Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML18017A9251999-10-21021 October 1999 Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05 ML18017A8511999-08-26026 August 1999 Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0501999-08-0404 August 1999 Application for Amend to License NPF-63,revising TS to Incorporate Analytical Methodology References in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0431999-08-0202 August 1999 Application for Amend to License NPF-63,revising TS 6.2.2.e to Require Either Operations Manager or off-shift Operations Superintendent to Hold SRO License ML18016B0071999-07-0909 July 1999 Application for Amend to License NPF-63,revising TS 3/4.2.2, TS 3/4.2.3 & TS 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Processing by Implementing Guidance in GL 88-16 & NUREG-1431,Rev 1, Std TS W Plants. ML18016B0111999-07-0909 July 1999 Application for Amend to License NPF-63,relocating TS 3/4.3.3.3,TS 3/4.3.3.4,TS 3/4.3.3.9 & TS 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis Requirements, IAW GL 95-10 ML18016A9891999-06-15015 June 1999 Application for Amend to License NPF-63,revising TS to Incorporate performance-based 10CFR50 App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9761999-06-0202 June 1999 Application for Amend to License NPF-63,revising TS 6.5, Review & Audit, TS 6.8, Procedures & Program & TS 6.10, Record Retention. ML18016A8381999-02-26026 February 1999 Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl ML18016A7681998-12-23023 December 1998 Application for Amend to License NPF-63,revising TS 5.6, Fuel Storage, by Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' Non-proprietary & Proprietary Licensing Repts Encl.Proprietary Info Withheld ML18016A6031998-10-0101 October 1998 Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl ML18016A5921998-09-23023 September 1998 Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door Shut ML18016A5441998-09-0101 September 1998 Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5391998-08-27027 August 1998 Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 ML18016A5031998-08-14014 August 1998 Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months ML18016A3991998-04-24024 April 1998 Application for Amend to License NPF-63,revising TS 3/4.3.2, ESFAS Instrumentation, to Allow Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3461998-03-12012 March 1998 Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A2561997-12-16016 December 1997 Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2221997-10-29029 October 1997 Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1 ML18012A8101997-06-12012 June 1997 Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f ML18012A7841997-05-16016 May 1997 Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6341997-04-23023 April 1997 Application for Amend to License NPF-63,incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affect Specs 4.3.2.1.1.a,4.3.2.1.4.b, 4.3.2.1.6.g,4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5761997-03-17017 March 1997 Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0021997-03-14014 March 1997 Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0051997-03-10010 March 1997 Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration ML18022B0011997-02-27027 February 1997 Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld ML18012A5291997-02-18018 February 1997 Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A4981997-02-0606 February 1997 Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4941997-01-29029 January 1997 Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability ML18012A4621997-01-10010 January 1997 Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure ML18012A4491996-12-30030 December 1996 Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits ML18012A4141996-10-31031 October 1996 Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & Temp ML18012A3931996-10-0808 October 1996 Application for Amend to License NPF-63,proposing to Implement Change to Bases for TSs 3/4.6.1.4 & 3/4.6.1.6 Revising Calculated Peak Pressure for MSLB Event ML18012A3701996-09-18018 September 1996 Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure Testing ML18012A3031996-07-19019 July 1996 Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years ML18012A2511996-05-31031 May 1996 Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders ML18012A1801996-03-20020 March 1996 Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 ML18012A1411996-02-16016 February 1996 Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation ML18011A8751995-04-0505 April 1995 Application for Amend to License NPF-63,revising Portions of Section 3/4.9, Refueling Operations to Be Consistent W/ NUREG-1431 & Relocating Applicable Sections Per Commission Final Policy Statement ML18011A8721995-03-30030 March 1995 Application for Amend to License NPF-63,revising EDG SR Contained in Section 4.8.1.1.2 to Be Consistent w/NUREG-1431 New Std TS for Westinghouse Plants & Eliminating Need for Duplicate EDG Testing Being Performed ML18011A8501995-03-20020 March 1995 Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR ML18011A8111995-03-0303 March 1995 Application for Amend to License NPF-63,eliminating Response Time Testing for Selected Pressure & Differential Pressure Sensors ML18022A9471995-02-0606 February 1995 Application for Amend to License NPF-63,revising TSs Re Relocation of Shutdown Margin Vs Boron Concentration ML18011A7691995-01-19019 January 1995 Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency ML18011A7411994-12-19019 December 1994 Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate Testing ML18011A7151994-12-0606 December 1994 Application for Amend to License NPF-63 to TS Re Revised TS Page Concerning Relocation of Selected TS in Accordance w/NUREG-1431 ML18011A7051994-12-0606 December 1994 Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants. ML18011A6881994-11-23023 November 1994 Application for Amend to License NPF-63 to TS Re Changes to ECCS Evaluation Model ML18011A6141994-10-24024 October 1994 Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 ML18011A5841994-09-12012 September 1994 Application for Amend to License NPF-63,revising TS3/4.8.1, AC Sources & Associated Bases 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18017A9251999-10-21021 October 1999 Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05 ML18017A8511999-08-26026 August 1999 Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0501999-08-0404 August 