ML062430423

From kanterella
Revision as of 14:32, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Report 22 - Inspection/Activity Plan 09/01/06 - 03/31/08
ML062430423
Person / Time
Site: Farley, 07200042  Southern Nuclear icon.png
Issue date: 08/31/2006
From:
NRC/RGN-II
To:
Southern Nuclear Operating Co
Shared Package
ML062430415 List:
References
Download: ML062430423 (2)


Text

Page 1 of 2 Farley 08/30/2006 13:37:27 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS2-EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/11/2006 09/15/2006 Baseline Inspections PB2TI169 - MSPI VERIFICATION 2 1, 2 IP 2515/169 Mitigating Systems Performance Index Verification 10/01/2006 12/31/2006 Safety Issues OL PREP - INITIAL EXAM PREPARATION 2 1 V23261 FARLEY/OCTOBER 2006 EXAM AT POWER FACILITIES 10/02/2006 10/06/2006 Not Applicable OL EXAM - INITIAL EXAM 2 1 V23261 FARLEY/OCTOBER 2006 EXAM AT POWER FACILITIES 10/23/2006 10/27/2006 Not Applicable PSB1-RP - RP PUBLIC PRE-INSPECTION VISIT/ISFSI 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/03/2007 01/05/2007 Baseline Inspections PSB1-RP - RP PUBLIC BASELINE INSPECTION 4 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 01/22/2007 01/26/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 01/22/2007 01/26/2007 Baseline Inspections EB3-ISI - UNIT 2 INSERVICE INSPECTION 2 2 IP 7111108P Inservice Inspection Activities - PWR 04/16/2007 04/20/2007 Baseline Inspections EB3SGISI - UNIT 2 STEAM GENERATOR ISI 2 2 IP 7111108P Inservice Inspection Activities - PWR 04/23/2007 04/27/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-2) 1 2 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 04/29/2007 05/04/2007 Safety Issues 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine PB2-PI&R - BIENNIAL PI&R 4 1, 2 IP 71152B Identification and Resolution of Problems 08/06/2007 08/10/2007 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 08/20/2007 08/24/2007 Baseline Inspections PS2-EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/10/2007 09/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Farley 08/30/2006 13:37:27 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL PREP - INITIAL EXAM PREPARATION 3 1 V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 10/01/2007 10/05/2007 Not Applicable EB3-ISI - UNIT 1 INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/08/2007 10/12/2007 Baseline Inspections EB1-SUMP - PWR CONTAINMENT SUMP BLOCKAGE TI (U-1) 1 1 IP 2515/166 Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02] 10/21/2007 10/26/2007 Safety Issues OL EXAM - INITIAL EXAM WEEK #1 3 1 V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 10/22/2007 10/26/2007 Not Applicable OL EXAM - INITIAL EXAM WEEK #2 3 1 V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 11/05/2007 11/09/2007 Not Applicable EB1-MODS - MODIFICATIONS - 10CFR50.59 2 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 11/12/2007 11/16/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 11/12/2007 11/16/2007 Baseline Inspections EBR - MR - MAINTENANCE RULE 1 1, 2 IP 7111112B Maintenance Effectiveness 02/04/2008 02/08/2008 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION 5 1, 2 IP 7111105T Fire Protection [Triennial] 02/26/2008 02/28/2008 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 03/17/2008 03/21/2008 Baseline Inspections 1, 2 IP 7111105T Fire Protection [Triennial] 03/31/2008 04/04/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.