ML19017A162

From kanterella
Revision as of 13:16, 23 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031)
Date released: 02/07/2019 Download: ML19017A162


Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031)
ML19017A173
Person / Time
Site: Pilgrim
Issue date: 01/30/2019
From: John Lamb
Special Projects and Process Branch
To:
Entergy Nuclear Operations
J. Lamb, 415-3100
References
EPID L-2018-LLL-0031, EPID L-2018-LLO-0003
Download: ML19017A173 (7)
Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031)
ML19009A343
Person / Time
Site: Pilgrim
Issue date: 01/15/2019
From: Cowan P, Sterdis A
Comprehensive Decommissioning International, Entergy Nuclear Operations, Holtec
To:
Division of Operating Reactor Licensing
Lamb J G, NRR/DORL/LSPB, 301-415-3100
References
Download: ML19009A343 (7)
Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031)
ML19009A171
Person / Time
Site: Pilgrim
Issue date: 01/15/2019
From:
Entergy Nuclear Operations
To:
Office of Nuclear Reactor Regulation
Lamb J G, NRR/DORL/LSPB, 301-415-3100
References
Download: ML19009A171 (12)
Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (EPID L-2018-LLL-0031)
ML19008A494
Person / Time
Site: Pilgrim
Issue date: 01/15/2019
From: John Lamb, Bruce Watson
Reactor Decommissioning Branch, Special Projects and Process Branch
To:
Lamb J G, NRR/DORL/LSPB, 301-415-3100
References
Download: ML19008A494 (16)