Inspection/Activity Plan, 03/01/2006 - 09/30/2007
ML060610528
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II
To:
Tennessee Valley Authority
Shared Package
ML060610519 List:
References
IR-06-001
Download: ML060610528 (4)


Text

Page 1 of 4 Browns Ferry 03/02/2006 13:41:42 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3BF1 - PLATFORMS, COATINGS, SUPPORTS 1 1 IP 37550 Engineering 03/06/2006 03/10/2006 Other Routine EB3BF1 - LARGE BORE PIPING - ENG'G 1 1 IP 37550 Engineering 02/27/2006 03/03/2006 Other Routine EB3-ISI - U3 INSERVICE INSPECTION 1 3 IP 7111108G Inservice Inspection Activities - BWR 03/06/2006 03/10/2006 Baseline Inspections EB1-BF1 - CABLE INSTALLATION 1 1 IP 37550 Engineering 03/06/2006 03/10/2006 Other Routine PSB1-RP - RP INSPECTION 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/13/2006 03/17/2006 Baseline Inspections EB1-BF1 - CABLE INSTALLATION 1 1 IP 51061 Electric Cable - Procedure Review 03/20/2006 03/24/2006 Other Routine OL PREP - INITIAL EXAM PREP 3 1 V23258 BROWNS FERRY/MAY 2006 EXAM AT POWER FACILITIES 03/27/2006 03/31/2006 Not Applicable EB3BF1 - PLTFORMS, COATINGS, SUPPORTS 1 1 IP 37550 Engineering 04/03/2006 04/07/2006 Other Routine EB3BF1 - PLATFORMS, SUPPORTS, COATINGS 2 1 IP 37550 Engineering 04/03/2006 04/07/2006 Other Routine OL EXAM - INITIAL EXAM 3 1 V23258 BROWNS FERRY/MAY 2006 EXAM AT POWER FACILITIES 05/01/2006 05/12/2006 Not Applicable EB3-HS - HEAT SINK 2 1, 2, 3 IP 7111107B Heat Sink Performance 05/22/2006 05/26/2006 Baseline Inspections EB3 HS - GL 89-13 2 1 IP 37550 Engineering 05/22/2006 05/26/2006 Other Routine PS2-EP - EP INSP 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 05/29/2006 06/02/2006 Baseline Inspections 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 05/29/2006 06/02/2006 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/29/2006 06/02/2006 Baseline Inspections 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 05/29/2006 06/02/2006 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 05/29/2006 06/02/2006 Baseline Inspections EB2 BF1 - THERMAL OVERLOADS, SPLICES, FUSES 2 1 IP 51053 Electrical Components And Systems - Work Observation 06/05/2006 06/09/2006 Other Routine OPN ITEM - OPEN ITEM GL 96-01 2 1 IP 92701 Followup 06/05/2006 06/09/2006 Other Routine This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 4 Browns Ferry 03/02/2006 13:41:42 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3 BF1 - LARGE BORE PIPING SUPPORTS 1 1 IP 37550 Engineering 06/05/2006 06/09/2006 Other Routine 1 IP 37550 Engineering 06/26/2006 06/30/2006 Other Routine OL EXAM - INITIAL EXAM 2 1 V23258 BROWNS FERRY/MAY 2006 EXAM AT POWER FACILITIES 06/12/2006 06/16/2006 Not Applicable EB2 BF1 - EQ, THERMAL OVERLOADS, SPLICES 2 1 IP 51053 Electrical Components And Systems - Work Observation 06/19/2006 06/23/2006 Other Routine EB3 BF1 - U1 ISI 1 1 IP 73753 Inservice Inspection 06/19/2006 06/23/2006 Other Routine ISFSI-O - 60855.1 - OPERATION OF AN ISFSI 1 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/03/2006 07/07/2006 Other Routine EB3 BF1 - SMALL BORE AND INSTRUMENT PIPING 1 1 IP 37550 Engineering 07/10/2006 07/14/2006 Other Routine EB3BF1 - HVAC SUPPORTS 1 1 IP 37550 Engineering 07/24/2006 07/28/2006 Other Routine EB1ELECT - CABLE AMPACITY 1 1 IP 37550 Engineering 07/31/2006 08/04/2006 Other Routine EB2-TFP - TRIENNIAL FP PRE-INSPECTION VISIT 4 1, 2, 3 IP 7111105T Fire Protection [Triennial] 08/01/2006 08/03/2006 Baseline Inspections EB1 BF1 - MISC STEEL FRAMES 1 1 IP 37550 Engineering 08/14/2006 08/18/2006 Other Routine BUL 80-6 - ENGINEERING SAFETY RESET CONTROL 1 1 IP 37550 Engineering 08/28/2006 09/01/2006 