Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20206F07231 March 1999Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1Boric Acid
Nondestructive Examination
VT-2
Incorporated by reference
ML20154K30130 June 1998Technical Evaluation Rept, Third Ten-Year Interval Pump & Valve Inservice Testing Program, for Arkansas Nuclear One, Unit 1,Entergy Operations,IncHot Short
Safe Shutdown
Boric Acid
Incorporated by reference
ML20138G52225 October 1996Technical Evaluation Rept of IPE Submittal & RAI Responses for Plant,Unit 1 NppMission time
Internal Flooding
Probabilistic Risk Assessment
Severe Accident Management Guideline
ML20138K06230 November 1995TER on IPE Submittal Human Reliability Analysis, Final ReptInternal Flooding
ML20138F09230 November 1995TER on IPE Back End AnalysisMission time
Probabilistic Risk Assessment
ML20138F08127 November 1995TER on IPE Front End AnalysisMission time
Internal Flooding
Probabilistic Risk Assessment
L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 230 September 1995Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2Boric Acid
Offsite Dose Calculation Manual
ML20080B49330 November 1994Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994
ML20116A47430 September 1992Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power PlantPacking leak
Probabilistic Risk Assessment
ML20127E32930 September 1992TER Pump & Valve IST Program Ano,Unit 2Stroke time
Cold shutdown justification
Backfit
ML20118A01131 March 1992TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1Stroke time
Power Operated Valves
ML20072R96131 March 1991TER Review of ANO-1 CST Seismic DesignEarthquake
ML20154H54531 August 1988Evaluation of Risks Associated with AOT and STI Requirements at the ANO-1 Nuclear Power Plant
ML20153D43231 March 1988User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 1,Program for Inspectors
ML20153D49531 March 1988User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 2,Program for Regulators
ML20150F34431 March 1988PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company)Probabilistic Risk Assessment
Emergency Lighting
ML20236D91831 July 1987Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAsProbabilistic Risk Assessment
Earthquake
ML20214R74331 March 1987Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3
ML20210Q4489 January 1987Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept
ML20214L28725 August 1986Evaluation of Arkansas Power & Light Co Dcrdr of Arkansas Nuclear One - Unit 1 Plant, Technical Evaluation Rept
ML20214L98825 August 1986Evaluation of Dcrdr for Arkansas Power & Light Co Arkansas Nuclear One,Unit 2, Technical Evaluation Rept
ML20212M27631 July 1986Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1
ML20210K68430 April 1986Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3
ML20154D30221 January 1986Site Survey of Arkansas Nuclear One Unit 2 Maint Program & Practices, Technical Ltr ReptSystematic Assessment of Licensee Performance
ML20155F91431 October 1985Addendum a to First Internal Inservice Insp Program, Arkansas Nuclear Power Plant,Unit 1 Technical Evaluation ReptVT-2
Liquid penetrant
ML20140C78031 October 1985Technical Evaluation Rept,Second Interval Inservice Insp Program,Arkansas Nuclear Power Plant Unit 1Hydrostatic
VT-2
Dissimilar Metal Weld
ML20138N92631 October 1985Audit Rept of Dcrdr for Arkansas Nuclear One,Unit 1, for Oct 1985
ML20210A58130 October 1985Review of Licensee & Applicant Responses to Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2,Arkansas Nuclear One, Units 1 & 2..., Technical Evaluation Rept
ML20211L04731 August 1985Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1
ML20137S25731 August 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1
ML20209F81530 June 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1
ML20112E08131 March 1985Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1Boric Acid
ML20116B36628 February 1985Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2
ML20106A66324 September 1984Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2Safe Shutdown
Non-Destructive Examination
Control of Heavy Loads
ML20083M3102 April 1984Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation ReptSafe Shutdown
Design basis earthquake
Earthquake
Control of Heavy Loads
ML20087J88429 February 1984Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability AnalysisEarthquake
ML20082S7677 October 1983Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1
ML20087L92030 September 1983Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2
ML20087L91430 September 1983Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2
ML20087L91131 August 1983Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1
ML20024B95731 July 1983Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant.
ML20077B85420 July 1983Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept
ML20024C85230 June 1983the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power PlantProbabilistic Risk Assessment
ML20024E51524 March 1983Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2Boric Acid
ML20079P57321 March 1983ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept
ML20076C36424 November 1982ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept
ML20127A2895 October 1982Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982
ML20065F29528 September 1982PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation ReptBoric Acid
Shutdown Margin
ML20092J90224 September 1982Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater SysBackfit
ML20064M27831 August 1982Interim Reliability Evaluation Program:Analysis of the Arkansas Nuclear ONE-UNIT 1 Nuclear Power Plant.Docket No. 50-313.(Arkansas Power and Light Company)