MONTHYEARML0603704632006-02-0909 February 2006 RAI, Response to GL-2004-02, Potential Impact to Debris Blockage on Emergency Recirculation During Design-Basis Accidents at Pressurized-Water Reactors. Project stage: RAI ML0721205432007-08-0909 August 2007 Draft Open Items from Staff Audit of Corrective Actions to Address GL 2004-02 Project stage: Draft Other ML0729706052007-10-24024 October 2007 Exigent License Amendment Request Re Alternative Containment Analysis Methodology Supporting Information - Gothic Model Input Files Project stage: Other ML0727404002007-11-15015 November 2007 Corrective Actions for Generic Letter 2004-02 Project stage: Acceptance Review ML0731001672007-11-15015 November 2007 Report on Results of Staff Audit of Corrective Actions to Address Generic Letter 2004-02 Project stage: Other ML0731905532007-11-15015 November 2007 North Anna, Units 1 and 2, and Surry, Units 1& 2, Request for Extension of Completion Dates for Corrective Actions Regarding NRC Generic Letter 2004-02 Project stage: Request ML0734505942007-12-13013 December 2007 Approval of Extension of Completion Dates for Corrective Actions of Generic Letter 2004-02 Project stage: Other ML0806503142008-02-29029 February 2008 Kewaunee, NRC Generic Letter 2004-02 Supplemental Response, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806505622008-02-29029 February 2008 Supplemental Response to NRC GL-2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0806505632008-02-29029 February 2008 Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Project stage: Request ML0814207932008-05-21021 May 2008 North Anna, Units 1 and 2, and Surry, Units 1 & 2, NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors Request.. Project stage: Request ML0814306122008-05-22022 May 2008 Units 1 & 2 - NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors Request for Interim. Project stage: Request ML0814905722008-05-29029 May 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0818302472008-07-0101 July 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other ML0821301802008-08-0404 August 2008 Audit Report of Corrective Actions for Generic Letter 2004-02 Project stage: Other ML0825404952008-09-0505 September 2008 North Anna and Surry Power Station, Units 1 and 2, NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Accidents at Pressurized-water Reactors Request for Extension of Completion Dates for Corrective Actions Project stage: Request ML0827300222008-09-29029 September 2008 Request for Extension of Completion Dates for Generic Letter 2004-02 Corrective Actions Project stage: Other 2008-05-21
[Table View] |
|
---|
Category:Letter
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24206A0052024-08-0808 August 2024 SLR Final EIS Letter to Achp ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24241A0692024-08-0606 August 2024 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000338/20240022024-08-0202 August 2024 Integrated Inspection Report 05000338/2024002 and 05000339/2024002 ML24206A0432024-07-26026 July 2024 Feis - Letter to the Applicant 05000338/LER-2024-001, Automatic Reactor Trip Due to Prni High Negative Rate2024-07-25025 July 2024 Automatic Reactor Trip Due to Prni High Negative Rate ML24206A0902024-07-24024 July 2024 Owners Activity Report ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1462024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 05000339/LER-2024-001, Loss of Generator Field for 2J EDG During 2-PT-82.282024-06-0505 June 2024 Loss of Generator Field for 2J EDG During 2-PT-82.28 IR 05000338/20240012024-05-10010 May 2024 Integrated Inspection Report 05000338/2024001 and 05000339/2024001 IR 05000338/20244032024-04-30030 April 2024 – Security Baseline Inspection Report 05000338-2024403 and 05000339-2024403 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24110A1502024-04-18018 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24110A1392024-04-18018 April 2024 Annual Environmental Operating Report ML24110A1462024-04-18018 April 2024 Independent Spent Fuel Storage Installation (Sfsi) - Annual Radiological Environmental Operating Report ML24087A0572024-04-16016 April 2024 Correction to Issuance of Amendment Nos. 296 and 279 ML24088A2692024-03-27027 March 2024 Core Operating Limits Report Cycle 31 Pattern Sos Revision 0 2024-09-24
[Table view] |
Text
August 4, 2008 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNIT NO 2, AUDIT REPORT OF CORRECTIVE ACTIONS FOR GENERIC LETTER 2004-02 (TAC NO. MC4697)
Dear Mr. Christian:
The U. S. Nuclear Regulatory Commission (NRC) audited Virginia Electric and Power Companys (the licensees) North Anna Power Station, Unit No. 2 corrective actions for Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors [PWRs], during July, 2007. The purpose of the audit was to verify that the implementation of Generic Safety Issue (GSI) 191, Assessment of Debris Accumulation on PWR Sump Performance sump strainer and related modifications bring North Anna 2 and similar plants into full compliance with Title 10 of the Code of Federal Regulations, Section 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors, and related requirements, and to draw conclusions as to the probable overall effectiveness of GL 2004-02 corrective actions for the U. S. operating PWRs.
