MONTHYEARIR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 L-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) 2024-09-06
[Table view] |
Text
November 4, 2011 Cynthia Pederson, Regional Administrator (Acting)
U.S. Nuclear Regulatory Commission Region III 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Via email to Cynthia.Pederson@nrc.gov
SUBJECT:
Conditional Allegation - Shield Building Design at Davis-Besse
Dear Ms Pederson:
The purpose of this letter is to ask questions concerning the design evaluation and analysis of the shield building at the Davis-Besse nuclear plant. However, if the NRCs processes cannot support answering these questions before the plant restarts, please treat them as allegations.
BACKGROUND Updated Final Safety Analysis Report (UFSAR) section 3.8.2.2 summarizes the design and associated analyses for the shield building. UFSAR section 3.8.2.2.2 states that dead loads were considered in the shield building design. UFSAR section 3.8.2.2.4 states that the dead loads included concrete (143 pounds per square foot) and steel reinforcing (489 pounds per square foot).UFSAR section 3.8.2.3.7 states that Cement for all concrete except the Shield Building is Type II low alkali cement The Shield Building has Type I cement above grade.UFSAR Figure 3.8-3 (left) illustrates a typical section of the containment vessel and shield building.
The NRCs PNO-III-11-014 (ML11293A092) dated October 20, 2011 stated:
The reactor vessel closure head is bolted on top of the reactor vessel which is located inside a 1.5 inch thick steel containment vessel surrounded by a 2.5 foot thick free-standing, reinforced concrete, shield building. The majority of the shield building vertical exterior has additional non-structural, architectural concrete up to 1.5 foot thick separated by grooves.
November 4, 2011 Page 2 of 3 This plan diagram (overhead view) of a section of the shield building wall shows the non-structural, architectural concrete referred to in the NRCs PNO. As indicated by the two fish-hook shaped devices in the drawing, the attachments are anchored to the shield building wall.
The media has reported that numerous cracks in the non-structural, architectural concrete have been identified. The NRC PNO stated If there are any challenges identified to the design function of the shield building they will have to be resolved before the plant restarts.
QUESTIONS
- 1. The non-structural, architectural concrete elements do not appear in UFSAR Figure 3.8-3. The plan diagram indicates these elements are connected to the shield building wall. Are the dead loads from these concrete elements properly considered in the design analyses of the shield building?
- 2. The UFSAR does not explicitly describe these non-structural, architectural concrete elements. Thus, it is not clear if these elements have Type II concrete or Type I cement as explained in UFSAR section 3.8.2.3.7. What type of cement was used in the non-structural, architectural concrete?
- 3. If the concrete/cement in the shield building is the same as that in the non-structural, architectural concrete elements and all have the same age and environmental exposure history, would numerous cracks identified in one suggest comparable conditions in the other? If not, why not?
UCS realizes that UFSAR Figure 3.8-3 is a simplified drawing and the design analysts hopefully used the more detailed civil/structural arrangement drawings, but it is prudent to check to verify
November 4, 2011 Page 3 of 3 it. Recall that the NRC team conducting the design inspection at the DC Cook nuclear plant in summer 1997 found that design analysts had failed to consider a wall inside containment that caused their calculations of water inventory available during the recirculation phase of an accident to be significantly non-conservative. Holes had to be cut through that wall to assure that adequate water inventory would be available.
UCS also understands that the numerous cracks, even if also within the shield buildings walls, do not in themselves demonstrate that the design function has been compromised. But theres little reason that numerous cracking found in the non-structural, architectural concrete would not also be found in the shield building concrete unless (a) a different type of concrete was used, or (b) no one looked at the shield building concrete.
CONDITIONAL ALLEGATIONS UCS would prefer that the NRC answer the questions above before Davis-Besse restarts. But we realize that the NRC may lack the process and means to do so. If that is the case, please consider the following two items with the agencys allegations program:
- 1. The design evaluation and analysis for the shield building did not properly consider the dead load from the non-structural, architectural concrete attached to it.
- 2. The shield building wall was not sufficiently examined for indication of cracking.
Sincerely, David Lochbaum Director, Nuclear Safety Project PO Box 15316 Chattanooga, TN 37415 (423) 468-9272, office (423) 488-8318, cell