MONTHYEARML0826006582008-09-16016 September 2008 Draft Request for Additional Information - Relief Request 2 - Weld Overlay of Dissimilar Metal Welds Project stage: Draft RAI ML0826006252008-09-16016 September 2008 Draft Request for Additional Information on Relief Request No. 2 Regarding Structural Weld Overlays Project stage: Draft RAI ML0826105072008-09-18018 September 2008 Request for Additional Information on Relief Request for Structural Weld Overlays Project stage: RAI ML0829605462008-11-0303 November 2008 Safety Evaluation of Relief Request to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal Welds Project stage: Approval ML0831506402008-11-19019 November 2008 Corrected Page to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal Welds Project stage: Other ML0835406262008-12-24024 December 2008 Corrected Page to Safety Evaluation of Relief Request to Use Structural Weld Overlay and Alternative Examination Techniques on Safe End Dissimilar Metal Welds Project stage: Approval 2008-12-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 November 19, 2008 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 SLlB..IECT: ST. LUCIE, UNIT 1 - CORRECTED PAGE TO SAFETY EVALUATION OF RELIEF REQUEST TO USE STRUCTURAL WELD OVERLAY AND ALTERNATIVE EXAMINATION TECHNIQUES ON SAFE END DISSIMILAR METAL WELDS (TAC NO. MD9256)
Dear Mr. Stall:
On November 3, 2008, the U.S. Nuclear Regulatory commission (NRC) authorized an alternative to the repair requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, for St. Lucie, Unit 1. The alternative uses a full structural weld overlay with temper bead welding for repair and the Performance Demonstration Initiative program for inspection as alternatives to the requirements of ASME Code,Section XI.
Subsequently, the St. Lucie licensing staff informed the NRC staff of statements in need of clarification in the safety evaluation (SE) supporting the relief request. Specifically, the discussion of delta ferrite measurements also mentions the alloys ER308L and ER309L, although they are not used as filler material in the subject overlays.
The NRC staff reviewed these comments and agreed that the SE should be corrected. The NRC staff also concluded that the changes correct inaccuracies or misstatements in the SE, but do not change the technical evaluation or conclusions of the SE. The enclosed SE page 9 corrects the error and is annotated to show the correction. The page previously issued with the amendment should be replaced with the enclosed page.
We appreciate the constructive input from the St. Lucie licensing staff and apologize for any inconvenience resulting from the changes.
Sincerely,
~ ()r I 'fJ ,\,ld
...,:::>~ el(t.v t ,W t'lv~&' r.\L Brenda L. Mozafari, Senior oject Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 50-335
Enclosure:
Revised SE page cc w/enclosure: Distribution via ListServ
-9 years on piping of both boiling and pressurized-water reactors to inhibit the growth of flaws while establishing a new structural pressure boundary. The SWOLs will control growth in PWSCC flaws and maintain weld integrity by producing compressive stress in the DMW. The full SWOLs will be sized to meet all structural requirements independent of the existing weld and will produce a favorable surface for UT examination. Due to their close proximity adjacent SS safe end-to-piping SMW will be incorporated into the area of the weld overlay.
4.1 General Requirements ASIVIE Code Case N-504-3 and Nonmandatory Appendix Q (a contingent requirement of Code Case N-504-3 in accordance with RG 1.147, Revision 15) of ASME Code Section XI, require certain specification and surface conditions of the applicable base metal (LAS, CS, SS, and Alloy 82/182), the weld overlay filler metal (Alloy 52M) and the Cr content of weld overlay deposits. Section 1 of Attachment 2 to RR-2, Rev. 1, provides corresponding requirements, with modifications. FPL will deposit a barrier layer of ER308L or ER309L SS filler metal on the base metal prior to weld overlay as a contingency for preventing possible hot cracking, which may result from high sulfur content in austenitic SS base material. The tendency of certain metals to exhibit hot cracking is caused by the segregation at grain boundaries of low-melting constituents (e.g., sulfur) in the weld metal. This may result in grain-boundary tearing under thermal contraction stresses. Hot cracking may be minimized by employing low impurity welding metals.
FPL stated that a SS barrier layer of alloy ER308L or ER309L, will be utilized over the appropriate base materials due to the uncertainty in establishing impurity thresholds for successful Alloy 52M SWOLs. FPL also stated that the proposed SWOL design does not take structural credit for the buffer/barrier weld layer. FPL will install the barrier layer on the austenitic SS pipe and safe end only and stop short of the Alloy 82/182 weld material. The final tie-in to the existing nickel Alloy 82/182 weld may be performed with nickel Alloy 82 weld metal. Welding over the nickel base ENiCrFe-3 (Alloy 182) joint with an iron based ER308L or ER309L electrode may cause cracking in the SS barrier layer.
FPL stated further that the SS barrier layer will be deposited with a welding procedure that has been qualified in accordance with the ASME Code,Section IX. Liquid penetrant (PT) examinations will be performed on the barrier layer surface and its volume will be included in the final UT of the overlay.
Delta ferrite (FN) measurements are not required per Attachment 2 of RR-2, Rev. 1, for weld overlay repairs made of Alloy 52/52M weld metal. Welds of Alloy 52/52M are 100 percent austenitic and contain no delta ferrite due to their high nickel composition (approximately 60 percent nickel). FPL's vendor performed a mockup and the chromium (Cr) content of the first overlaid layer was verified at the 24 percent minimum Cr value specified in accordance with Section 1(e) of Attachment 2 to RR-2, Rev. 1. Furthermore, FPL states that the same heat number of weld wire and welding parameters used in qualification welding for the mockup first overlaid layer will be used for the first overlaid layer of the production SWOLs.