Report 22 - Inspection/Activity Plan 09/01/06 - 03/31/08
ML062430423
Person / Time
Site: Farley, 07200042  Southern Nuclear icon.png
Issue date: 08/31/2006
From:
NRC/RGN-II
To:
Southern Nuclear Operating Co
Shared Package
ML062430415 List:
References
Download: ML062430423 (2)


Text

Farley Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 13:37:27 Report 22 3

PS2-EP

- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/11/2006 09/15/2006 1, 2 71151 IP Performance Indicator Verification 2

PB2TI169

- MSPI VERIFICATION Safety Issues 10/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 2

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 10/02/2006 10/06/2006 1

V23261 FARLEY/OCTOBER 2006 EXAM AT POWER FACILITIES 2

OL EXAM

- INITIAL EXAM Not Applicable 10/23/2006 10/27/2006 1

V23261 FARLEY/OCTOBER 2006 EXAM AT POWER FACILITIES 1

PSB1-RP

- RP PUBLIC PRE-INSPECTION VISIT/ISFSI Baseline Inspections 01/03/2007 01/05/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4

PSB1-RP

- RP PUBLIC BASELINE INSPECTION Baseline Inspections 01/22/2007 01/26/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/22/2007 01/26/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 01/22/2007 01/26/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 01/22/2007 01/26/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 01/22/2007 01/26/2007 1, 2 71151 IP Performance Indicator Verification 2

EB3-ISI

- UNIT 2 INSERVICE INSPECTION Baseline Inspections 04/16/2007 04/20/2007 2

7111108P IP Inservice Inspection Activities - PWR 2

EB3SGISI

- UNIT 2 STEAM GENERATOR ISI Baseline Inspections 04/23/2007 04/27/2007 2

7111108P IP Inservice Inspection Activities - PWR 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Safety Issues 04/29/2007 05/04/2007 2

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

1 60855.1

- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 1

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4

PB2-PI&R

- BIENNIAL PI&R Baseline Inspections 08/06/2007 08/10/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 08/20/2007 08/24/2007 1, 2 71152B IP Identification and Resolution of Problems 1

PS2-EP

- EMERGENCY PREPAREDNESS INSPECTION Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/10/2007 09/14/2007 1, 2 71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Farley Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 13:37:27 Report 22 3

OL PREP

- INITIAL EXAM PREPARATION Not Applicable 10/01/2007 10/05/2007 1

V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 1

EB3-ISI

- UNIT 1 INSERVICE INSPECTION Baseline Inspections 10/08/2007 10/12/2007 1

7111108P IP Inservice Inspection Activities - PWR 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Safety Issues 10/21/2007 10/26/2007 1

2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]

3 OL EXAM

- INITIAL EXAM WEEK #1 Not Applicable 10/22/2007 10/26/2007 1

V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM WEEK #2 Not Applicable 11/05/2007 11/09/2007 1

V23273 FARLEY/OCTOBER 2007 EXAM AT POWER FACILITIES 2

EB1-MODS

- MODIFICATIONS - 10CFR50.59 Baseline Inspections 11/12/2007 11/16/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/12/2007 11/16/2007 1, 2 7111117B IP Permanent Plant Modifications 1

EBR - MR

- MAINTENANCE RULE Baseline Inspections 02/04/2008 02/08/2008 1, 2 7111112B IP Maintenance Effectiveness 5

EB2-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections 02/26/2008 02/28/2008 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 03/17/2008 03/21/2008 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 03/31/2008 04/04/2008 1, 2 7111105T IP Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.