Letter Sequence Other |
---|
EPID:L-2018-LLO-0003, Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate (Approved, Closed) |
|
MONTHYEARML18333A2402018-12-17017 December 2018 Application for Order Approving Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC (Owner) and Holtec Decommissioning International, LLC (Operator) Project stage: Other ML18337A1372018-12-17017 December 2018 Request for Withholding Info from Public Disclosure - 11/12/18 Affidavit Executed by A. Rosenlieb, Entergy and 11/14/18 Affidavit Executed by A. Ryan, Holtec International Enclosure 1P, Equity Purchase and Sale Agreement (L-2018-LLO-0003) Project stage: Other ML18333A0092018-12-19019 December 2018 Acceptance Review Letter, Application for Order for Direct and Indirect Transfers of Control of Licenses, Conforming License Amendment, and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) Project stage: Acceptance Review ML18337A4182019-01-0202 January 2019 FRN, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC Project stage: Other ML18337A4302019-01-0202 January 2019 Letter, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC Project stage: Other ML19017A1622019-01-15015 January 2019, 30 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate Project stage: Request ML19017A1732019-01-30030 January 2019 Summary of 1/15/2019 Public Meeting Regarding Pilgrim Nuclear Power Station Post-Shutdown Decommissioning Activities Report, Which Includes the Site-Specific Decommissioning Cost Estimate Project stage: Meeting ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc Project stage: RAI ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order Project stage: Draft Other ML19198A2832019-08-13013 August 2019 Notification of Significant Licensing Action - Proposed Issuance of Order Approving a License Transfer Application for Which a Hearing Has Been Requested Project stage: Approval ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application Project stage: Acceptance Review ML19170A1012019-08-22022 August 2019 Letter, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator Project stage: Other ML19170A2652019-08-22022 August 2019 Enclosure 1, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Other ML19170A2502019-08-22022 August 2019 Enclosure 3, Safety Evaluation for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Approval ML19170A1472019-08-22022 August 2019 Order, Safety Evaluation, and Draft Conforming Amendment for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Request ML19170A1492019-08-22022 August 2019 Enclosure 2, Draft Conforming Amendment for Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Draft Other ML19170A2572019-08-22022 August 2019 Federal Register Notice, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) Project stage: Other ML19234A3612019-08-22022 August 2019 Attachment 1 - License Transfer Cover Letter Project stage: Other ML19235A0502019-08-27027 August 2019 Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and ISFSI General License and Conforming Amendment Project stage: Approval ML19267A0102019-09-30030 September 2019 Correction of Error in Docket Number Associated with Issuance of Amendment No. 249 Order Approving Direct Transfer of Renewed Facility Operating License and Independent Spent Fuel Storage Project stage: Approval 2019-07-26
[Table View] |
|
---|
Category:Legal-Correspondence/Miscellaneous
MONTHYEARML20171A6762020-06-19019 June 2020 Commonwealth of Massachusetts Notice of Withdrawal of Its Petition for Leave to Intervene and Hearing Request ML20167A3352020-06-15015 June 2020 Joint Status Report ML20063M9722020-02-26026 February 2020 2-26-20 Docketing Statement (DC Cir.)(Case No. 20-1019) ML19296A0192019-10-23023 October 2019 Notice of Appearance for Jeremy L. Wachutka ML19296A0492019-10-23023 October 2019 Notice of Withdrawal for Jennifer Scro ML19239A4102019-08-27027 August 2019 Notification of Issuance of Conforming Amendment ML19235A2962019-08-23023 August 2019 NRC Staff Notification Re License Transfer Documents ML19235A3022019-08-23023 August 2019 Attachment 6 - Exemption ML19235A3012019-08-23023 August 2019 Attachment 5 - Exemption Letter ML19235A3002019-08-23023 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19235A2992019-08-23023 August 2019 Attachment 3 - Draft Conforming Amendment ML19235A2982019-08-23023 August 2019 Attachment 2 - License Transfer Order ML19235A2972019-08-23023 August 2019 Attachment 1 - License Transfer Cover Letter ML19234A3652019-08-22022 August 2019 Attachment 5 - Exemption Cover Letter ML19234A3632019-08-22022 August 2019 Attachment 3 - Draft Conforming Amendment ML19234A3622019-08-22022 August 2019 Attachment 2 - License Transfer Order ML19234A3612019-08-22022 August 2019 Attachment 1 - License Transfer Cover Letter ML19234A3602019-08-22022 August 2019 NRC Staff Notification Re Issuance of License Transfer ML19234A3642019-08-22022 August 2019 Attachment 4 - License Transfer Safety Evaluation ML19234A3662019-08-22022 August 2019 Attachment 6 - Exemption ML19225D0062019-08-13013 August 2019 NRC Staff Notification Re Nsla ML19225C2422019-08-13013 August 2019 Notice of Appearance for Jennifer Scro ML19120A5002019-04-30030 April 2019 Notice of Appearance for Meghan C. Hammond ML19080A2042019-03-21021 March 2019 Notice of Appearance of Peter D. Lejeune, Alan D. Lovett, and Andrew R. Ryan ML19074A2862019-03-15015 March 2019 Notice of Appearance for Joseph Dorfler ML19074A2892019-03-15015 March 2019 Notice of Appearance for Seth Schofield ML19072A3122019-03-0404 March 2019 Comments from Guy Page on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3132019-03-0404 March 2019 Comments from Brad Ferland on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3142019-03-0404 March 2019 Comments from Commonwealth of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1772019-03-0404 March 2019 Comments from Catherine Berkey on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3312019-03-0404 March 2019 Comments from the Cape Downwinders and Boston Downwinders on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1732019-03-0404 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3322019-03-0404 March 2019 Comment from Pilgrim Watch on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3452019-03-0404 March 2019 Comment from Pine Dubois on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1652019-03-0404 March 2019 Comments Received from Concerned Citizens of Massachusetts on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1682019-03-0303 March 2019 Comments from Joan Holt on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19064B3302019-03-0303 March 2019 Comment from James B. Lampert on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1642019-03-0303 March 2019 Comments from Diana Maher on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1692019-03-0303 March 2019 Comments from Lesley Phillips on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1702019-03-0303 March 2019 Comments from Lillia Frantin on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1712019-03-0303 March 2019 Comments from Nicola Blake on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1722019-03-0303 March 2019 Comments from Alex Bally on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1742019-03-0303 March 2019 Comments from Barbara Clark on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1752019-03-0303 March 2019 Comments from Betsy Smith on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1672019-03-0202 March 2019 Comments from Irene Paine on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1662019-03-0202 March 2019 Comments from Gertrude Carter on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19070A1622019-03-0202 March 2019 Comments from David Agnew on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19065A2582019-03-0202 March 2019 Comment from James Sinclair on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19065A2572019-03-0202 March 2019 Comments from William Stewart on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) ML19072A3102019-03-0101 March 2019 Comments from David Noyes on the Pilgrim Nuclear Power Station; Consideration of Approval of Transfer of License and Conforming Amendment (NRC-2018-0279) 2020-06-19
[Table view] |
Text
August 22, 2019 Mr. A. Christopher Bakken, III President, CEO Entergy Nuclear Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213
SUBJECT:
PILGRIM NUCLEAR POWER STATIONORDER APPROVING DIRECT AND INDIRECT TRANSFER OF LICENSE AND CONFORMING LICENSE AMENDMENT (EPID L-2018-LLO-0003)
Dear Mr. Bakken:
By letter dated November 16, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18320A031), as supplemented by letters dated November 16, 2018, April 17, 2019, and July 29, 2019 (ADAMS Accession Nos. ML18320A040, ML19109A177, and ML19210E470, respectively), Entergy Nuclear Operations, Inc. (ENOI), on behalf of itself and Entergy Nuclear Generation Company (ENGC) (to be known as Holtec Pilgrim, LLC), Holtec International (Holtec), and Holtec Decommissioning International, LLC (HDI) (collectively referred to as Applicants), requested that the U.S. Nuclear Regulatory Commission (NRC) consent to (1) the indirect transfer of control of the Renewed Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (Pilgrim), as well as the general license for the Pilgrim Independent Spent Fuel Storage Installation, to Holtec; and (2) the direct transfer of ENOIs operating authority to HDI. The Applicants also requested that the NRC approve a conforming administrative amendment to the facility license to reflect the proposed direct transfer of the licenses from ENOI to HDI and the planned name change from ENGC to Holtec Pilgrim, LLC.
