Category:CONTRACTED REPORT - RTA
MONTHYEARML20206F0721999-03-31031 March 1999 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1 ML20154K3011998-06-30030 June 1998 Technical Evaluation Rept, Third Ten-Year Interval Pump & Valve Inservice Testing Program, for Arkansas Nuclear One, Unit 1,Entergy Operations,Inc ML20138G5221996-10-25025 October 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Plant,Unit 1 Npp ML20138K0621995-11-30030 November 1995 TER on IPE Submittal Human Reliability Analysis, Final Rept ML20138F0921995-11-30030 November 1995 TER on IPE Back End Analysis ML20138F0811995-11-27027 November 1995 TER on IPE Front End Analysis L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 21995-09-30030 September 1995 Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 ML20080B4931994-11-30030 November 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994 ML20116A4741992-09-30030 September 1992 Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power Plant ML20127E3291992-09-30030 September 1992 TER Pump & Valve IST Program Ano,Unit 2 ML20118A0111992-03-31031 March 1992 TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1 ML20072R9611991-03-31031 March 1991 TER Review of ANO-1 CST Seismic Design ML20154H5451988-08-31031 August 1988 Evaluation of Risks Associated with AOT and STI Requirements at the ANO-1 Nuclear Power Plant ML20153D4321988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 1,Program for Inspectors ML20153D4951988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 2,Program for Regulators ML20150F3441988-03-31031 March 1988 PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company) ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20214L2871986-08-25025 August 1986 Evaluation of Arkansas Power & Light Co Dcrdr of Arkansas Nuclear One - Unit 1 Plant, Technical Evaluation Rept ML20214L9881986-08-25025 August 1986 Evaluation of Dcrdr for Arkansas Power & Light Co Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210K6841986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3 ML20154D3021986-01-21021 January 1986 Site Survey of Arkansas Nuclear One Unit 2 Maint Program & Practices, Technical Ltr Rept ML20155F9141985-10-31031 October 1985 Addendum a to First Internal Inservice Insp Program, Arkansas Nuclear Power Plant,Unit 1 Technical Evaluation Rept ML20140C7801985-10-31031 October 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Arkansas Nuclear Power Plant Unit 1 ML20138N9261985-10-31031 October 1985 Audit Rept of Dcrdr for Arkansas Nuclear One,Unit 1, for Oct 1985 ML20210A5811985-10-30030 October 1985 Review of Licensee & Applicant Responses to Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2,Arkansas Nuclear One, Units 1 & 2..., Technical Evaluation Rept ML20211L0471985-08-31031 August 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20112E0811985-03-31031 March 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20116B3661985-02-28028 February 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2 ML20106A6631984-09-24024 September 1984 Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2 ML20083M3101984-04-0202 April 1984 Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation Rept ML20087J8841984-02-29029 February 1984 Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability Analysis ML20082S7671983-10-0707 October 1983 Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1 ML20087L9201983-09-30030 September 1983 Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2 ML20087L9141983-09-30030 September 1983 Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2 ML20087L9111983-08-31031 August 1983 Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1 ML20024B9571983-07-31031 July 1983 Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. ML20077B8541983-07-20020 July 1983 Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept ML20024C8521983-06-30030 June 1983 the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power Plant ML20024E5151983-03-24024 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2 ML20079P5731983-03-21021 March 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept ML20076C3641982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065F2951982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation Rept ML20092J9021982-09-24024 September 1982 Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater Sys ML20064M2781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company) 1999-03-31
[Table view] Category:QUICK LOOK
MONTHYEARML20206F0721999-03-31031 March 1999 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1 ML20154K3011998-06-30030 June 1998 Technical Evaluation Rept, Third Ten-Year Interval Pump & Valve Inservice Testing Program, for Arkansas Nuclear One, Unit 1,Entergy Operations,Inc ML20138G5221996-10-25025 October 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Plant,Unit 1 Npp ML20138K0621995-11-30030 November 1995 TER on IPE Submittal Human Reliability Analysis, Final Rept ML20138F0921995-11-30030 November 1995 TER on IPE Back End Analysis ML20138F0811995-11-27027 November 1995 TER on IPE Front End Analysis L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 21995-09-30030 September 1995 Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 ML20080B4931994-11-30030 November 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994 