Other Routine EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 2, 3 IP 7111105T Fire Protection [Triennial] 08/28/2006 09/01/2006 Baseline Inspections EB3 BF1 - SMALL BORE AND INSTRUMENT TUBING 1 1 IP 37550 Engineering 09/05/2006 09/08/2006 Other Routine EB1 BF1 - DRYWELL COATINGS 1 1 IP 37550 Engineering 09/11/2006 09/15/2006 Other Routine EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 2, 3 IP 7111105T Fire Protection [Triennial] 09/11/2006 09/15/2006 Baseline Inspections EB3MR - UNIT 1 MAINTENANCE RULE 2 1 IP 62706 Maintenance Rule 09/11/2006 09/15/2006 Other Routine EB1BF1 - CABLE INSTALLATION 1 1 IP 51053 Electrical Components And Systems - Work Observation 09/18/2006 09/22/2006 Other Routine This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 4 Browns Ferry 03/02/2006 13:41:42 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP 7111105T Fire Protection [Triennial] 09/25/2006 09/29/2006 Baseline Inspections EB2 BF1 - EQ, PIECE PARTS 1 1 IP 51053 Electrical Components And Systems - Work Observation 10/10/2006 10/13/2006 Other Routine EB1CDB - COMPONENT DESIGN BASIS INSPECTION 5 1, 2, 3 IP 7111121 Component Design Bases Inspection 10/30/2006 11/03/2006 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 11/13/2006 11/17/2006 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 11/27/2006 12/01/2006 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 12/04/2006 12/08/2006 Baseline Inspections EB3 BF1 - LICENSE RENEWAL FOLLOWUP U1 1 1 IP 92701 Followup 12/03/2006 12/07/2006 Other Routine OL RQ - REQUAL INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 12/04/2006 12/08/2006 Baseline Inspections EB2 BF1 - EQ, PIECE PARTS 1 1 IP 37551 Onsite Engineering 01/08/2007 01/12/2007 Other Routine PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 01/29/2007 01/31/2007 Baseline Inspections EB3-MR - MR EFFECTIVENESS 2 1, 2, 3 IP 7111112B Maintenance Effectiveness 02/05/2007 02/09/2007 Baseline Inspections DRP/BR6 - ORAT INSPECTION FOR UNIT 1 5 1 IP 93806 Operational Readiness Assessment Team 02/01/2007 02/15/2007 Other Routine PSB1-RP - RP OCCUPATIONAL BASELINE INSP WEEK 1 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/26/2007 03/02/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 02/26/2007 03/02/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 02/26/2007 03/02/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 02/26/2007 03/02/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/05/2007 03/09/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WEEK 2 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/19/2007 03/23/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 03/19/2007 03/23/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 03/19/2007 03/23/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections PS2-EP - EP EXERCISE 2 1, 2, 3 IP 7111401 Exercise Evaluation 07/23/2007 07/27/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 4 of 4 Browns Ferry 03/02/2006 13:41:42 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EP EXERCISE 2 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/23/2007 07/27/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 07/23/2007 07/27/2007 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2, 3 IP 71152B Identification and Resolution of Problems 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 08/20/2007 08/24/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 6 1 V23231 BROWNS FERRY/EXAMS AT POWER FACILITIES 08/20/2007 08/31/2007 Not Applicable OL EXAM - INITIAL EXAM WEEK 1 3 1 V23231 BROWNS FERRY/EXAMS AT POWER FACILITIES 09/24/2007 10/05/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.