MONTHYEARML20034F0532020-01-31031 January 2020 Proposed License Amendment Request: Allowed Outage Time Extension for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F Response to Request for Clarification and Additional Information ML19105B0552019-04-15015 April 2019 Superseded Pages Per Revision No. 01 to Environmental Sampling Program ML0501805082004-07-19019 July 2004 Associated System Drawings in Support of North Anna Power Station Units 1 & 2, and Surry Power Station Units 1 & 2, ASME Section XI Inservice Inspection Program End of Intervals System Pressure Testing ML0413302072004-05-0505 May 2004 Drawing 11548-FM-1E, Rev 10, Machinery Location Reactor Continment Sections A-A, X-X & F-F Surry Power Station - Unit 2. Sheet 1 of 1 ML0413302082004-05-0505 May 2004 Drawing 11548-FM-1F, Rev 9, Mach. Loc. Reactor Cont. Sections B-B. E-E. Y-Y & Z-Z Surry Power Station - Unit 2. Shet 1 of 1 ML0413302092004-05-0505 May 2004 Drawing 11548-FM-10, Rev 9, Mach Loc Reactor Cont Sections C-C & D-D Surry Power Station - Unit 2. Sheet 1 of 1 ML0414804032004-01-30030 January 2004 Drawing 11448-FE-7B, Rev 21, Wiring Diagram Annunciator (ANN-VSP) Surry Power Station - Unit 1. Sheet 1 of 1 ML0414804142002-05-29029 May 2002 Drawing 11448-FB-27A, Rev 16, Plumbing and Fire Protection Service Building Surry Power Station - Unit 1. Sheet 1 of 1 ML0414804152002-01-31031 January 2002 Drawing 11448-FB-25E, Rev 22, Ventilation & Air Conditioning Service Building - El. 9' - 6 Surry Power Station - Unit 1. Sheet 1 of 1 ML19095A2821978-02-22022 February 1978 Response to Request for Information on LOCA Pipe Break Inside Reactor Vessel Cavity ML19095A2841978-02-15015 February 1978 Presenting, Unit 2 Steam Generator Surveillance Program Outage Schedule & Information of Program ML19093B0471977-12-23023 December 1977 Request for NRC Review of Test Performance Data on Defense Apparel Air Hood & for Permission to Continue Using of Hood Indicated by VEPCO Letter of 12/6/1977 with Serial No. 558 ML19093B0821977-12-0101 December 1977 Response to a Letter of 09/14/1977 Regarding the Potential for a Boron Dilution Accident at Surry Unit Nos. 1 & 2 Due to Injection of Contents of Naoh Tank Into Reactor Coolant System ML19093A9671977-09-0101 September 1977 Letter Serial # 374 Dated 08/29/1977 Provided Information Regarding NPSH Available for Lead Safety Injection Pumps at Surry. Determined That Procedures Should Be Implemented to Throttle Valves in Lhsi Pump Discharge ML19098B4441977-06-28028 June 1977 Provide Requested Information Relative to Site Settlement to Close Previously Unresolved Item Identified as 76-15/1, Site Settlement Surveillance ML19095A5541977-01-11011 January 1977 Submit Licensee Event Report No. AO-S1-76-08 Re Broken Stud from 2A Steam Generator Girth Strap with Unit 2 ML19105A1811975-12-31031 December 1975 Submit Supplement to Initial Report Dated 12/4/1975, Which Responded to IE Bulletin 75-04B, as Requested ML19098B2971975-10-28028 October 1975 10/28/1975 Letter Supplemental Information in Technical Specification Change No. 33 2020-01-31
[Table view] Category:Letter
MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] |
Text
RICHMOND, VIRGIN IA 23261 February.15, 1978:
Mr. Edson G. Case, Acting Director Serial No. 074 Office of Nuclear Reactor Regulation PO&M/DLB:das U. S. Nuclear Regulatory Commission Docket No. 50-281 Washington, D.C. 20555 License No. DPR-37 Attn: Mr. Robert W. Reid, Chief Operating Reactors Branch 4
Dear Mr. Case:
The purpose of this letter is to present the Surry Unit No. 2 steam genera-tor surveillance program for the forthcoming outage which is scheduled to begin on or about March 15, 1978. The program will consist of the following:
- 1. Eddy current testing of U-bends as follows:
- a. Unplugged tubes in all steam generators rows 1-5, columns 1-92 tested *at 100 KHZ using beaded flex probe.
- b. Any tubes which give indications at 100 KHZ will be reprobed at 400 KHZ. .
- 2. Tube gauging will be conducted in the cold legs of all steam genera-tors utilizing probe sizes 0.610" and 0.540'\ Extent of gauging is as indicated on Figure 1 (dashed line). * *
- 3. Tube gauging will be conducted in the hot legs of all steam genera-tors utilizing three different eddy current probe sizes (0.540",
0.610", and 0.650" diameters). Extent of gauging is indicated in Figure 1 (solid line). The 15% strain contour at .11.5 EFPM past closure was utilized as the basis for the boundary.
- 4. Wrapper to shell annulus measurements will be performed in steam gen-erator A.
- 5. Handhole inspections using photographs will be performed to inspect flow slots and determine the extent of hourglassing on the visible tube support plates in all steam generators.
- 6. All tubes which did not pass a .650" probe during the inspection of October 1977 will be tested as well as surrounding tubes for a dis-tance of 2 tubes in all directions. For any surrounding tube which does not pass the .650 11 probe, all of its surrounding tubes for a dis-tance of 2 tubes in all directions will be tested; this process con-tinuing until no further indications are found.
n.oe> I f1 ~,,
7*:3()52()21 ~=~
VIRGINIA ELECTRIC AND POWER COMPANY TO
-
Page No. 2
- 7. Preventive plugging based on inspection results.
The plugging program and its associated operating period will be forwarded when the surveillance program data has been evaluated.
Very truly yours, 41dl)?.~4t~
C. M. Stallings Vice President - Power Supply and Production Operations Attachment (Figure 1) cc: Mr. James P. O'Reilly