Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20024B957 | 31 July 1983 | Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. | |
ML20062M044 | 31 July 1982 | Technical Evaluation Rept of Overpressure Protection Sys for AR Nuclear One,Unit 1, Informal Rept | Hydrostatic Earthquake |
ML20050A294 | 28 February 1982 | Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept | |
ML20041D216 | 31 January 1982 | Tech Specs for Redundant Decay Heat Removal Capability, AR Nuclear One,Unit 1, Technical Evaluation Rept | |
ML20039G369 | 30 November 1981 | Tech Specs for Redundant Decay Heat Removal Capability,Ar Nuclear One,Unit 2. | |
ML20003F119 | 31 March 1981 | Tech Spec Change for AR Nuclear One - Unit 2, Technical Evaluation Rept | |
ML19247E204 | 28 February 1981 | Technical Evaluation Rept,Tech Specs Change for AR Nuclear One,Unit 2,Docket 50-368, Preliminary Rept | |
ML19326D922 | 30 June 1980 | Electrical,Instrumentation & Control Aspects of Low Temp Overpressure Mitigation Sys,Ar Nuclear One,Unit 1. | |
ML17318A736 | 31 March 1980 | Electrical,Instrumentation & Control Aspects of Override of Containment Purge Valve Isolation & Other Safety Feature Signals, Informal Interim Rept.Prepared for DOE | |
ML19270F410 | 31 December 1978 | Recommendations to NRC on Inservice Testing Program. | Stroke time Power-Operated Valves |