Correction of Error in Docket Number Associated with Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage
ML19267A010
Person / Time
Site: Pilgrim
(DPR-035)
Issue date: 09/30/2019
From: Scott Wall
Plant Licensing Branch III
To: Cowan P, Oneid P
Holtec Decommissioning International
Wall S
References
EPID L-2018-LLO-0003
Download: ML19267A010 (3)


Text

September 30, 2019 Mr. Pierre Paul Oneid Senior Vice President and Chief Nuclear Officer Holtec International Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden NJ 08104 Ms. Pamela B. Cowan Senior Vice President and Chief Operating Officer Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Blvd.

Camden NJ 08104

SUBJECT:

PILGRIM NUCLEAR POWER STATION - CORRECTION OF ERROR IN DOCKET NUMBER ASSOCIATED WITH ISSUANCE OF AMENDMENT NO. 249 RE: ORDER APPROVING DIRECT TRANSFER OF RENEWED FACILITY OPERATING LICENSE AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION GENERAL LICENSE AND CONFORMING AMENDMENT (EPID L-2018-LLO-0003)

Dear Mr. Oneid and Ms. Cowan:

By letter dated August 27, 2019 (Agencywide Documents Access and Management System Accession No. ML19235A050), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 249 to Renewed Facility Operating License (RFOL) No. DPR-35 for the Pilgrim Nuclear Power Station (Pilgrim). The NRC staff issued Amendment No. 249 as a conforming amendment in support of the staffs approval of the direct and indirect transfer of Pilgrims RFOL and the general license for the Pilgrim Independent Spent Fuel Storage Installation (ISFSI).

Subsequent to the issuance of this amendment, the NRC staff discovered that an error was made in referencing the Pilgrim ISFSI docket. Specifically, on page 2 of the transmittal letter for the Pilgrim conforming amendment contains the following typographical error (emphasis added in bold):

Docket Nos. 50-293 and 72-15 The correct docket should be (emphasis added in bold):

Docket Nos. 50-293 and 72-1044

P. Oneid and The NRC staff has determined that this error was inadvertently introduced and was entirely editorial in nature. The correction does not change any of the conclusions in the SE associated with the issuance of Amendment No. 249 for Pilgrim and does not affect the associated notice to the public.

If you have any questions concerning this action, please contact me at (301) 415-2855 or by e-mail to Scott.Wall@nrc.gov.

Sincerely,

/RA/

Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-293 and 72-1044 cc: Mr. A. Christopher Bakken Executive Vice-President, Nuclear Operations and CNO Entergy Services, Inc.

1340 Echelon Parkway M-ECH-61 Jackson, MS 39213 Brian R. Sullivan Site Vice President Holtec Decommissioning International, LLC Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Listserv

ML19267A010 EA-19-084 OFFICE NRR/DORL/LPL3/PM NRR/DORL/LSPB/LA NRR/DORL/LPL3/BC(A) NRR/DORL/LPL3/PM NAME SWall JBurkhardt LRegner SWall DATE 9/25/19 9/25/19 9/27/19 9/30/19