Category:NOTIFICATION OF CONTRACT EXECUTION
MONTHYEARML20059L5301990-09-21021 September 1990 Notification of Contract Execution,Mod 1,Task Order 8,to Nuclear Power Reactor Operations,Mods & Maint Insp Svcs. Contractor:Parameter,Inc 1990-09-21
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20206F0721999-03-31031 March 1999 Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1 ML20154K3011998-06-30030 June 1998 Technical Evaluation Rept, Third Ten-Year Interval Pump & Valve Inservice Testing Program, for Arkansas Nuclear One, Unit 1,Entergy Operations,Inc ML20138G5221996-10-25025 October 1996 Technical Evaluation Rept of IPE Submittal & RAI Responses for Plant,Unit 1 Npp ML20138K0621995-11-30030 November 1995 TER on IPE Submittal Human Reliability Analysis, Final Rept ML20138F0921995-11-30030 November 1995 TER on IPE Back End Analysis ML20138F0811995-11-27027 November 1995 TER on IPE Front End Analysis L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 21995-09-30030 September 1995 Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 ML20080B4931994-11-30030 November 1994 Evaluation of Utility Response to Suppl 1 to NRC Bulletin 90-01:Arkansas Nuclear One-1/-2, Dtd Nov 1994 ML20116A4741992-09-30030 September 1992 Emergency Feedwater System RISK-BASED Inspection Guide for the Arkansas Nuclear One Unit 2 Power Plant ML20127E3291992-09-30030 September 1992 TER Pump & Valve IST Program Ano,Unit 2 ML20118A0111992-03-31031 March 1992 TER Pump & Valve Inservice Testing Program Arkansas Nuclear One,Unit 1 ML20072R9611991-03-31031 March 1991 TER Review of ANO-1 CST Seismic Design ML20059L5301990-09-21021 September 1990 Notification of Contract Execution,Mod 1,Task Order 8,to Nuclear Power Reactor Operations,Mods & Maint Insp Svcs. Contractor:Parameter,Inc ML20154H5451988-08-31031 August 1988 Evaluation of Risks Associated with AOT and STI Requirements at the ANO-1 Nuclear Power Plant ML20153D4321988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 1,Program for Inspectors ML20153D4951988-03-31031 March 1988 User'S Guide for Prisim Arkansas Nuclear One - Unit 1.Volume 2,Program for Regulators ML20150F3441988-03-31031 March 1988 PRA Applications Program for Inspection at Arkansas Nuclear One Unit 1.Docket No. 50-313.(Arkansas Power and Light Company) ML20236D9181987-07-31031 July 1987 Methodology and Application of Surrogate Plant PRA Analysis to the Rancho Seco Power Plant.Task 1 - Analysis of ANO-1 and Oconee PRAs ML20214R7431987-03-31031 March 1987 Rev 1 to Conformance to Item 4.5.2 of Generic Ltr 83-28, Arkansas Nuclear One-2,Calvert Cliffs 1 & 2,Fort Calhoun, Main Yankee,Millstone 2,Palisades,Palo Verde 1,2 & 3,San Onofre 2 & 3,St Lucie 1 & 2,Waterford 3 & WNP 3 ML20210Q4481987-01-0909 January 1987 Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Arkansas Nuclear One Unit 2,Calvert Cliffs Units 1 & 2,Fort Calhoun,Maine Yankee,Millstone Unit 2, Palisades,Palo Verde Units..., Technical Evaluation Rept ML20214L9881986-08-25025 August 1986 Evaluation of Dcrdr for Arkansas Power & Light Co Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20214L2871986-08-25025 August 1986 Evaluation of Arkansas Power & Light Co Dcrdr of Arkansas Nuclear One - Unit 1 Plant, Technical Evaluation Rept ML20212M2761986-07-31031 July 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Arkansas 1 & 2,Calvert Cliffs 1 & 2,Crystal River 3 & Davis-Besse 1 ML20210K6841986-04-30030 April 1986 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas Nuclear One 2,Calvert Cliffs 1 & 2,Palo Verde 1,2 & 3 & San Onofre 2 & 3 ML20154D3021986-01-21021 January 1986 Site Survey of Arkansas Nuclear One Unit 2 Maint Program & Practices, Technical Ltr Rept ML20155F9141985-10-31031 October 1985 Addendum a to First Internal Inservice Insp Program, Arkansas Nuclear Power Plant,Unit 1 Technical Evaluation Rept ML20138N9261985-10-31031 October 1985 Audit Rept of Dcrdr for Arkansas Nuclear One,Unit 1, for Oct 1985 ML20140C7801985-10-31031 October 1985 Technical Evaluation Rept,Second Interval Inservice Insp Program,Arkansas Nuclear Power Plant Unit 1 ML20210A5811985-10-30030 October 1985 Review of Licensee & Applicant Responses to Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2,Arkansas Nuclear One, Units 1 & 2..., Technical Evaluation Rept ML20137S2571985-08-31031 August 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20211L0471985-08-31031 August 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20209F8151985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Arkansas 1,Crystal River 3,Oconee 1,2 & 3,Rancho Seco & TMI-1 ML20112E0811985-03-31031 March 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 ML20116B3661985-02-28028 February 1985 Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 2 ML20106A6631984-09-24024 September 1984 Technical Evaluation Rept,Control of Heavy Loads, Arkansas Nuclear One Units 1 & 2 ML20083M3101984-04-0202 April 1984 Control of Heavy Loads - Phase Ii,Arkansas Nuclear One, Units 1 & 2, Draft Technical Evaluation Rept ML20087J8841984-02-29029 February 1984 Review of the Arkansas Nuclear One Generating Station Unit NO.1 Emergency Feedwater System Reliability Analysis ML20082S7671983-10-0707 October 1983 Technical Evaluation Rept on Tests Conducted to Verify Analyses Performed on Adequacy of Station Electric Distribution Sys Voltages for Arkansas Nuclear One,Unit 1 ML20087L9141983-09-30030 September 1983 Analysis of 800624 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 2 ML20087L9201983-09-30030 September 1983 Analysis of 800129 Turbine Trip at Arkansas Nuclear One Unit 2 ML20087L9111983-08-31031 August 1983 Analysis of 800407 Loss of Offsite Power Transient at Arkansas Nuclear One Unit 1 ML20024B9571983-07-31031 July 1983 Draft DHR During Total Loss of Feedwater Event for C-E Sys 80 Plant. ML20077B8541983-07-20020 July 1983 Operating Reactor PORV Repts (F-37) TMI Action Plan Requirements:Generic Rept - B&W Designed Units, Technical Evaluation Rept ML20024C8521983-06-30030 June 1983 the Effect of Some Operations and Control Room Improvements on the Safety of the Arkansas Nuclear One,Unit One,Nuclear Power Plant ML20024E5151983-03-24024 March 1983 Review of Licensee Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11 & B-60), Arkansas Nuclear One Unit 2, Vols 1 & 2 ML20079P5731983-03-21021 March 1983 ECCS Repts (F-47) TMI Action Plan Requirements,Ar Nuclear One Unit 1, Technical Evaluation Rept ML20076C3641982-11-24024 November 1982 ECCS Repts (F-47),TMI Action Plan Requirements,Arkansas Nuclear One,Unit 2, Technical Evaluation Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20065F2951982-09-28028 September 1982 PWR Main Steam Line Break W/Continued Feedwater Addition (B-69),AR Nuclear One,Unit 1, Technical Evaluation Rept ML20092J9021982-09-24024 September 1982 Technical Evaluation Rept,Arkansas Nuclear One,Unit 2, Seismic Qualification of Auxiliary Feedwater Sys 1999-03-31
[Table view] |