The subject audit report is enclosed to the licensee and was made public on November 19, 2007, and can be accessed via NRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML072740400. Please note that this audit report does not reach a conclusion regarding overall adequacy of the licensees GL 2004-02 corrective actions.
Sincerely,
/RA/
Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-339
Enclosure:
Audit Report cc w/o encl: See next page
August 4, 2008 Mr. David A. Christian President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNIT NO 2, AUDIT REPORT OF CORRECTIVE ACTIONS FOR GENERIC LETTER 2004-02 (TAC NO. MC4697)
Dear Mr. Christian:
The U. S. Nuclear Regulatory Commission (NRC) audited Virginia Electric and Power Companys (the licensees) North Anna Power Station, Unit No. 2 corrective actions for Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors [PWRs], during July, 2007. The purpose of the audit was to verify that the implementation of Generic Safety Issue (GSI) 191, Assessment of Debris Accumulation on PWR Sump Performance sump strainer and related modifications bring North Anna 2 and similar plants into full compliance with Title 10 of the Code of Federal Regulations, Section 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors, and related requirements, and to draw conclusions as to the probable overall effectiveness of GL 2004-02 corrective actions for the U. S. operating PWRs.
The subject audit report is enclosed to the licensee and was made public on November 19, 2007, and can be accessed via NRC Agencywide Documents Access and Management System (ADAMS) Accession No. ML072740400. Please note that this audit report does not reach a conclusion regarding overall adequacy of the licensees GL 2004-02 corrective actions.
Sincerely,
/RA/
Siva P. Lingam, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-339
Enclosure:
Audit Report cc w/o encl: See next page DISTRIBUTION:
PUBLIC RidsNrrLAMO=Brien (hard copy) RidsNrrDssSsib(MScott)
LPL2-1 R/F RidsOgcRp RidsNrrDssSsib(JGolla)
RidsNrrDorlLpl2-1 (MWong) RidsAcrsAcnw&mMailCenter RidsNrrDssSsib(RArchitzel)
RidsNrrPMSLingam RidsRgn2MailCenter (MBates)
ADAMS Package No. ML082170207 ADAMS Document No. ML082130180 ADAMS Audit Report No.: ML072740400 *tranmitted by memo dated NRR-106 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA DSS/SSIB/BC NRR/LPL2-1/BC NAME SLingam GLappert MScott RMartin for MWong DATE 08/04/08 08/04/08 11/15/07* 08/04/08 OFFICIAL RECORD COPY
North Anna Power Station, Units 1 & 2 Page 1 of 2 08/05/2008 cc:
Mr. David A. Christian Mr. Daniel G. Stoddard President and Chief Nuclear Officer Site Vice President Dominion Nuclear North Anna Power Station Virginia Electric and Power Company 1022 Haley Drive Innsbrook Technical Center Mineral, VA 23117 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Dr. Robert B. Stroube, MD, MPH State Health Commissioner Mr. C. Lee Lintecum Office of the Commissioner County Administrator Virginia Department of Health Louisa County Post Office Box 2448 Post Office Box 160 Richmond, Virginia 23218 Louisa, Virginia 23093 Mr. Mark D. Sartain, Director Ms. Lillian M. Cuoco, Esq. Nuclear Safety & Licensing Senior Counsel Virginia Electric and Power Company Dominion Resources Services, Inc. North Anna Power Station 120 Tredegar Street, RS-2 P.O. Box 402 Richmond, VA 23219 Mineral, VA 23117 Dr. W. T. Lough Mr. Eugene S. Grecheck, Vice President Virginia State Corporation Commission Nuclear Development Division of Energy Regulation Innsbrook Technical Center Post Office Box 1197 5000 Dominion Boulevard Richmond, Virginia 23218 Glenn Allen, VA 23060-6711 Old Dominion Electric Cooperative Mr. Marvin L. Smith, Project Director 4201 Dominion Blvd. Innsbrook Technical Center Glen Allen, Virginia 23060 5000 Dominion Boulevard Glenn Allen, VA 23060-6711 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Mr. Timothy Maddy Dominion Resources Services, Inc. Manager Nuclear Protection Services Innsbrook Technical Center North Anna Power Station 5000 Dominion Blvd. 1022 Haley Drive Glen Allen, Virginia 23060-6711 Mineral, VA 23117 Office of the Attorney General Mr. Page Kemp Commonwealth of Virginia Supervisor Nuclear Engineering 900 East Main Street North Anna Power Station Richmond, Virginia 23219 1022 Haley Drive Mineral, VA 23117 Senior Resident Inspector North Anna Power Station Ms. Leslie N. Hartz, Vice President U. S. Nuclear Regulatory Commission Nuclear Support Services P. O. Box 490 Innsbrook Technical Center Mineral, Virginia 23117 5000 Dominion Boulevard Glen Allen, VA 23060-6711
Page 2 of 2 Mr. Nelson K. Martin Manager Nuclear Fleet Protection Services Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711