ML060600532

From kanterella
Revision as of 21:41, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Alleger - Supplied Tarp Reports That May Need Follow-Up
ML060600532
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 11/25/2003
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0194
Download: ML060600532 (2)


Text

7 Mat.m Ri Allegei- uPyII6dTfiAP,.Re ay- "d 'Fol.6W UD_ '-AW Brief Description .a - F .oll-Up ActionlAssessment ' -

Evaluate decision to perform a complete station air outage while online (eventual impact was a 75gpm reactor coolant leak from the Pressurized Relief Tank).

[20133239]

(NON-CONSERVATIVE DECISION MAKING)

Evaluate Corrective Action Program for response to severe grassing event. Two severe Grassing Events 26 days apart in March of 2003. [20124025 & 201 37707]

(CORRECTIVE ACTION PROGRAM EFFECTIVENESS)

Evaluate Corrective Action Program & Operability Review Quality for resolution of multiple failures and repeated entries and exits of T.S. Action Statements of Containment Fan Cooler Units (CFCU) in December of 2002. [20125714 & 20125678]

(CORRECTIVE ACTION PROGRAM EFFECTIVENESS)

Evaluate Corrective Action Program for resolution of Circulating Water System problems (high silt levels causing excessive wear on screens, complacent maintenance on non-safety related components, grassing, etc.) in March of 2002.

(CORRECTIVE ACTION PROGRAM EFFECTIVENESS)

Investigate temporary modification to provide temporary power to the Met Tower building to avoid issuing a 50.72 report. [20095181]

(CONFIGURATION CONTROL OF T.S. EQUIPMENT)

Winston & Strawn interviews Reviewed by Rick Urban X .--IDA:;

Brief Description Follow-Up-Action/Assessment Assess Impact of the Hope Creek EDG fuel linkage Reviewed in routine Resident Inspector (RI) inspection binding described in the Kurt Kreuger interview (pages report 50-354/2003-003, section 40A4 & 40A7. No

  1. ?# - #?#). additional follow-up needed.

(OPERABILITY DETERMINATION QUALITY)

G:\DRP\BRANCH3\A1legation SCWE\Salem-HC-InterviewlssijesReview.wpd Rev. Date: 11/25103 Of l

NRB Issues irhat May Need Follow-Up identifier Brief MS-rlpti~n b4 p Acissment Mtg minutes No. 00-02 G:\DRP\BRANCH3\A1legation SCWE\Salem-HC-NRB-Review.wpd Rev. Date: 11/24/03 Page 1 of 1