ML100620900

From kanterella
Revision as of 22:18, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Enclosure - Hatch Inspection/Activity Plan Report 22, 2009
ML100620900
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/03/2010
From:
Division Reactor Projects II
To:
Southern Nuclear Operating Co
Shared Package
ML100620893 List:
References
IR-10-001
Download: ML100620900 (2)


Text

Page 1 of 2 Hatch 03/03/2010 07:08:35 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RAD HAZARD ASSESSMENT & EXPOSURE CONTROL 2 1, 2 03/01/2010 03/05/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls TI-180 - TI-180 MANAGING FATIGUE 2 1, 2 03/08/2010 03/12/2010 IP 2515/180 Inspection of Procedures and Processes for Managing Fatigue EB3 HS - HEAT SINK INSPECTION 1 1, 2 04/12/2010 04/16/2010 IP 7111107T Heat Sink Performance EB1-MODS - MODIFICATIONS-10CFR50.59 3 1, 2 05/03/2010 05/07/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 05/10/2010 05/14/2010 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications PSB1-RP - RP GROUNDWATER PROTECTION 1 1, 2 05/17/2010 05/21/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative OL RQ - REQUAL INSPECTION 5 1, 2 09/20/2010 09/24/2010 IP 7111111B Licensed Operator Requalification Program PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 10/18/2010 10/22/2010 IP 7111402 Alert and Notification System Evaluation 1, 2 10/18/2010 10/22/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1, 2 10/18/2010 10/22/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 10/18/2010 10/22/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 10/18/2010 10/22/2010 IP 71151 Performance Indicator Verification TFPI - TFPI 7 1, 2 11/15/2010 11/19/2010 IP 7111105T Fire Protection [Triennial]

1, 2 11/29/2010 12/03/2010 IP 7111105T Fire Protection [Triennial]

PSB1-RP - RP OCCUPATIONAL WEEK 1 3 1, 2 02/28/2011 03/04/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/28/2011 03/04/2011 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/28/2011 03/04/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 02/28/2011 03/04/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 02/28/2011 03/04/2011 IP 71151 Performance Indicator Verification PSB1-RP - RP-OCCUPATIONAL WEEK 2 2 1, 2 03/14/2011 03/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/14/2011 03/18/2011 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/14/2011 03/18/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/14/2011 03/18/2011 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/14/2011 03/18/2011 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Hatch 03/03/2010 07:08:35 Inspection / Activity Plan Report 22 03/01/2010 - 06/30/2011 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 04/11/2011 04/15/2011 IP 7111108G Inservice Inspection Activities - BWR OL EXAM - INITIAL EXAM PREP 3 1 05/16/2011 05/20/2011 V23345 HATCH/JUNE 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 3 1 06/06/2011 06/10/2011 V23345 HATCH/JUNE 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 3 1 06/13/2011 06/24/2011 V23345 HATCH/JUNE 2011 EXAM AT POWER FACILITIES This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure