the short-term operation from the off normal condition to provide clarity in final safety analysis report (FSAR) Table 2.2.1.
- 4) Add a caution note in FSAR Section 9.2.1 that states fuel cladding is not exposed to air during loading operations.
- 5) Update the definition of undamaged fuel assembly in FSAR Glossary to be aligned with the definition in Appendix A and FSAR Table 2.1.3 (Note 14).
- 6) Replace Charpy test program with fracture toughness test program from the revised Metamic-HT Sourcebook (Holtec, 2017b) in FSAR Sections 1.2.1.4.1 and 3.4.
- 7) Add a caution note in FSAR Section 9.2.3 that states low-enriched fuel must be shown to be without known or suspected grossly breached rods.
- 3. The proposed CoC, CoC Appendix ATechnical Specifications, CoC Appendix B Approved Contents and Design Features, and preliminary safety evaluation report (SER) have been placed in ADAMS (see references below) and are available for your use in the rulemaking package. DFM will designate these documents as Official Agency Records after the Executive Director for Operations has approved the package (ADAMS Package No. ML19158A271).
The Office of the General Counsel has reviewed this memorandum with its referenced documents and has no legal objection to its contents.
DOCKET No.: 72-1032 CAC No.: 001028 EPID: L-2017-LLA-0030 ADAMS
References:
- 1. Proposed CoC 1032 Amendment No. 4 (ML19158A273)
- 2. Proposed CoC 1032 Amendment No. 4 Appendix A (ML19158A274)
- 3. Proposed CoC 1032 Amendment No. 4 Appendix B (ML19158A275)
- 4. Preliminary CoC 1032 Amendment No. 4 SER (ML19158A276)
Package: ML19158A271, Memo: ML19158A272
- concur by email OFFICE DFM DFM OGC DFM NAME YChen WWheatley* LClark* DDoyle DATE 12/19/2019 9/19/2019 12/18/2019 12/20/2019