Notification of Schedule Commitment Change, Implementation of Order EA-11-268
ML12359A021
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/20/2012
From: Thurman P
ZionSolutions
To:
Document Control Desk, NRC/FSME
References
EA-11-268
Download: ML12359A021 (3)


Text

ZIONSOLUTIONSLLC An EnrgySolutionsCompany December 20, 2012 ZS-2012-0521 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

Notification of Schedule Commitment Change - Implementation of Order EA- 11-268 at Zion Nuclear Power Station

References:

1) Daniel H. Dorman, Acting Director, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, letter to John A. Christian, President, ZionSolutions, LLC, "Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Zion Nuclear Power Station Independent Spent Fuel Storage Installation," dated December 20, 2011
2) Letter from Patrick Thurman, ZionSolutions, LLC, "Response to NRC Order EA-1 1-268, Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Zion Nuclear Power Station Independent Spent Fuel Storage Installation," dated January 10, 2012 This letter notifies the NRC of a change in ZionSolutions, LLC's (ZS's) schedule commitment for implementation of the subject NRC Order EA-i 1-268 (Reference 1).

On January 10, 2012, ZS responded to the Order (Reference 2) providing an estimated completion date for the Independent Spent Fuel Storage Installation (ISFSI) construction of December 2012, with the transfer of spent fuel and Greater-Than Class C (GTCC) low level waste from Zion Nuclear Power Station to the ISFSI set to occur in February 2013. Additionally, ZS stated that draft procedures and plans would be available by December 20, 2012 to demonstrate compliance with Attachment 1 and 2 of the Order.

Subsequent to ZS's January 10, 2012 response to the Order, ZS's ISFSI construction and spent fuel/GTCC waste transfer schedules have been delayed. Because of this schedule adjustment, draft procedures and plans necessary to demonstrate ZS's ability to comply with the Order have also been delayed. ZS will implement the provisions of the Order as part of the ISFSI security plan implementation in advance of ISFSI operations. Currently, ZS's acceptance and NRC's inspection of the ISFSI security program and systems is scheduled for mid-2013. The draft procedures and plans necessary to demonstrate compliance with the Order will be available within a reasonable time prior to support these NRC inspection activities and well in advance of 101 Shiloh Boulevard, Zion

  • IL 60099 (224) 789-4016
  • Fax: (224) 789-4008
  • www.zionsolutionscompany.com

ZionSolutions, LLC ZS-2012-0521 Page 2 of 2 the first spent fuel dry cask storage canister being placed on the ISFSI pad. Full implementation of these procedures and plans will be completed before placing the first spent fuel dry cask canister on the pad.

In accordance with 10 CFR 72.4, ZS is notifying the State of Illinois of this response to NRC Order EA-1 1-268 by transmitting a copy of this letter to the designated State Official.

Please contact myself at 224-789-4041 or Mr. Donald Beckman at 702-278-7312 should you have any questions about this letter.

Respectfully, Pa ick S. Thurman, Esq.

Vce President Regulatory Affairs ZionSolutions, LLC cc: John Hickman, U.S. NRC Senior Project Manager L. Raynard Wharton, U.S. NRC Senior Project Manager Service List

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Patrick T. Daly Thomas Magette Senior VP and General Manager Senior VP Nuclear Regulatory Strategy ZionSolutions, LLC EnergySolutions 101 Shiloh Boulevard 6350 Stevens Forest Road, Ste. 2000 Zion, IL 60099 Columbia, MD 21046 Patrick Thurman, Esq. Russ Workman VP Regulatory Affairs, Licensing & General Counsel Document Control EnergySolutions ZionSolutions, LLC 423 West 300 South, Ste. 200 101 Shiloh Boulevard Salt Lake City, UT 84101 Zion, IL 60099 Illinois Department of Nuclear Safety Gary Bouchard Office of Nuclear Facility Safety VP Engineering, Ops & Nuclear Security and 1035 Outer Park Drive Decommissioning Plant Manager Springfield, IL 62704 ZionSolutions, LLC 101 Shiloh Boulevard Kent McKenzie Zion, IL 60099 Emergency Management Coordinator Lake County Emergency Management Alan Parker Agency President Projects Group 1303 N. Milwaukee Avenue EnergySolutions Libertyville, IL 60048-1308 1009 Commerce Park Drive, Ste. 100 Oak Ridge, TN 37830 Regional Administrator U.S. NRC, Region III John Christian 2443 Warrenville Road President of Logistics, Processing and Lisle, IL 60532-4352 Disposal (LP& D) Group EnergySolutions John E. Matthews 1750 Tysons Boulevard, Suite 1500 Morgan, Lewis & Bockius LLP Mclean, VA 22102 1111 Pennsylvania Avenue, NW Washington, DC 20004