Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20034F053 | 31 January 2020 | Proposed License Amendment Request: Allowed Outage Time Extension for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F Response to Request for Clarification and Additional Information | Reserve Station Service Transformer |
ML19105B055 | 15 April 2019 | Superseded Pages Per Revision No. 01 to Environmental Sampling Program | |
ML050180508 | 19 July 2004 | Associated System Drawings in Support of North Anna Power Station Units 1 & 2, and Surry Power Station Units 1 & 2, ASME Section XI Inservice Inspection Program End of Intervals System Pressure Testing | |
ML041330207 | 5 May 2004 | Drawing 11548-FM-1E, Rev 10, Machinery Location Reactor Continment Sections A-A, X-X & F-F Surry Power Station - Unit 2. Sheet 1 of 1 | |
ML041330208 | 5 May 2004 | Drawing 11548-FM-1F, Rev 9, Mach. Loc. Reactor Cont. Sections B-B. E-E. Y-Y & Z-Z Surry Power Station - Unit 2. Shet 1 of 1 | |
ML041330209 | 5 May 2004 | Drawing 11548-FM-10, Rev 9, Mach Loc Reactor Cont Sections C-C & D-D Surry Power Station - Unit 2. Sheet 1 of 1 | |
ML041480403 | 30 January 2004 | Drawing 11448-FE-7B, Rev 21, Wiring Diagram Annunciator (ANN-VSP) Surry Power Station - Unit 1. Sheet 1 of 1 | |
ML041480414 | 29 May 2002 | Drawing 11448-FB-27A, Rev 16, Plumbing and Fire Protection Service Building Surry Power Station - Unit 1. Sheet 1 of 1 | |
ML041480415 | 31 January 2002 | Drawing 11448-FB-25E, Rev 22, Ventilation & Air Conditioning Service Building - El. 9' - 6 Surry Power Station - Unit 1. Sheet 1 of 1 | |
ML19095A282 | 22 February 1978 | Response to Request for Information on LOCA Pipe Break Inside Reactor Vessel Cavity | |
ML19095A284 | 15 February 1978 | Presenting, Unit 2 Steam Generator Surveillance Program Outage Schedule & Information of Program | |
ML19093B047 | 23 December 1977 | Request for NRC Review of Test Performance Data on Defense Apparel Air Hood & for Permission to Continue Using of Hood Indicated by VEPCO Letter of 12/6/1977 with Serial No. 558 | |
ML19093B082 | 1 December 1977 | Response to a Letter of 09/14/1977 Regarding the Potential for a Boron Dilution Accident at Surry Unit Nos. 1 & 2 Due to Injection of Contents of Naoh Tank Into Reactor Coolant System | Shutdown Margin |
ML19093A967 | 1 September 1977 | Letter Serial # 374 Dated 08/29/1977 Provided Information Regarding NPSH Available for Lead Safety Injection Pumps at Surry. Determined That Procedures Should Be Implemented to Throttle Valves in Lhsi Pump Discharge | |
ML19098B444 | 28 June 1977 | Provide Requested Information Relative to Site Settlement to Close Previously Unresolved Item Identified as 76-15/1, Site Settlement Surveillance | |
ML19095A554 | 11 January 1977 | Submit Licensee Event Report No. AO-S1-76-08 Re Broken Stud from 2A Steam Generator Girth Strap with Unit 2 | Coatings Design basis earthquake |
ML19105A181 | 31 December 1975 | Submit Supplement to Initial Report Dated 12/4/1975, Which Responded to IE Bulletin 75-04B, as Requested | Hydrostatic Fire Protection Program |
ML19098B297 | 28 October 1975 | 10/28/1975 Letter Supplemental Information in Technical Specification Change No. 33 |