ML20116A4741992-09-30030 September 1992 Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power Plant ML20127E3291992-09-30030 September 1992 TER Pump & Valve IST Program Ano,Unit 2 ML20118A0111992-03-31031 March 1992 TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1 ML20072R9611991-03-31031 March 1991 TER Review of ANO-1 CST Seismic Design ML20154H5451988-08-31031 August 1988 Evaluation of Risks Associated with AOT and STI Requirements at the ANO-1 Nuclear Power Plant ML20153D4321988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 1,Program for Inspectors ML20153D4951988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 2,Program for Regulators ML20150F3441988-03-31031 March 1988 PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company) ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20214L2871986-08-25025 August 1986 Evaluation of Arkansas Power & Light Co Dcrdr of Arkansas Nuclear One - Unit 1 Plant, Technical Evaluation Rept ML20214L9881986-08-25025 August 1986 Evaluation of Dcrdr for Arkansas Power & Light Co Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210K6841986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3 ML20154D3021986-01-21021 January 1986 Site Survey of Arkansas Nuclear One Unit 2 Maint Program & Practices, Technical Ltr Rept ML20155F9141985-10-31031 October 1985 Addendum a to First Internal Inservice Insp Program, Arkansas Nuclear Power Plant,Unit 1 Technical Evaluation Rept ML20140C7801985-10-31031 October 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Arkansas Nuclear Power Plant Unit 1 ML20138N9261985-10-31031 October 1985 Audit Rept of Dcrdr for Arkansas Nuclear One,Unit 1, for Oct 1985 ML20210A5811985-10-30030 October 1985 Review of Licensee & Applicant Responses to Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2,Arkansas Nuclear One, Units 1 & 2..., Technical Evaluation Rept ML20211L0471985-08-31031 August 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20112E0811985-03-31031 March 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20116B3661985-02-28028 February 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2 ML20106A6631984-09-24024 September 1984 Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2 ML20083M3101984-04-0202 April 1984 Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation Rept ML20087J8841984-02-29029 February 1984 Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability Analysis ML20082S7671983-10-0707 October 1983 Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1 ML20087L9201983-09-30030 September 1983 Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2 ML20087L9141983-09-30030 September 1983 Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2 ML20087L9111983-08-31031 August 1983 Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1 ML20024B9571983-07-31031 July 1983 Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. ML20077B8541983-07-20020 July 1983 Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept ML20024C8521983-06-30030 June 1983 the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power Plant ML20024E5151983-03-24024 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2 ML20079P5731983-03-21021 March 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept ML20076C3641982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065F2951982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation Rept ML20092J9021982-09-24024 September 1982 Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater Sys ML20064M2781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company) 1999-03-31
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20206F0721999-03-31031 March 1999 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1 ML20154K3011998-06-30030 June 1998 Technical Evaluation Rept, Third Ten-Year Interval Pump & Valve Inservice Testing Program, for Arkansas Nuclear One, Unit 1,Entergy Operations,Inc ML20138G5221996-10-25025 October 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Plant,Unit 1 Npp ML20138K0621995-11-30030 November 1995 TER on IPE Submittal Human Reliability Analysis, Final Rept ML20138F0921995-11-30030 November 1995 TER on IPE Back End Analysis ML20138F0811995-11-27027 November 1995 TER on IPE Front End Analysis L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 21995-09-30030 September 1995 Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 ML20080B4931994-11-30030 November 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994 ML20116A4741992-09-30030 September 1992 Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power Plant ML20127E3291992-09-30030 September 1992 TER Pump & Valve IST Program Ano,Unit 2 ML20118A0111992-03-31031 March 1992 TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1 ML20072R9611991-03-31031 March 1991 TER Review of ANO-1 CST Seismic Design ML20154H5451988-08-31031 August 1988 Evaluation of Risks Associated with AOT and STI Requirements at the ANO-1 Nuclear Power Plant ML20153D4321988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 1,Program for Inspectors ML20153D4951988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 2,Program for Regulators ML20150F3441988-03-31031 March 1988 PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company) ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20214L2871986-08-25025 August 1986 Evaluation of