Inspection/Activity Plan, 03/01/2006 - 09/30/2007
ML060610528
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/02/2006
From:
NRC/RGN-II
To:
Tennessee Valley Authority
Shared Package
ML060610519 List:
References
IR-06-001
Download: ML060610528 (4)


Text

Browns Ferry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 4 03/02/2006 13:41:42 Report 22 1

EB3BF1

- PLATFORMS, COATINGS, SUPPORTS Other Routine 03/06/2006 03/10/2006 1

37550 IP Engineering 1

EB3BF1

- LARGE BORE PIPING - ENG'G Other Routine 02/27/2006 03/03/2006 1

37550 IP Engineering 1

EB3-ISI

- U3 INSERVICE INSPECTION Baseline Inspections 03/06/2006 03/10/2006 3

7111108G IP Inservice Inspection Activities - BWR 1

EB1-BF1

- CABLE INSTALLATION Other Routine 03/06/2006 03/10/2006 1

37550 IP Engineering 1

PSB1-RP

- RP INSPECTION Baseline Inspections 03/13/2006 03/17/2006 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1

EB1-BF1

- CABLE INSTALLATION Other Routine 03/20/2006 03/24/2006 1

51061 IP Electric Cable - Procedure Review 3

OL PREP

- INITIAL EXAM PREP Not Applicable 03/27/2006 03/31/2006 1

V23258 BROWNS FERRY/MAY 2006 EXAM AT POWER FACILITIES 1

EB3BF1

- PLTFORMS, COATINGS, SUPPORTS Other Routine 04/03/2006 04/07/2006 1

37550 IP Engineering 2

EB3BF1

- PLATFORMS, SUPPORTS, COATINGS Other Routine 04/03/2006 04/07/2006 1

37550 IP Engineering 3

OL EXAM

- INITIAL EXAM Not Applicable 05/01/2006 05/12/2006 1

V23258 BROWNS FERRY/MAY 2006 EXAM AT POWER FACILITIES 2

EB3-HS

- HEAT SINK Baseline Inspections 05/22/2006 05/26/2006 1, 2, 3 7111107B IP Heat Sink Performance 2

EB3 HS

- GL 89-13 Other Routine 05/22/2006 05/26/2006 1

37550 IP Engineering 1

PS2-EP

- EP INSP Baseline Inspections 05/29/2006 06/02/2006 1, 2, 3 7111402 IP Alert and Notification System Testing Baseline Inspections 05/29/2006 06/02/2006 1, 2, 3 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 05/29/2006 06/02/2006 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 05/29/2006 06/02/2006 1, 2, 3 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 05/29/2006 06/02/2006 1, 2, 3 71151 IP Performance Indicator Verification 2

EB2 BF1

- THERMAL OVERLOADS, SPLICES, FUSES Other Routine 06/05/2006 06/09/2006 1

51053 IP Electrical Components And Systems - Work Observation 2

OPN ITEM

- OPEN ITEM GL 96-01 Other Routine 06/05/2006 06/09/2006 1

92701 IP Followup This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Browns Ferry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 4 03/02/2006 13:41:42 Report 22 1

EB3 BF1

- LARGE BORE PIPING SUPPORTS Other Routine 06/05/2006 06/09/2006 1

37550 IP Engineering Other Routine 06/26/2006 06/30/2006 1

37550 IP Engineering 2

OL EXAM

- INITIAL EXAM Not Applicable 06/12/2006 06/16/2006 1

V23258 BROWNS FERRY/MAY 2006 EXAM AT POWER FACILITIES 2

EB2 BF1

- EQ, THERMAL OVERLOADS, SPLICES Other Routine 06/19/2006 06/23/2006 1

51053 IP Electrical Components And Systems - Work Observation 1

EB3 BF1

- U1 ISI Other Routine 06/19/2006 06/23/2006 1

73753 IP Inservice Inspection 1

ISFSI-O

- 60855.1 - OPERATION OF AN ISFSI Other Routine 07/03/2006 07/07/2006 2

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1

EB3 BF1

- SMALL BORE AND INSTRUMENT PIPING Other Routine 07/10/2006 07/14/2006 1

37550 IP Engineering 1

EB3BF1

- HVAC SUPPORTS Other Routine 07/24/2006 07/28/2006 1

37550 IP Engineering 1

EB1ELECT

- CABLE AMPACITY Other Routine 07/31/2006 08/04/2006 1

37550 IP Engineering 4

EB2-TFP

- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 08/01/2006 08/03/2006 1, 2, 3 7111105T IP Fire Protection [Triennial]

