Category:Enforcement Action
MONTHYEARIR 05000410/20100082010-12-28028 December 2010 NMP NRC Investigation Report 1-2010-033 and NRC IR 05000410-10-008 IR 05000220/20060112007-03-13013 March 2007 EA-07-007, Nine Mile Point - Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000220/2006011; 05000410/2006-011) ML0704402312007-02-13013 February 2007 IR 05000220-06-011, 05000410-06-011; 10/16/06 - 1/09/07; Nine Mile Point, Units 1 and 2; Licensed Operator Requalification Program, Inspection Procedure Attachment 71111.11 ML0523002652005-08-18018 August 2005 EA-05-025, Nine Mile Point Nuclear Station, Notice of Violation NRC Office of Investigations Report No. 1-2004-005 2010-12-28
[Table view] Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds NMP2L2880, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 2024-09-04
[Table view] Category:Notice of Violation
MONTHYEARIR 05000220/20150082015-04-10010 April 2015 Notice of Violation - Severity Level III Problem - NRC IR 05000220/2015008 and 05000410/2015008 IR 05000317/20120082012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO ML12213A1822012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group Memo IR 05000220/20120082012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO IR 05000244/20120072012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO IR 05000220/20100092011-03-24024 March 2011 IR 05000220-10-009 and Investigation Report 1-2010-026 ML0907608932009-03-16016 March 2009 Notice of Violation - NRC Investigation Report No. 1-2008-018 IR 05000220/20060112007-03-13013 March 2007 EA-07-007, Nine Mile Point - Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000220/2006011; 05000410/2006-011) ML0532001892005-11-16016 November 2005 IA-05-062, Restani, Notice of Violation and Expiration of License ML0523003592005-08-18018 August 2005 IA-05-007, Notice of Violation and Confirmatory Order (Effective Immediately) (NRC Office of Investigations Report No. 1-2004-005) ML0523002652005-08-18018 August 2005 EA-05-025, Nine Mile Point Nuclear Station, Notice of Violation NRC Office of Investigations Report No. 1-2004-005 IR 05000220/20030032003-05-23023 May 2003 EA-03-053, Nine Mile Point, Notice of Violation and White Finding for IR 05000220-03-003 ML18018B0742000-03-27027 March 2000 ADAMS Distribution Notification ML18018B0771997-12-29029 December 1997 Letter Replying to Notice of Violation as Contained in NRC Inspection Report 50-220/97-07 and 50-410/97-07 ML18018B0781997-10-15015 October 1997 Letter Replying to Notice of Violation Contained in NRC Inspection Report 97-06, Dated September 15, 1997 ML18018B0921991-01-0202 January 1991 Letter Enclosing a Response to the Notice of Violation Contained in Inspection Report 50-410/90-09 Dated December 4, 1990 2015-04-10
[Table view] |
Text
August 18, 2005 EA-05-025 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
SUBJECT:
NOTICE OF VIOLATION NRC Office of Investigations Report No. 1-2004-005 (Nine Mile Point Nuclear Station)
Dear Mr. Spina:
Following the receipt of information in January 2004, the NRC's Office of Investigations (OI),
Region I, initiated an investigation on February 3, 2004, to determine whether employees of Nine Mile Point Nuclear Station (Nine Mile Point) deliberately violated conditions of the Nine Mile Point Unit 2 license by compromising an unannounced fire drill in June 2000. Based on the evidence developed during its investigation, OI substantiated that a Fire Protection Supervisor deliberately violated conditions of the Unit 2 license by compromising an unannounced fire drill in June 2000. The basis for OIs conclusion was previously provided to you in a factual summary of the OI investigation enclosed with our letter dated March 18, 2005.
In a letter dated July 13, 2005, you provided an unsolicited response to our March 18, 2005, letter in order to describe actions that Nine Mile Point has taken, and plans to take, in response to the OI finding.
The actions of the former fire protection supervisor were contrary to 10 CFR Part 50, Appendix R, which requires persons planning and authorizing an unannounced fire drill to ensure that the responding shift fire brigade members are not aware that a fire drill is being planned until it is begun. This failure to meet a regulatory requirement had more than minor significance because virtually the full details of the fire drill were compromised. In accordance with the NRC Enforcement Policy, Supplement I - Reactor Operations, Example D.3, the NRC has categorized the violation at Severity Level IV because it was a failure to meet a regulatory requirement that had more than minor safety significance.
Given the deliberate nature of this violation by a first line supervisor, the NRC considered exercising discretion to increase the severity level of the violation in accordance with the NRC Enforcement Policy,Section IV.A.4. However, the NRC decided that Severity Level IV was the appropriate classification in this case based on the following factors: (1) the safety consequence of the misconduct was limited since the fire drill was never conducted and, therefore, never counted as an unannounced fire drill; (2) there were no other supervisors involved in this incident; (3) the compromise appeared to be an isolated incident; and (4) the former fire protection supervisor accepted responsibility for his actions. The NRC also considered whether a non-cited violation was appropriate in this case. However, issuance of a
Mr. James A. Spina 2 non-cited violation was not appropriate because the violation was willful, identified by the NRC, and involved the actions of a first line supervisor.