Arkansas Power & Light Co Dcrdr of Arkansas Nuclear One - Unit 1 Plant, Technical Evaluation Rept ML20214L9881986-08-25025 August 1986 Evaluation of Dcrdr for Arkansas Power & Light Co Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210K6841986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3 ML20154D3021986-01-21021 January 1986 Site Survey of Arkansas Nuclear One Unit 2 Maint Program & Practices, Technical Ltr Rept ML20155F9141985-10-31031 October 1985 Addendum a to First Internal Inservice Insp Program, Arkansas Nuclear Power Plant,Unit 1 Technical Evaluation Rept ML20140C7801985-10-31031 October 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Arkansas Nuclear Power Plant Unit 1 ML20138N9261985-10-31031 October 1985 Audit Rept of Dcrdr for Arkansas Nuclear One,Unit 1, for Oct 1985 ML20210A5811985-10-30030 October 1985 Review of Licensee & Applicant Responses to Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2,Arkansas Nuclear One, Units 1 & 2..., Technical Evaluation Rept ML20211L0471985-08-31031 August 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20112E0811985-03-31031 March 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20116B3661985-02-28028 February 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2 ML20106A6631984-09-24024 September 1984 Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2 ML20083M3101984-04-0202 April 1984 Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation Rept ML20087J8841984-02-29029 February 1984 Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability Analysis ML20082S7671983-10-0707 October 1983 Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1 ML20087L9201983-09-30030 September 1983 Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2 ML20087L9141983-09-30030 September 1983 Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2 ML20087L9111983-08-31031 August 1983 Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1 ML20024B9571983-07-31031 July 1983 Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. ML20077B8541983-07-20020 July 1983 Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept ML20024C8521983-06-30030 June 1983 the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power Plant ML20024E5151983-03-24024 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2 ML20079P5731983-03-21021 March 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept ML20076C3641982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065F2951982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation Rept ML20092J9021982-09-24024 September 1982 Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater Sys ML20064M2781982-08-31031 August 1982 Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company) 1999-03-31
[Table view] Category:RESEARCH AND TECHNICAL ASSISTANCE REPORTS
MONTHYEARML20024B9571983-07-31031 July 1983 Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. ML20062M0441982-07-31031 July 1982 Technical Evaluation Rept of Overpressure Protection Sys for AR Nuclear One,Unit 1, Informal Rept ML20050A2941982-02-28028 February 1982 Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept ML20041D2161982-01-31031 January 1982 Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept ML20039G3691981-11-30030 November 1981 Tech Specs for Redundant Decay Heat Removal Capability,Ar Nuclear One,Unit 2. ML20003F1191981-03-31031 March 1981 Tech Spec Change for AR Nuclear One - Unit 2, Technical Evaluation Rept ML19247E2041981-02-28028 February 1981 Technical Evaluation Rept,Tech Specs Change for AR Nuclear One,Unit 2,Docket 50-368, Preliminary Rept ML19326D9221980-06-30030 June 1980 Electrical,Instrumentation & Control Aspects of Low Temp Overpressure Mitigation Sys,Ar Nuclear One,Unit 1. ML17318A7361980-03-31031 March 1980 Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals, Informal Interim Rept.Prepared for DOE ML19270F4101978-12-31031 December 1978 Recommendations to NRC on Inservice Testing Program. 1983-07-31
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20206F0721999-03-31031 March 1999 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1 ML20154K3011998-06-30030 June 1998 Technical Evaluation Rept, Third Ten-Year Interval Pump & Valve Inservice Testing Program, for Arkansas Nuclear One, Unit 1,Entergy Operations,Inc ML20138G5221996-10-25025 October 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Plant,Unit 1 Npp ML20138K0621995-11-30030 November 1995 TER on IPE Submittal Human Reliability Analysis, Final Rept ML20138F0921995-11-30030 November 1995 TER on IPE Back End Analysis ML20138F0811995-11-27027 November 1995 TER on IPE Front End Analysis L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 21995-09-30030 September 1995 Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 ML20080B4931994-11-30030 November 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994 ML20116A4741992-09-30030 September 1992 Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power Plant ML20127E3291992-09-30030 September 1992 TER Pump & Valve IST Program Ano,Unit 2 ML20118A0111992-03-31031 March 1992 TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1 ML20072R9611991-03-31031 March 1991 TER Review of ANO-1 CST Seismic Design ML20059L5301990-09-21021 September 1990 Notification of Contract Execution,Mod 1,Task Order 8,to Nuclear Power Reactor Operations,Mods & Maint