Request for Withholding Information from Public Disclosure, 8/1/2011 Affidavit Executed by Andrew A. Lingenfelter, Gnf, for Attachment 3 to GNRO-2011/00064
ML120720641
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/20/2012
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME7531
Download: ML120720641 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 20, 2012 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. ME7531)

Dear Sir or Madam:

By letter dated October 28, 2011, you submitted an affidavit dated August 1, 2011, executed by Andrew Lingenfelter, Global Nuclear Fuels - Americas LLC (GNF-A), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

Attachment 3 to GNRO-2011/00064, "GNF S-0000-0136-7814 RO-P, Revision 0, GNF Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR [Safety Limit Minimum Critical Power Ratio], Grand Gulf Cycle 19 Extended Power Uprate," GNF Proprietary Information - Class III (Confidential)

A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML11306A064. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies.
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

-2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions, please contact me at 301-415-1445 or via e-mail at alan.wang@nrc.gov.

Sincerely, Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Andrew Lingenfelter Vice President, Fuel Engineering Global Nuclear Fuel - Americas LLC 3901 Castle Hayne Rd.

Wilmington, NC 28401

-2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions, please contact me at 301-415-1445 or via e-mail at alan.wang@nrc.gov.

Sincerely, IRA!

Alan Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416 cc: Andrew Lingenfelter Vice President, Fuel Engineering Global Nuclear Fuel - Americas LLC 3901 Castle Hayne Rd.

Wilmington, NC 28401 DISTRIBUTION:

PUBLIC LPLIV rlf RidsAcrsAcnw_MailCTR Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMGrandGulf Resource RidsOgcRp Resource RidsRgn4MailCenter Resource NRRllPl4/PM RllPl4/LA NRRlDSS/SXRBIBC NRRllPl4/BC AWang AUlses MMarkley (lWilkins for) 3119/12 3/20/12 OFFICIAL RECORD COpy