1 EB1 BF1

- MISC STEEL FRAMES Other Routine 08/14/2006 08/18/2006 1

37550 IP Engineering 1

BUL 80-6

- ENGINEERING SAFETY RESET CONTROL Other Routine 08/28/2006 09/01/2006 1

37550 IP Engineering 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 08/28/2006 09/01/2006 2, 3 7111105T IP Fire Protection [Triennial]

1 EB3 BF1

- SMALL BORE AND INSTRUMENT TUBING Other Routine 09/05/2006 09/08/2006 1

37550 IP Engineering 1

EB1 BF1

- DRYWELL COATINGS Other Routine 09/11/2006 09/15/2006 1

37550 IP Engineering 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 09/11/2006 09/15/2006 2, 3 7111105T IP Fire Protection [Triennial]

2 EB3MR

- UNIT 1 MAINTENANCE RULE Other Routine 09/11/2006 09/15/2006 1

62706 IP Maintenance Rule 1

EB1BF1

- CABLE INSTALLATION Other Routine 09/18/2006 09/22/2006 1

51053 IP Electrical Components And Systems - Work Observation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Browns Ferry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 4 03/02/2006 13:41:42 Report 22 4

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 09/25/2006 09/29/2006 1

7111105T IP Fire Protection [Triennial]

1 EB2 BF1

- EQ, PIECE PARTS Other Routine 10/10/2006 10/13/2006 1

51053 IP Electrical Components And Systems - Work Observation 5

EB1CDB

- COMPONENT DESIGN BASIS INSPECTION Baseline Inspections 10/30/2006 11/03/2006 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 11/13/2006 11/17/2006 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 11/27/2006 12/01/2006 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 12/04/2006 12/08/2006 1, 2, 3 7111121 IP Component Design Bases Inspection 1

EB3 BF1

- LICENSE RENEWAL FOLLOWUP U1 Other Routine 12/03/2006 12/07/2006 1

92701 IP Followup 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 12/04/2006 12/08/2006 1, 2, 3 7111111B IP Licensed Operator Requalification Program 1

EB2 BF1

- EQ, PIECE PARTS Other Routine 01/08/2007 01/12/2007 1

37551 IP Onsite Engineering 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 01/29/2007 01/31/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 2

EB3-MR

- MR EFFECTIVENESS Baseline Inspections 02/05/2007 02/09/2007 1, 2, 3 7111112B IP Maintenance Effectiveness 5

DRP/BR6

- ORAT INSPECTION FOR UNIT 1 Other Routine 02/01/2007 02/15/2007 1

93806 IP Operational Readiness Assessment Team 3

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WEEK 1 Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 71151 IP Performance Indicator Verification 1

EB3-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 03/05/2007 03/09/2007 2

7111108G IP Inservice Inspection Activities - BWR 3

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WEEK 2 Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 71151 IP Performance Indicator Verification 2

PS2-EP

- EP EXERCISE Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 7111401 IP Exercise Evaluation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Browns Ferry Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 4 of 4 03/02/2006 13:41:42 Report 22 2

PS2-EP

- EP EXERCISE Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71151 IP Performance Indicator Verification 4

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 08/20/2007 08/24/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 6

OL PREP

- INITIAL EXAM PREP Not Applicable 08/20/2007 08/31/2007 1

V23231 BROWNS FERRY/EXAMS AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK 1 Not Applicable 09/24/2007 10/05/2007 1

V23231 BROWNS FERRY/EXAMS AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.