Insp Svcs. Contractor:Parameter,Inc ML20154H5451988-08-31031 August 1988 Evaluation of Risks Associated with AOT and STI Requirements at the ANO-1 Nuclear Power Plant ML20153D4321988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 1,Program for Inspectors ML20153D4951988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 2,Program for Regulators ML20150F3441988-03-31031 March 1988 PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company) ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20214L9881986-08-25025 August 1986 Evaluation of Dcrdr for Arkansas Power & Light Co Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20214L2871986-08-25025 August 1986 Evaluation of Arkansas Power & Light Co Dcrdr of Arkansas Nuclear One - Unit 1 Plant, Technical Evaluation Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210K6841986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3 ML20154D3021986-01-21021 January 1986 Site Survey of Arkansas Nuclear One Unit 2 Maint Program & Practices, Technical Ltr Rept ML20155F9141985-10-31031 October 1985 Addendum a to First Internal Inservice Insp Program, Arkansas Nuclear Power Plant,Unit 1 Technical Evaluation Rept ML20138N9261985-10-31031 October 1985 Audit Rept of Dcrdr for Arkansas Nuclear One,Unit 1, for Oct 1985 ML20140C7801985-10-31031 October 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Arkansas Nuclear Power Plant Unit 1 ML20210A5811985-10-30030 October 1985 Review of Licensee & Applicant Responses to Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2,Arkansas Nuclear One, Units 1 & 2..., Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20211L0471985-08-31031 August 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20112E0811985-03-31031 March 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20116B3661985-02-28028 February 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2 ML20106A6631984-09-24024 September 1984 Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2 ML20083M3101984-04-0202 April 1984 Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation Rept ML20087J8841984-02-29029 February 1984 Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability Analysis ML20082S7671983-10-0707 October 1983 Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1 ML20087L9141983-09-30030 September 1983 Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2 ML20087L9201983-09-30030 September 1983 Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2 ML20087L9111983-08-31031 August 1983 Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1 ML20024B9571983-07-31031 July 1983 Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. ML20077B8541983-07-20020 July 1983 Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept ML20024C8521983-06-30030 June 1983 the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power Plant ML20024E5151983-03-24024 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2 ML20079P5731983-03-21021 March 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept ML20076C3641982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065F2951982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation Rept ML20092J9021982-09-24024 September 1982 Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater Sys 1999-03-31
[Table view] |
Text
EGG-EA-5194 June 1980 ELECTRICAL, INSTRUMENTATION AND CONTROL ASPECTS OF THE LOW TEMPERATURE OVERPRESSURE MITIGATING SYSTEM,
-
ARKANSAS NUCLEAR ONE - UNIT 1, DOCKET NO. 50-313, TAC NO. 6806 D. A. Weber U.S. Department of Energy Idaho Operations Office
- Idaho National Engineering Laboratoly va; - - y .
c '
't N! ..
!
- - , .
- -
N
..
. ... a f .. . [ .1 iW N, % m h[p- '.'yY.34,*,t
^
_ r . ._: , . . iaurasur,,seswy, m meses,,,,,,
,
'
'
-- mumus'amuur 15Sh y QQjgQ,:a,
>
3 ,pa ~
,
,glf5:;-c- w M:m q ,.,,,,,,.QiY
..
--
_fy , .-
"
w .- -~;"
.k "i . .Y' '
,
E::. - ,' '
fe=w 4. :. =amme, fy ;,,s
.e ; -t
,
,. ..
.
This is an informal report intended for use as a preliminary or working document
.
' '
' - . ,m n r '-
- f. Qff
~
'i Prepared for the ' -
U.S. Nuclear Regulatory Conunission Under DOE Contract No. DE-AC07-761D01570 FIN No. A6256 g
b b E b ldaho 80 0 725 0 /F(o
_
pREGnG... . ~
soauscao we (Rav 1179)
INTERIM REPORT Accession No.
-
Report No. EGG-EA-5194
~
C:ntract Program or Project
Title:
Electrical, Instrumentation and Control System Support Subject of this Document:
Electrical, Instrumentation and Control Aspects of the Low Temperature Overprescure Mitigating System, Arkansas Nuclear One - Unit 1, Docket No. 50-313, TAC No. 6806 Type of Document:
Informal Report Author (s):
D. A. Weber
, D te of Document:
June 1980
..
RIsponsible NRC Individual and NRC Office or Division:
Paul C. Shemanski, Division of Eacensing This document was prepared primarily for preliminary or internal use. It has not received full review and approval. Since there may be substantive changes, this document should not be considered final.
EG&G Idaho, Inc.
Idaho Falls, Idaho 83415
"
Prepared for the U.S. Nuclear Regulatory Commission Washington, D.C.
-
Under DOE Contract No. DE-AC07-761D01570 NRC FIN No. A6256 INTERIM REPORT NRC Resmrch i Tnmical Assistarc FVTt
__ _
1814F
, -
.
i TECHNICAL EVALUATION ELECTRICAL, INSTRUMENTATION, AND CONTROL ASPECTS OF THE LOW TEMPERATURE OVERPRESSURE MITIGATING SYSTEM ARKANSAS NUCLEAR ONE--UNIT 1 (Docket No. 50-313)
TAC 6806
.
D. A. Weber Reliability and Statistics Branch
'
Engineering Analysis Division EC&G Idaho, Inc.
.
O
$
_ . _ _
y _ _ _ . .
. .
CONTENTS
- 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . I
- 2. DESIGN BASIS EVENTS (DBE) . . . . . . . . . . . . . . . . . . . . . 2 ,
- 3. OVERPRESSURE PROTECTION . . . . . . . . . . . . . . . . . . . . . . 2
.
3.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . 2 3.1.1 Operator Action . . . . . . . . . . . . . . . . . . . . 2 3.1.2 Overpressure Mitigating System (OMS) . . . . . . . . . . 3 3.1.3 Transient Indications and Alarms . . . . . . . . . . . . 3 3.1.4 Procedural Precautions . . . . . . . . . . . . . . . . . 3 3.2 Proposed HPI OMS Addition . . . . . . . . . . . . . . . . . . . 4
- 4. EVALUATION OF THE EXISTING AND PROPOSED OMS . . . . . . . . . . . . 5
- 5. REC 0KKENDATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . 8 I
5.1 Technical Specifications . . . . . . . . . . . . . . . . . . . 8 5.2 Existing OMS . . . . . . . . . . . . . . . . . . . . . . . . . 9 5.3 Proposed OMS . . . . . . . . . . . . . . . . . . . . . . . . . 10
.
- 6.
SUMMARY
...... . . . . . . . . . . . . . . . . . . . . . . . . 10
- 7. REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
'
.
O
_ _ __
.
TECHNICAL EVALUATION ELECTRICAL, INSTRUMENTATION, AND CONTROL ASPECTS OF TiiE LOW TEMPERATURE OVERPRESSURE MITIGATING SYSTEM
'
ARKANSAS NUCLEAR ONE--UNIT 1 (Docket No. 50-313)
.
- 1. INTRODUCTION By le tter dated August 11, 1976 ,1 the NRC requested Arkansas Power and Light Cocpany (AP&L) to evaluate the Arkansas Nucleer On e-- Uni t 1 "ove r-pressure protection system designs to determine their susceptibility to overpressurization events," and their ability to mitigate the consequences of these events. It was also requested that operating procedures be examined and administrative controls be implemented to guard against initi-ating overpressure events at temperatures below the Nil Ductility Transi-tion Temperature (NDTT) .
"
By letter dated December 3,1976 , AP&L submitted to the NRC a plant
.
specific analysis. The NRC questioned portions of this analysis in a letter dated December 13, 19764 . In responding, AP&L, in a letter dated March 24, 19775 , revised their analysis and answered the NRC questions.
In a letter dated November 7,1977 ,6the NRC expressed some additional concerns as a result of a preliminary review of the overpressure protection system. AP&L responded to these concerns on May 16, 19787 and proposed some design changes.
The electrical, instrumentation, and control system aspects of the existing AP&L lov temperature overpressure mitigating system (OMS) and the proposed design changes have been reviewed in this report. Section 2 describes the one event which AP&L's analysis indicates would result in an overpressure transient. Section 3 describes the Arkansas Unit 1 overpres-
, sure protection and AP&L's proposed design change. Section 4 provides an evaluation of the existing OMS and the proposed design change as they apply
-
to the staf f requirements. Section 5 lists recommendations as they apply to Technical Specifications, the existing OMS, and the proposed design change.
Section 6 is a summary of this report.
1
-_ -
- 2. DESIGN BASIS EVENTS (DBE)
AP&L has analyzed seven icw temperature overpressure events to deter-mine whether they are applicable to Arkansas Unit 1, 5 -
.
Based on the AP&L analysis, erroneous actuation of the high pressure injection (HPI) system, has been identified as the limiting mass addition overpressure transient. Operation of an HPI pump, which is capable of delivering flow against full system operating pressure, is required when-ever a reactor coolant pump is in operation (provides RCS pump seal water).
Since the discharge of an HPI pump is isolated from the reactor coolant system by a single injection valve, a single error or equipment failure could open the injection valve and overt ressurize the reactor coolant system (RCS). If failure of the single low setpoint power-operated relief valve (PORV) is then assumed as the single failure following the event, AP&L's analysis shows that operator action would be required within five minutes to maintain the RCS pressure below Appendix G limits. -
3.
