August 31, 2006 Southern Nuclear Operating Company, Inc.
ATTN:
Mr. H. L. Sumner Vice President - Farley Project P. O. Box 1295 Birmingham, AL 35201
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - JOSEPH M.
FARLEY NUCLEAR PLANT
Dear Mr. Sumner:
On August 3, 2006, the NRC staff completed its performance review of the Joseph M. Farley Nuclear Plant for the first half of the calendar year (CY) 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.
Overall, Farley Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for both Farley Units for the most recent quarter was in the Regulatory Response Column of the NRCs Action Matrix due to a Mitigating Systems Performance Index, Cooling Water Systems PI crossing the Green/White threshold in the 2nd quarter of CY 2006. This White PI, involving the Mitigating System Cornerstone, reflected performance at a level requiring increased regulatory response. Therefore, in addition to the reactor oversight process (ROP) baseline inspection program at your facility, the NRC plans to conduct a supplemental inspection in accordance with IP 95001, Inspection for One or Two White Inputs In a Strategic Performance Area, as required by the NRCs Action Matrix.
We will coordinate with you the scheduling of the supplemental inspection.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. In addition to the baseline inspections and the supplemental inspection mentioned above, the plan currently includes non-ROP inspections involving containment sump blockage, Mitigating System Performance Index, and your Independent Spent Fuel Storage Installation. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.
SNC 2
Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Scott Shaeffer at (404) 562-4521 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Charles A. Casto, Director Division of Reactor Projects Docket No.: 50-348, 50-364, and 72-42 Licensee No.: NPF-2, NPF-8
Enclosure:
Farley Inspection/Activity Plan cc w/encl: (See page 3)
_package - ML062430415 letter - ML062430420 OFFICE RII:DRP SIGNATURE NAME GWilliams DATE 9/ /2006 9/ /2006 9/ /2006 9/ /2006 9/ /2006 9/ /2006 9/ /2006 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
SNC 3
cc w/encl:
J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. R. Madison General Manager, Plant Hatch Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Raymond D. Baker Manager Licensing - Hatch Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution Bentina C. Terry Southern Nuclear Operating Company, Inc.
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Manager, Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Chairman Appling County Commissioners 69 Tippins St., Suite 201 Baxley, GA 31513 Resident Manager Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 Distribution w/encl: (See page 4)
SNC 4
Letter to H. L. Sumner from Charles A. Casto dated August 31, 2006
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - FARLEY NUCLEAR PLANT Distribution w/encl:
C. Gratton, NRR C. Evans L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC