Notification of Licensed Operator Initial Examination - 05000369-11-301 & 05000370-11-301
ML110610797
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/01/2011
From: Widmann M
Division of Reactor Safety II
To: Repko R
Duke Energy Carolinas
References
IR-11-301
Download: ML110610797 (5)


See also: IR 05000369/2011301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

March 1, 2011

Mr. Regis T. Repko, Vice President

Duke Energy Carolinas, LLC

McGuire Nuclear Station

MG01VP/12700 Hagers Ferry Road

Huntersville, NC 28078

SUBJECT: MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION - 05000369/2011301 AND 05000370/2011301

Dear Mr. Repko:

In a telephone conversation on February 1, 2011, between Mr. Fred Kirk, NRC Exam Team

Lead and Mr. Edwin Lea, Senior Operations Engineer, arrangements were made for the

administration of licensing examinations at McGuire Nuclear Station. The operating test is

scheduled to be administered during the week of June 27, 2011. The written examination is

scheduled to be administered the week of July 4, 2011. The on-site preparatory week is

scheduled for the week of May 23, 2011.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by March 28, 2011. The written examination outline was provided to your staff in

December 2010. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by April 29, 2011. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

DPC 2

Appendix E of NUREG-102, contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on February

28, 2013. The public reporting burden for this collection of information is estimated to average

500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response for examinations prepared by the facility, including the time for

reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments on any aspect of this collection of

information, including suggestions for reducing the burden, to the Information and Records

Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-

0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer,

Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management

and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Kirk has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Lea at (404) 997-4567, (Internet E-mail:

Edwin.lea@nrc.gov), or me at (404) 997-4550, (Internet E-mail: Malcolm.widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-369, 50-370

License Nos.: NPF-9, NPF-17

cc: See Page 3

DPC 3

cc w/encl: Kathryn B. Nolan

Steven D. Capps Senior Counsel

Station Manager Duke Energy Corporation

Duke Energy Carolinas, LLC 526 South Church Street-EC07H

Electronic Mail Distribution Charlotte, NC 28202

Peter Schuerger David A. Repka

Training Manager Winston Strawn LLP

Duke Energy Carolinas, LLC Electronic Mail Distribution

Electronic Mail Distribution

County Manager of Mecklenburg County

C. Jeff Thomas 720 East Fourth Street

Fleet Regulatory Compliance & Licensing Charlotte, NC 28202

Manager

Duke Energy Carolinas, LLC W. Lee Cox, III

Electronic Mail Distribution Section Chief

Radiation Protection Section

Kenneth L. Ashe N.C. Department of Environmental

Regulatory Compliance Manager Commerce & Natural Resources

Duke Energy Carolinas, LLC Electronic Mail Distribution

Electronic Mail Distribution

David A. Baxter

Lara Nichols Vice President, Nuclear Engineering

Associate General Counsel Duke Energy Carolinas, LLC

Duke Energy Corporation

Electronic Mail Distribution

ML110610797 X SUNSI REVIEW COMPLETE

OFFICE RII: DRS/OL RII: DRS/OL RII: DRP/BR1

SIGNATURE RA RA RA

NAME E. LEA M. WIDMANN J. BARTLEY

DATE 03/01/2011 03/01/2011 03/01/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

DPC 4

Letter to Regis T. Repko from Malcolm T. Widmann dated March 1, 2011.

SUBJECT: MCGUIRE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION - 05000369/2011301 AND 05000370/2011301

Distribution w/encl:

C. Evans, RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas)

OE Mail (email address if applicable)

RIDSNRRDIRS

PUBLIC

RidsNrrPMMcGuire Resource