~
OVERPRESSURE PROTECTION
, 3.1 Description 1
,
,
l For the Arkansas Unit 1, overpressure protection consists of operator l action and the Overpresaure Mitigating .rystem (OMS). The Decay Heat Removal I
(DHR) system does not pr' ovide additional relief protection from overpres-sure transients as it is automatically isolated from the Reactor Coolant l Sys tem (RCS) .
[ 3.1.1 Operator Action 1
With a steam or nitrogen bubble in the pressurizer, the operator has about 4.4 minutes in which he can respond to an erroneous HPI. The operator action necessary to prevent overpressurization is to determine the cause of ,
1 the transient and to deenergize or control the responsible equipment before l the RCS pressure reaches the PORV setpoint.
I 2 i
i
- - - -- -
__
1 3.1.2 Overpressure Mitigating System (OMS)
The OMS consists of a single, dual setpoint, power-operated relief
-
valve (PORV) . The valve has a high overpressure setpoint of 2255 psig for reactor operation and a low temperature overpressure setpoint of 550 psig
'
for reactor cooldown and heatup. A manually operated switch under admini-strative control is provided to change the PORV setpoint. AP&L does not provide an enabling alarm to alert the operator tu switch to the lower setpoint when the RCS temperature and pressure are below 500 psig and 280 F, respectively.
AP&L has stated in their letter of March 24, 1977 5 , that the PORV has a steam (or nitrogen) relief capacity greater than the injection rate of two HPI trains, and a liquid relief capacity equal to or greater than the injection rate of one HPI train.
. 3.1.3 Transient Indications and Alarms
- Alarms and indications which give direct indication that a transient is in progress include, three wide-range pressure transmitters (0-2500 psig)
'
used for actuation of the engineered safeguards systems; a pressure . mitter (0-600 psig) on the pressurizer sample line that controls the mur-operated relief valve; two pressurizer level instruments and associated high and high-high level alarms; a letdown storage tank low level alarm; makeup system flowrate indication; and makeup valve position indication.
AP&L provides three acoustic monitors, downstream of the PORV and each of the two pressurizer safety valves, to provide direct indication of the positions of eacn valve. A single alarm is actuated if any of the three monitors detect; flow. The operator then checks the indicators for each valve to deteruine which has lifted.
.
. 3.1.4 Procedural Precautions The staf f position with regard to the inadvertent operation of compo-nents capable of causing a low temperature overpressurization requires the 3
deenergization and either lockout or alarming of unused equipment capabic of causing the overpressurization.
Procedural steps requiring the removal of equipment from operation, '
e.g. , the racking-out of pump and valve circuit breakers, require " hold
.
cards" to be placed on the breaker which are opened, and " sign offs" to indicate satisfactory completion of each step.5 Critical steps performed
'
-
under administrative control are included.
To prevent the erroneous action of an HPI train, circuit breakers for the two normally-closed HPI motor-operated valves are racked-out with the valves closed during plant cooldown and prior to start-up of the DHR system.
This is accomplished by opening, racking out, and tagging the valve circuit breakers at the cotor control center. These circuit breakers are not racked-in again until startup when RCS temperature is above 280 F.5 The operator has indication that power has been removed as the status lights i in the control room will be off. -
i
'
.
! 3.2 Proposed HPI OMS Addition With the initial RCS conditions at NDTT and a pressure of 250 psig, the analysis has determined the time required for a pressure transient to each 550 psig (required relief setting) after initiation varies between 4.4 and 53 minutes, depending on the transient source. Only a pressure transient caused by the actuation of an HPI train will reach the vessel overpressure -
point of 550 psig in less than ten minutes. Therefore, AP&L has proposed to install additional alarms which will assure proper alignment of the overpressure prote: tion system and the status of the four HPI valve circuit breakers.7
.
Specifically, a circuit will be provided to actuate an alarm if either of two conditions are not satisfied. When the reactor coolant temperature .
falls below a predetermined setpoint (280 F), e signal monitor will close a contact to set up part of the alarm circuitry. With this condition established, the alarm will be actuated if the isolation valve CV-1000 to 4 !
.
the electomatic relief valve PSV-1000 is closed or if the key-operated switch for the lower setpoint on the electomatic relief valve is not enab le d. In addition to the above-requested alarms, AP&L plans to add an
-
alarm on the circuit breaker for the four HPI valves, CV-1219, -1220, -1227, and -1228. A circuit will be provided to actuate an alarm if any of the
'
four HPI valve circuit breakers is not deenergized (locked out) and the reactor coolant temperature has fallen below a predetermined setpoint.