The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket as summarized in your letter dated July 13, 2005. Therefore, you are not required to respond unless these documents do not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice of Violation.
As another option, you may request alternative dispute resolution (ADR) with the NRC in an attempt to resolve this issue if you disagree with this enforcement sanction. ADR is a general term encompassing various techniques for resolving conflict outside of court using a neutral third party. The technique that the NRC has decided to employ during a pilot program, which is now in effect, is mediation. Additional information concerning the NRC's pilot program is described in the enclosed brochure (NUREG/BR-0317) and can be obtained at http://www.nrc.
gov/what-we-do/regulatory/enforcement/adr.html. The Institute on Conflict Resolution (ICR) at Cornell University has agreed to administer the NRC's program. Please contact ICR at 877-733-9415 within 10 days of the date of this letter if you are interested in pursuing resolution of this issue through ADR.
You should note that final NRC documents, including the final OI report, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information pursuant to the FOIA. Requests under the FOIA should be made in accordance with 10 CFR 9.23, Requests for Records.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/
adams.html (the Public Electronic Reading Room). Should you have any questions regarding this letter, please feel free to contact Mr. James Trapp at (610) 337-5186.
Sincerely,
/RA/
Brian E. Holian, Director Division of Reactor Projects Docket No. 50-410 License No. NPF-69
Enclosure:
Notice of Violation
Mr. James A. Spina 3 cc w/encl:
M. J. Wallace, President, Constellation Generation M. Heffley, Senior Vice President and Chief Nuclear Officer J. M. Petro, Jr., Esquire, Counsel, Constellation Energy Group, Inc.
M. J. Wetterhahn, Esquire, Winston and Strawn P. R. Smith, President, New York State Energy, Research, and Development Authority J. Spath, Program Director, New York State Energy Research and Development Authority P. D. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Supervisor, Town of Scriba T. Judson, Central NY Citizens Awareness Network D. Katz, Citizens Awareness Network J. R. Evans, LIPA C. Adrienne Rhodes, Chairman and Executive Director, State Consumer Protection Board
Mr. James A. Spina 4 DISTRIBUTION w/encl:
ADAMS (PARS)
SECY CA OEMAIL OEWEB LReyes, EDO EMerschoff, DEDR SFigueroa, OE LTrocine, OE LChandler, OGC BJones, OGC MElwood, OGC KRemsberg, OGC PLohaus, STP JDyer, NRR RBorchardt, NRR BBoger, NRR SLee, OEDO PBonnett, NRR RLaufer, NRR PTam, PM, NRR TColburn (Back up PM), NRR Enforcement Coordinators RII, RIII, RIV SGagner, OPA HBell, OIG GCaputo, OI LTremper, OC SCollins, RA MDapas, DRA JTrapp, DRP DScrenci, PAO-RI GHunegs, SRI Region I OE Files (with concurrences)
Region I Docket Room (with concurrences)
SISP Review Complete: JMT (Reviewers Initials)
DOCUMENT NAME: E:\Filenet\ML052300265.wpd After declaring this document An Official Agency Record it will be released to the Public.
- Refer to previous concurrences To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/ORA RI/ORA RI/DRP RI/DRP RI/OI NAME RUrban DHolody JTrapp BHolian EWilson JAT for DATE 07/27/05 07/29/05 07/28/05 07/28/05 07/28/05 OFFICE RI/ORA OE OGC HQ/NRR RI/RA NAME KFarrar JLuehman (RJU for) TSmith (RJU for) BBoger (RJU for) SCollins DATE 07/28/05 08/05/05 08/03/05 (NLO) 08/03/05 08/02/05 OFFICIAL RECORD COPY
Enclosure Notice of Violation Nine Mile Point Nuclear Station, LLC Docket No. 50-410 Nine Mile Point Unit 2 License No. NPF-69 EA 05-025 During an NRC investigation completed on January 3, 2005, a violation of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:
Until February 2001, Nine Mile Point Unit 2 Technical Specification 6.4, Training, required that the training program for the fire brigade shall meet or exceed the requirements of Appendix R to 10 CFR Part 50.
10 CFR Part 50, Appendix R, Section III.I.3.b, requires, in part, that persons planning and authorizing an unannounced fire drill shall ensure that the responding shift fire brigade members are not aware that a fire drill is being planned until it is begun.
Contrary to the above, on June 14, 2000, an unannounced fire drill was planned, and prior to its start, the fire protection supervisor made a responding shift fire brigade member (the fire brigade leader) aware of not only the fact that an unannounced fire drill was planned but also the time and location of the planned, unannounced, fire drill.
This is a Severity Level IV violation (Supplement I).
The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket in your letter dated July 13, 2005. However, you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to respond, clearly mark your response as a "Reply to a Notice of Violation; EA-05-025," and send it to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice within 30 days of the date of the letter transmitting this Notice of Violation (Notice).
If you contest this enforcement action, you should also provide a copy of your response, with the basis for your denial, to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
Because your response, if provided, will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. ADAMS is accessible from the NRC Web site at http://www.
nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a
Notice of Violation 2 redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.390(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
In accordance with 10 CFR 19.11, you may be required to post this Notice within 2 working days.
Dated this 18th day of August 2005