ML060790440

From kanterella
Revision as of 20:55, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
03/14/2006 Summary of Public Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss the Perry End-of-Cycle Plant Annual Performance Assessment
ML060790440
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/20/2006
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To:
FirstEnergy Nuclear Operating Co
References
Download: ML060790440 (5)


Text

March 20, 2006 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Perry Nuclear Power Plant, Unit 1

SUBJECT:

SUMMARY

OF THE MARCH 14, 2006, PUBLIC MEETING TO DISCUSS THE PERRY END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On March 14, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Quail Hollow Resort in Painesville, Ohio. The meeting was between NRC Region III management and FirstEnergy Nuclear Operating Company (FENOC) management to discuss the NRCs assessment of Perrys safety performance for the period from January 1 through December 31, 2005. The meeting notice, NRC presentation, and licensee presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML060240491, ML060750734, and ML060750731 respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.

The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),

national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Perrys performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. As part of this regulatory performance meeting, FENOC responded to the NRCs assessment and discussed the progress of Perrys Performance Improvement Initiative (PII). Plant management identified the PII as the mechanism for resolving the substantive cross-cutting issues in the areas of Problem Identification and Resolution, and Human Performance. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and FENOC representatives.

/RA/

Eric R. Duncan, Chief Projects Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

As Stated See Attached Distribution

DOCUMENT NAME: E:\Filenet\ML060790440.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME RRuiz:dtp EDuncan DATE 03/17/06 03/20/06 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: G. Leidich, President - FENOC J. Hagan, Chief Operating Officer, FENOC D. Pace, Senior Vice President Engineering and Services, FENOC Director, Site Operations Director, Regulatory Affairs M. Wayland, Director, Maintenance Department Manager, Regulatory Compliance T. Lentz, Director, Performance Improvement J. Shaw, Director, Nuclear Engineering Department D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

FirstEnergy Nuclear Operating Company ADAMS Distribution:

GYS KNJ SJC4 RidsNrrDirsIrib GEG KGO RJP DRPIII DRSIII PLB1 JRK1

Enclosure Meeting Participants NRC M. Satorius, Division Director, DRP, RIII E. Duncan, Branch Chief, DRP, RIII R. Powell, Senior Resident Inspector, Perry M. Franke, Resident Inspector, Perry K. Jabbour, Project Manager, NRR FirstEnergy Nuclear Operating Company L. Pearce, Site Vice President F. von Ahn, Director, Site Operations M. Wayland, Director, Maintenance T. Evans, Acting Director, Performance Improvement