- 4. EVALUATION OF THE EXISTING AND PROPOSED OMS The OMS, present and proposed, as it is designed to resp.nd to transi-ents, is evaluated relative to the staff requirements as follows:
- 1. Requirement Operator Action - No credit can be taken for operator
-
action until ten minutes af ter the operator is aware, through an alarm, that a pressure transient is in
-
progress.
Evaluation The existing dual setpoint PORV OMS, when in service, will relieve all low temperature pressure transients.
However, it is not single failure free. The proposed OMS would not meet this requirement if installed.
The only event which would require operator action in less than ten minutes is an HPI transient. The addi-tion of the proposed alarms would not automatically mitigate an HPI transient in less than ten minutes.
.
Operator action would still be required for this event.
.
!
l 5
_. . .
.
- 2. Requirement Seismic and IEEE 279 Criteria - Ideally, the system should meet Seismic Category I and IEEE 279 criteria.
The basic objective is thet the system should not be
.
vulnerable to a common failure that would both initiate a pressure transient and disable the overpressure miti-gation system.
The original intent of the NRC staf f was that at least two independent automatic low pressure protection chan-nels thould make up the OMS. Each channel should include separate sensors, alarms, power trains, and relief valves. Each channel should have complete elec-trical and physical independence from each other to prevent common mode failures. The OMS should be oper-able upon loss of offsite power. In addition, each OMS .
channel should not be susceptable to seismic events that could cause a transient and fail the channel at ~
the same time.
Evaluation The existing and proposed Arkansas Unit 1 OMS does not comply with the IEEE 279 or Seismic criteria. Regarding the IEEE 279 criteria, the existing and proposed OMS does not provide for a second independent automatic low-pressure protection channel. The addition of the enabling alarm will assure proper alignment of the overpressure protection system. The addition of an alarm to the four HPI valve circuit breakers will assure that the circuit breakers are deenergized when the
"
reactor coolant terperature has fallen below a pre- ,
determined setpoint. Regarding Seismic criteria, AP&L states that detailed stress analyses have been performed for the pilot-actuated relief valve in accordance with 6
. . . __
ASME Section III, Class 1 requirements and have been found adequate for Class 1 applications. However, testing with simulated seismic loadings has not been
.
performed as this was not a requirement at the time the plant was designed and constructed.5
.
- 3. Requirement Singla Failure - The system must be designed to relieve the pressure transient given a single failure in addi-tion to the failure that initiated the pressure trans ien t.
Evaluation The Arkansas Unit 1 OMS does not comply with the single
. failure criteria in that there is only one RCS low temperature overpressure protection channel, i.e.,
~
there is no channel redundancy.
- 4. Requirement Testability - The system shall include provisions for testing on a schedule consistent with the frequency that the system is relied upon for pressure protection.
Evaluation The single existing PORV system is designed to allow testing of the system prior to its use. AP&L is pre-paring Technical Specifications regarding HPI and PORV
- testing and maintenance.7
.
7 1
,.
- 5. RECOMMENDATIONS 5.1 Technical Specificetions
.
It is the staff position that administrative controls shall appear in
'
the Technical Specifications as Limiting Conditions for Operation when administrative controls are used to limit overpressurization scenarios.
Therefore, it is recommended that the licensee be required to submit Tech-nical Specification changes for Arkansas Unit I consistent with the following:
- 1. Any operation or failure of the PORV to operate to relieve pressure transients nust be reported to the NRC.
- 2. The existing OMS and alarms must be operable (in oper-ation) when the RCS temperature is below 280 F. If the OMS design is installed and in operation, then the -
system and its related alarms must be operable when the RCS temperature is below the minimum pressurization -
temperature. If these conditions are not met, the primary system must be depressurized and vented to the atmosphere within eight hours.
- 3. The two motor-operated valves normally aligned to pro-7 vide high pressure injection must be closed and the supplying circuit breakers open, locked out, and tagged when the temperature is below 280 F and the reactor coolant is not vented to the atmosphere.