1999 Application for Amend to License NPF-63,revising TS to Incorporate Analytical Methodology References in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0431999-08-0202 August 1999 Application for Amend to License NPF-63,revising TS 6.2.2.e to Require Either Operations Manager or off-shift Operations Superintendent to Hold SRO License ML18016B0111999-07-0909 July 1999 Application for Amend to License NPF-63,relocating TS 3/4.3.3.3,TS 3/4.3.3.4,TS 3/4.3.3.9 & TS 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis Requirements, IAW GL 95-10 ML18016B0071999-07-0909 July 1999 Application for Amend to License NPF-63,revising TS 3/4.2.2, TS 3/4.2.3 & TS 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Processing by Implementing Guidance in GL 88-16 & NUREG-1431,Rev 1, Std TS W Plants. ML18016A9891999-06-15015 June 1999 Application for Amend to License NPF-63,revising TS to Incorporate performance-based 10CFR50 App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9761999-06-0202 June 1999 Application for Amend to License NPF-63,revising TS 6.5, Review & Audit, TS 6.8, Procedures & Program & TS 6.10, Record Retention. ML18016A8381999-02-26026 February 1999 Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl ML18016A7681998-12-23023 December 1998 Application for Amend to License NPF-63,revising TS 5.6, Fuel Storage, by Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' Non-proprietary & Proprietary Licensing Repts Encl.Proprietary Info Withheld ML18016A6031998-10-0101 October 1998 Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl ML18016A5921998-09-23023 September 1998 Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door Shut ML18016A5441998-09-0101 September 1998 Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5391998-08-27027 August 1998 Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 ML18016A5031998-08-14014 August 1998 Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months ML18016A3991998-04-24024 April 1998 Application for Amend to License NPF-63,revising TS 3/4.3.2, ESFAS Instrumentation, to Allow Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3461998-03-12012 March 1998 Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A2561997-12-16016 December 1997 Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2221997-10-29029 October 1997 Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1 ML18012A8101997-06-12012 June 1997 Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f ML18012A7841997-05-16016 May 1997 Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6341997-04-23023 April 1997 Application for Amend to License NPF-63,incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affect Specs 4.3.2.1.1.a,4.3.2.1.4.b, 4.3.2.1.6.g,4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5761997-03-17017 March 1997 Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0021997-03-14014 March 1997 Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0051997-03-10010 March 1997 Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration ML18022B0011997-02-27027 February 1997 Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld ML18012A5291997-02-18018 February 1997 Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A4981997-02-0606 February 1997 Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4941997-01-29029 January 1997 Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability ML18012A4621997-01-10010 January 1997 Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure ML18012A4491996-12-30030 December 1996 Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits ML18012A4141996-10-31031 October 1996 Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & Temp ML18012A3931996-10-0808 October 1996 Application for Amend to License NPF-63,proposing to Implement Change to Bases for TSs 3/4.6.1.4 & 3/4.6.1.6 Revising Calculated Peak Pressure for MSLB Event ML18012A3701996-09-18018 September 1996 Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure Testing ML18012A3031996-07-19019 July 1996 Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years ML18012A2511996-05-31031 May 1996 Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders ML18012A1801996-03-20020 March 1996 Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 ML18012A1411996-02-16016 February 1996 Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation ML18011A8751995-04-0505 April 1995 Application for Amend to License NPF-63,revising Portions of Section 3/4.9, Refueling Operations to Be Consistent W/ NUREG-1431 & Relocating Applicable Sections Per Commission Final Policy Statement ML18011A8721995-03-30030 March 1995 Application for Amend to License NPF-63,revising EDG SR Contained in Section 4.8.1.1.2 to Be Consistent w/NUREG-1431 New Std TS for Westinghouse Plants & Eliminating Need for Duplicate EDG Testing Being Performed ML18011A8501995-03-20020 March 1995 Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR ML18011A8111995-03-0303 March 1995 Application for Amend to License NPF-63,eliminating Response Time Testing for Selected Pressure & Differential Pressure Sensors ML18022A9471995-02-0606 February 1995 Application for Amend to License NPF-63,revising TSs Re Relocation of Shutdown Margin Vs Boron Concentration ML18011A7691995-01-19019 January 1995 Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency ML18011A7411994-12-19019 December 1994 Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate Testing ML18011A7151994-12-0606 December 1994 Application for Amend to License NPF-63 to TS Re Revised TS Page Concerning Relocation of Selected TS in Accordance w/NUREG-1431 ML18011A7051994-12-0606 December 1994 Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants. ML18011A6881994-11-23023 November 1994 Application for Amend to License NPF-63 to TS Re Changes to ECCS Evaluation Model ML18011A6141994-10-24024 October 1994 Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 ML18011A5841994-09-12012 September 1994 Application for Amend to License NPF-63,revising TS3/4.8.1, AC Sources & Associated Bases 1999-08-04
[Table view] |
Text
PRIORITY
.CE LE RATED RI DS P ROC I'.SSli G)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9501260139 DOC.DATE: 95/01/19 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power -Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION P Document Control Branch .(Document Control Desk)
R
SUBJECT:
Application for amend to'icense NPF-63,to provide for delay period in which to perform surveillance which has been discovered not to have been performed within specified frequency.
DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR g ENCL g SIZE: 0 TITLE: OR Submittal: General Distribution R
NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 6 6 LE CENTER 0 1 1 NRR/DRCH/HICB 1 1 RR/DSSA7SPLB 1 1 NRR/DSSA/SRXB 1 ~
1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D,
0i C
RECIPIENT"rs:
iNOTE To ALL"RIDS" PLEASE HELP US TO Rf DUCE ~iVASTE! COYTACT'I'IIE DOCL'ifEYTCONTROL DESK, ROONI PI-37 (EM. 504-2083 ) TO ELDER lb %TE YOUR %ANIL FRO!if Dfs rR!n U'nor Lfs'rs I oR Doc!.'wI:.i"I's'vof.'oi "I' L'ED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16 I
Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JAN 5 9 199S Letter Number: HO-950122 SERIAL: HNP-95-008 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT PERFORMANCE OF TECHNICAL SPECIFICATION SURVEILLANCES Gentlemen:
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company (CP6L) hereby requests a revision to the Technical Specifications.(TS) .for the Shearon Harris Nuclear Power Plant (SHNPP).
The proposed amendment revises TS Surveillance Requirement 4.0.3 and its associated Bases. This will provide for a delay period in which to perform a surveillance which has been discovered not to have been performed within its specified frequency. This change is an adoption of the requirements contained in NUREG-1431, "Standard Technical Specifications, Westinghouse Plants." provides a detailed description of the proposed change and the basis for the change. details, in accordance with 10 CFR 50.91(a), the basis for the Company's determination that the proposed change does not involve a significant hazards consideration. provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51 '2(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental assessment needs to be prepared in connection with the issuance of the amendment. provides page change instructions for incorporating the proposed revision. provides the proposed Technical Specification pages.
In accordance with 10 CFR 50.91(b), CP&L is providing the State of North Carolina with a copy of the proposed license amendment.
95012b013'st 'st50119 PDR ADOCK 05000400 PDR State Road 1134 New Hill NC Tel 919 362-2502 Fax 919 362-6950
Document Control Desk HNP-95-008 / Page 2 Please refer any questions regarding this submittal to Mr. D. C. McCarthy at (919) 362-2100.
Sincerely, W. R. Robinson LSR/lsr
Enclosures:
- 1. Basis for Change Request
- 2. 10 CFR 50.92 Evaluation
- 3. Environmental Considerations
- 4. Page Change Instructions
- 5. Technical Specification Pages W. R. Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power & Light Company.
&.6p40g Notary ( e 1)
My commission expires:
g $ /q~ +~S. YAy~
+u NOTARY PUSLlC c: Mr. Dayne H. Brown Mr.
Mr.
S. D. Ebneter S. A. Elrod
~ COO~~
Mr. N. B. Le
T T
II ll Pq T
V
ENCLOSURE TO SERIAL: HNP-95-008 ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT PERFORMANCE OF TECHNICAL SPECIFICATION SURVEILLANCES BASIS FOR CHANGE RE UEST
~Back round Plant Technical Specification (TS) Surveillance Requirement 4.0.3 currently specifies that the failure to perform a Surveillance within its specified time interval shall constitute a failure to meet the operability requirements for that particular system or equipment. As a result of being declared inoperable, immediate steps may be required to initiate mode changes or a plant shutdown in accordance with the applicable TS Action Statements. Such measures challenge plant systems and subject the plant to unnecessary transient conditions with their accompanying risks and operational impacts. NRC Generic Letter 87-09 acknowledged this problem; thus, changes to the Standard TS were incorporated in NUREG-1431, "Standard Technical Specifications, Westinghouse Plants."
Pro osed Chan e The proposed .amendment revises TS Surveillance Requirement 4.0.3 and its associated Bases. This will provide for a delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in which to perform a surveillance which has been discovered not to have been performed within its specified frequency. This change is an adoption of the requirements contained in NUREG-1431, "Standard Technical Specifications, Westinghouse Plants."
Basis This change will reduce the potential for unnecessarily manipulating or challenging plant systems and equipment. A delay period will permit completion of a surveillance before applying remedial steps that will preclude completion of the surveillance. As stated in the Bases to NUREG-1431, "[t]he basis for this delay period includes consideration of unit conditions, adequate planning, availability of personnel, the time required to perform the Surveillance, the safety significance of the delay in completing the required Surveillance, and the recognition that the most probable result of any particular Surveillance being performed is the verification of conformance with the requirements."
Conclusions The proposed change will not introduce any new equipment, nor will it require existing plant systems to perform a different type of function than they are currently designed to perform. The change will reduce the potential for unnecessarily manipulating or challenging the plant systems and equipment and will not result in changes to procedures which affect the operation of those plant systems. Since the design, operation, and manner in which testing is performed is unchanged, and the addition of a delay period is insignificant Page El-1
ENCLOSURE TO SERjAL: HNP-95-008 considering the probability of success of the surveillance, the accident scenarios and their resulting consequences as described in the Final Safety Analysis Report are unaffected.
Page El-2
ENCLOSURE TO SERIAL: HNP-95-008 ENCLOSURE 2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT PERFORMANCE OF TECHNICAL SPECIFICATION SURVEILLANCES 10 CFR 50.92 EVALUATION The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards determination. The bases for this determination are as follows:
Pro osed Chan e The proposed amendment revises TS Surveillance Requirement 4.0.3 and its associated Bases. This will provide for a delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in which to perform a surveillance which has been discovered not to have been performed within its specified frequency. This change is an adoption of the requirements contained in NUREG-1431, "Standard Technical Specifications, Westinghouse Plants."
Basis This change does not involve a significant hazards consideration for the following reasons:
The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed change will reduce the requirement to unnecessarily manipulate and challenge plant systems and equipment. The most probable result of performing a surveillance during the delay period will be to verify its conformance with Technical Specification requirements. Since this change does not affect plant design, operation, or the manner in which testing is performed, the consequences of accident scenarios postulated in the Final Safety Analysis Report will not increase.
Therefore, there would be no increase in the probability or consequences of an accident previously evaluated.
The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
Page E2-1
ENCLOSURE TO SERIAL: HNP-95-008 The proposed change does not introduce any new equipment, nor does it require existing systems to perform a different type of function than they are currently designed to perform. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment does not involve a significant reduction in the margin of safety.
The margin of safety is neither described or prescribed for this specification. The proposed change simply provides additional time to perform a surveillance and verify that the operability of equipment is in conformance with the Technical Specification requirements. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Page E2-2
ENCLOSURE TO SERIAL: HNP-95-008 ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT PERFORMANCE OF TECHNICAL,SPECIFICATION SURVEILLANCES ENVIRONMENTAL CONSIDERATIONS 10 CFR 51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (3) result in a significant increase in individual or cumulative occupational radiation exposure. Carolina Power & Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:
Pro osed Chan e The proposed amendment revises TS Surveillance Requirement 4.0.3 and its associated Bases. This will provide for a delay period of up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in which to perform a surveillance which has been discovered not to have been performed within its specified frequency. This change is an adoption of the requirements contained in NUREG-1431, "Standard Technical Specifications, Westinghouse Plants."
Basis The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) for the following reasons:
As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.
- 2. The proposed amendment does not result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite.
The proposed change does not introduce any new equipment, nor does it require existing systems to perform a different type of function than they are currently designed to perform. As such, the change can not affect the types or amounts of any effluents that may be released offsite.
The proposed amendment does not. result in a significant increase in Page E3-1
ENCLOSURE TO SERIAL: HNP-95-008 individual or cumulative occupational radiation exposure.
The proposed change will not result in additional work or surveillances within radiation controlled areas and will not. affect personnel radiation exposure. Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.
Page E3-2
ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT PERFORMANCE OF TECHNICAL SPECIFICATION SURVEILLANCES PAGE CHANGE INSTRUCTIONS Removed Pa e Inserted Pa e 3/4 0-2 3/4 0-2 B 3/4 0-2 B 3/4 0-2 B 3/4 0-2a B 3/4 0-2a