Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20206F072 | 31 March 1999 | Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference High Energy Line Break Intergranular Stress Corrosion Cracking Water hammer |
ML20154K301 | 30 June 1998 | Technical Evaluation Rept, Third Ten-Year Interval Pump & Valve Inservice Testing Program, for Arkansas Nuclear One, Unit 1,Entergy Operations,Inc | Hot Short Safe Shutdown Boric Acid Incorporated by reference Thermography |
ML20138G522 | 25 October 1996 | Technical Evaluation Rept of IPE Submittal & RAI Responses for Plant,Unit 1 Npp | Mission time Internal Flooding Probabilistic Risk Assessment Severe Accident Management Guideline |
ML20138K062 | 30 November 1995 | TER on IPE Submittal Human Reliability Analysis, Final Rept | Internal Flooding |
ML20138F092 | 30 November 1995 | TER on IPE Back End Analysis | Mission time Probabilistic Risk Assessment |
ML20138F081 | 27 November 1995 | TER on IPE Front End Analysis | Mission time Internal Flooding Probabilistic Risk Assessment |
L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 | 30 September 1995 | Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 | Boric Acid Offsite Dose Calculation Manual |
ML20080B493 | 30 November 1994 | Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994 | |
ML20116A474 | 30 September 1992 | Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power Plant | Packing leak Probabilistic Risk Assessment Overspeed trip |
ML20127E329 | 30 September 1992 | TER Pump & Valve IST Program Ano,Unit 2 | Stroke time Cold shutdown justification Backfit |
ML20118A011 | 31 March 1992 | TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1 | Stroke time Power Operated Valves |
ML20072R961 | 31 March 1991 | TER Review of ANO-1 CST Seismic Design | Earthquake |
ML20154H545 | 31 August 1988 | Evaluation of Risks Associated with AOT and STI Requirements at the ANO-1 Nuclear Power Plant | |
ML20153D432 | 31 March 1988 | User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 1,Program for Inspectors | |
ML20153D495 | 31 March 1988 | User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 2,Program for Regulators | |
ML20150F344 | 31 March 1988 | PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company) | Probabilistic Risk Assessment Emergency Lighting |
ML20236D918 | 31 July 1987 | Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs | Probabilistic Risk Assessment Earthquake Loss of condenser vacuum |
ML20214R743 | 31 March 1987 | Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 | |
ML20210Q448 | 9 January 1987 | Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept | |
ML20214L287 | 25 August 1986 | Evaluation of Arkansas Power & Light Co Dcrdr of Arkansas Nuclear One - Unit 1 Plant, Technical Evaluation Rept | |
ML20214L988 | 25 August 1986 | Evaluation of Dcrdr for Arkansas Power & Light Co Arkansas Nuclear One,Unit 2, Technical Evaluation Rept | |
ML20212M276 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 | |
ML20210K684 | 30 April 1986 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3 | |
ML20154D302 | 21 January 1986 | Site Survey of Arkansas Nuclear One Unit 2 Maint Program & Practices, Technical Ltr Rept | Systematic Assessment of Licensee Performance |
ML20155F914 | 31 October 1985 | Addendum a to First Internal Inservice Insp Program, Arkansas Nuclear Power Plant,Unit 1 Technical Evaluation Rept | VT-2 Liquid penetrant |
ML20140C780 | 31 October 1985 | Technical Evaluation Rept,Second Interval Inservice Insp Program,Arkansas Nuclear Power Plant Unit 1 | Hydrostatic VT-2 Dissimilar Metal Weld |
ML20138N926 | 31 October 1985 | Audit Rept of Dcrdr for Arkansas Nuclear One,Unit 1, for Oct 1985 | Loss of condenser vacuum |
ML20210A581 | 30 October 1985 | Review of Licensee & Applicant Responses to Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2,Arkansas Nuclear One, Units 1 & 2..., Technical Evaluation Rept | |
ML20211L047 | 31 August 1985 | Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 | |
ML20137S257 | 31 August 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 | |
ML20209F815 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 | |
ML20112E081 | 31 March 1985 | Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 | Boric Acid |
ML20116B366 | 28 February 1985 | Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2 | |
ML20106A663 | 24 September 1984 | Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2 | Safe Shutdown Non-Destructive Examination Control of Heavy Loads |
ML20083M310 | 2 April 1984 | Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation Rept | Safe Shutdown Design basis earthquake Earthquake Control of Heavy Loads |
ML20087J884 | 29 February 1984 | Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability Analysis | Earthquake |
ML20082S767 | 7 October 1983 | Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1 | |
ML20087L920 | 30 September 1983 | Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2 | |
ML20087L914 | 30 September 1983 | Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2 | |
ML20087L911 | 31 August 1983 | Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1 | |
ML20024B957 | 31 July 1983 | Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. | |
ML20077B854 | 20 July 1983 | Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept | |
ML20024C852 | 30 June 1983 | the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power Plant | Probabilistic Risk Assessment |
ML20024E515 | 24 March 1983 | Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2 | Boric Acid High Energy Line Break |
ML20079P573 | 21 March 1983 | ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept | |
ML20076C364 | 24 November 1982 | ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept | |
ML20127A289 | 5 October 1982 | Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 | |
ML20065F295 | 28 September 1982 | PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation Rept | Boric Acid Shutdown Margin |
ML20092J902 | 24 September 1982 | Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater Sys | Backfit |
ML20064M278 | 31 August 1982 | Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company) |