- 4. The low temperature overpressure protection system and alarm (dual setpoint PORV), and the HPI OMS and alarns
'
must be tested on a periodic basis consistent with the need for its use. A system functional test and a set- ,
point verification test shall be performed prior to enabling the overpressure protection system during cooldown and startup. The system shall be calibrated, 8
.. .
and the PORV and HPI OMS operation tested at re fueling intervals. The HPI valve will be allowed to be cycled only if (a) all HPI pumps are out of service, or vessel
-
4 temperature is above the minimum value for which the vessel can be fully pressurized, or (b) the reactor
~
vessel head is removed.7
'5. When the reactor vessel temperature is below the minimum
- value for which the vessel can be fully pressurized, the PORV may be removed from service for a maximum of two hours only if (a) charging pumps are out of service and all HPI injection valves are closed and power removed, or (b) the vessel head is removed.7 5.2 Existing ONS
> -
With regard to recommendations concerning the existing OMS, the licen-see should:
.
- 1. Submit Technical Specifications to comply with the requirements listed in Section 5.1
- 2. Provide an OMS enabling alarm to comply with the staff position stated in the NRC letters of November 7, 1977 6 j
,
- 3. Identify, in the Technical Specifications, the enabling temperature and PORV setpoint 6
- 4. Propose Technical Specifications related to system testing 6
.
, 5. Provide a method to continuously record RCS pressure and temperature to ensure that a permanent record is available for all low temperature-pressure events 9
l l
- k. J
. - -. .
- 6. Install pressure alarms to give the operator direct indication that a low temperature pressure transient is in progress and that the RCS pressure has exceeded 550 psig -
.
- 7. Examine the maintenance and testing restrictions to assure compatibility with present/ proposed Technical Specifications regarding the operability and periodic testing of ECC and emergency boration system.6
,
5.3 Proposed OMS It is recommended that the following be required of the licensee:
- 1. All alarms, instrumentation, control circuits, and power required by the operator to detect and mitigate HPI overpressure transients should be electrically and -
physically separated from the PORV system (i.e. , meet IEEE 279 criteria) '
- 2. As sure that the new equipment is siesmic qualified and testab*t.
- 6.
SUMMARY
The NRC letter of August 11, 1976, regarding reactor vessel overpres-surization, requested the Arkansas Power and Light Company to evaluate their low temperature overpressure mitigating system for Arkansas Uni t 1 to determine their susceptibility to overpressure events.
The evaluation that AP&L provided indicated that there was one event,
~
a transient caused by the inadvertent operation of the nigh pressure injec-tion system, that would require operator action in less than the ten minutes ,
allowed by the staf f requirement to prevent overpressurization. On March 16,1978, AP&L stated that they would install a circuit which would activate an alarm if any of the four MPI-valve circuit breakers are not 10
deenergized and the reactor coolant tenperature is below a predetermined setpoint.
. The existing and proposed system does not meet the staff requirements regarding operator action for an HPI transient, and the seismic and single
~
failure requirements.
Although the Arkansas Unit 1 does not comply with the original staf f requirements, there are other factors which should be considered. The staf f requirements for an OMS was originated for plants that are operated with the RCS in a water-solid condition during cooldown and startup. With a water-solid condition, a transient can cause an overpressurization of the vessel within seconds of initiation. This step transient makes it impos-s ible for an operator to detect a transient and act in time to prevent overpressurization. The B&W-designed plant never operate with a water-solid condition. A steam or nitrogen bubble is maintained in the reactor pres-
. surizer at all times, which does not allow step transients to occur.
Iastead, transients occur as a ramp function with the HPI transient reaching
~
the overpressurization point 4.4 minutes or more af ter initiation and all others requiring over ten minutes. This delay allows the operator time to detect the transient and take action to prevent the RCS pressure from reaching the PORV relief point. There has been only one low temperature overpressurization at the B R-designed plants.
- 7. REFERENCES
- 1. R. W. Reid, NRC letter to AP&L, Re: " Reactor Vessel Overpressurization in Pressurized Water Reactor Facilities," August 11, 1976.
- 2. D. A. Rueter, " Reactor Vessel Overpressurization," November 15, 1976.
- 3. J. D. Phillips, " Reactor Vessel Overpressurization--B&W Generic Analy-
,
sis," December 3,1976.
- 4. R. W. Reid, NRC letter to AP&L, Re: " Additional Information to Evalu-ate Overpressure Mitigating System," December 13, 1976.
11
.
- 5. D. A. Ruete r, " Evaluation of Potential Vessel Overpressurization,"
March 24, 1977.
- 6. R. W. Re id , NRC le tter to AP&L, Re: "RCS Overpressurization,"
.
- 7. D.11. Williams, " Reactor Vessel Overpressurization--Response to NRC Positions," May 16, 1978.
.
e
.
e J