OL - TVA Letter to NRC_02-01-2012_I&C RAI Response
ML12045A030
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12045A030 (6)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Thursday, February 02, 2012 10:08 AM To: Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc: Arent, Gordon; Hamill, Carol L; Boyd, Desiree L

Subject:

TVA letter to NRC_02-01-2012_I&C RAI Response Attachments: 02-01-2012_I&C RAI Response_Final.pdf Please see attached TVA letter that was sent to the NRC today.

For those of you who receive a cc in the mail, the enclosures will be included with your letter.

Thank You,

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 651 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF2861FE50)

Subject:

TVA letter to NRC_02-01-2012_I&C RAI Response Sent Date: 2/2/2012 10:08:10 AM Received Date: 2/2/2012 10:08:38 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Hamill, Carol L" <clhamill@tva.gov>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 379 2/2/2012 10:08:38 AM 02-01-2012_I&C RAI Response_Final.pdf 110215 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received:

Enclosure 1 is to be withheld from public disclosure under 10 CFR § 2.390.

When separated from this enclosure, this letter is decontrolled.

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 February 1, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 10 CFR 50.4 NRC Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 - INSTRUMENTATION AND CONTROLS STAFF INFORMATION REQUESTS The purpose of this letter is to provide documents that TVA has committed to provide in response to NRCs information requests received during a teleconfernce held on December 8, 2011, between NRC, TVA and Westinghouse Electric Company to discuss the WBN Unit 2 incore instrumentation system. Specifically, TVA made the following commitment:

TVA Commitment TVA and Westinghouse Electric Company (WEC) will provide a summary report on dielectric strength testing of the In-Core Instrument Thimble Assembly (IITA), Mineral Insulated (MI) cable connector, 1-2 transition assembly, and the MI cables. The summary is to include a sketch identifying the individual components.

Commitment Closure contains the WEC proprietary version of WBT-D-3753 P-Enclosure, Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT Watts Bar 2, dated January 2012. This WEC document provides the summary report on dielectric strength testing of the MI cable assemblies that addresses this NRC request. contains WEC non-proprietary version of WBT-D-3753 NP-Enclosure, Clarification of Dielectric Withstand Testing in Response to WNA-CN-00157-WBT Watts Bar 2, dated January 2012.

U.S. Nuclear Regulatory Commission Page 3 February 1, 2012 cc (Enclosures):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

U.S. Nuclear Regulatory Commission Page 4 February 1, 2012 bcc (Enclosures):

Stephen Campbell U.S. Nuclear Regulatory Commission MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Patricia Holahan, Acting Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 David Rahn U.S. Nuclear Regulatory Commission MS 09D2 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 George A. Wilson, Jr.

U.S. Nuclear Regulatory Commission MS 09E3 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738