The Applicants requested that the NRC consent to the transfer of the licensed possession, maintenance, and decommissioning authorities to Holtec Pilgrim, LLC, to implement expedited decommissioning at Pilgrim. The Applicants also requested approval of a conforming amendment to the license under Title 10 of the Code of Federal Regulations (10 CFR) 50.80, Transfer of Licenses, and 10 CFR 50.90, Application for Amendment of License, Construction Permit, or Early Site Permit.
The NRC staff has completed its review of the Pilgrim license transfer application. Enclosure 1 is the Order, which provides consent to the direct and indirect license transfer, subject to the conditions described therein. The Order also approves the draft conforming license amendment for Pilgrim (Enclosure 2), which will be issued and made effective at the time the license transfer is completed. Enclosure 3 is the NRC staffs safety evaluation related to these actions. The NRC staff will place the safety evaluation in the NRC public document room and add it to the ADAMS Publicly Available Records System Library.
C. Bakken A copy of the Order has been forwarded to the Office of the Federal Register for publication.
If you have any questions concerning this action, please contact me at (301) 415-2855 or via e-mail at Scott.Wall@nrc.gov.
Sincerely,
/RA/
Scott P. Wall, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-293 and 72-1044
Enclosures:
- 1. Order
- 2. Draft Conforming Amendment to Renewed License No. DPR-35
- 3. Safety Evaluation cc: Listserv
PKG: ML19170A147 Letter: ML19170A101 Order: ML19170A265 Amendment: ML19170A149 Safety Evaluation: ML19170A250 FRN: ML19170A257 *via memo ** via email OFFICE NRR/DORL/LPL3/PM NRR/DORL/LSPB/LA Tech Editor NRR/DIRS/IRAB/BC*
NAME SWall JBurkhardt JDougherty GBowman DATE 7/9/19 7/1/19 7/12/19 6/12/19 OFFICE NRR/DLP/PFPB/BC(A)* NMSS/DUWP/RDB/BC ** OGC ** OE/D**
NAME FMiller BWatson AGhosh FPeduzzi for GWilson DATE 6/7/19 7/9/19 8/6/19 7/24/19 OFFICE NRR/DORL/LPL3/BC(A) ** NRR/DORL/D NRR/D NRR/DORL/LPL3-1/PM NAME LRegner CErlanger HNieh SWall DATE 8/6/19 8/8/19 8/22/19 8/22/19 ENCLOSURE 1 ORDER APPROVING DIRECT AND INDIRECT TRANSFERS OF PILGRIM NUCLEAR POWER STATION RENEWED FACILITY OPERATING LICENSE DPR-35 AND PILGRIM INDEPENDENT SPENT FUEL STORAGE INSTALLATION DOCKET NOS. 50-293 AND 72-1044
ENCLOSURE 2 DRAFT CONFORMING LICENSE AMENDMENT PILGRIM NUCLEAR POWER STATION RENEWED FACILITY OPERATING LICENSE DPR-35 DOCKET NOS. 50-293 AND 72-1044
ENCLOSURE 3 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO REQUEST FOR DIRECT AND INDIRECT TRANSFERS OF CONTROL OF RENEWED FACILITY OPERATING LICENSE NO. DPR-35 AND THE GENERAL LICENSE FOR THE INDEPENDENT SPENT FUEL STORAGE INSTALLATION FOR PILGRIM NUCLEAR POWER STATION DOCKET NOS. 50-293 AND 72-1044