Application for Amend to License NPF-21,revising Tech Spec Tables 3.3.3-1,3.3.3-2 & 4.3.3.1-1 Re HPCS Pump Discharge Pressure High Signal.High Discharge Signal Will Be Replaced W/Pump Breaker Running Input.Fee Paid
ML17277B634
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/27/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17277B635 List:
References
GO2-85-098, GO2-85-98, TAC-56945, NUDOCS 8503060422
Download: ML17277B634 (8)


Text

REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

ACCESSION NBRo8503060rl22 DOC;DATE: 85/02'/27 NOTARIZED'O DOCKET' FACIL:50"397 BYNAME NPPSS Nuclear Projects Unit 2'r Hashi.ngton,Public'owe'5000397 AUTH AUTHOR AFFILIATION SORENSEN<G.C, Hashington Public Power Supply System RECIP,NAME RECIPIENT AFFILIATION SCHHENCERgA ~ Licensing Branch 2 SUBJECT! Application for amend to License,NPF discharge 21irevising Tech'pec Tables 3 ',3-iran.3,3-2 8 4.3,3.1 1,re: HPCS pump discharge pressure high signal, High -signal will be re>laced w/pump. breaker running input Fee paid.

DISTRIBUTION CODE: A001D COPIES RECEIyED:LTR j'NCL. SIZE;-

~ +9 TITLE': OR Submittal: General Distr ibution NOTES: 05000397 OL:12/20/83 RECIPIENT COPIES RECIPIENT'D "COPIES ID CODE/NAME- LTTR ENCL CODE/NAME LTTR~ ENCL" NRR LB2 BC 01* 7 7 INTERNAL: ACRS ELD/HDS2 09 6, 1

6 0

ADM/LFMB NRR/DE/MTEB-1 1

0 1

NRR/DL D IR 1 1 NRR/DL/DRAB 1 0 NRR/DL/TSRG 1 1 N TB, 1 1 NRR/DSI/RAB 1 1 F L 04 1 1

'GN5 1 1

.EXTERNAL: LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 gkedc, 4 !ho

.'Q'799

~

TOTAL NUMBER OF COPIES REQUIRED! LTTR 26 ENCL 23

J

'

fI t 'I gi t

'

I

Washington Public Power Supply System P.O. Box 968 3000 George Washington Way Richland, Washington 99352 (509) 372-5000 February 27, 1985 G02-85-098 Docket No. 50-397 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dea'r Mr. Schwencer:

Subject:

NUCLEAR PLANT NO. 2 OPERATING LICENSE NPF-21, RE(UEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS FOR HPCS PUMP DISCHARGE PRESSURE - HIGH SIGNAL (TABLES 3.3. 3-1, 3.3. 3-2, AND 4.3.3. 1-1)

In accordance with the Code of Federal Regulations (CFR), Title 10, Parts 50.90 and 2. 101, the Supply System hereby requests an amendment to the subject Technical Specifications.

The Technical Specifications as presently written (see attached pages) contain the requirement to perform a monthly Channel Functional Test and an annual (during refueling outage} Channel Calibration on the Pump Discharge Pressure-High (pump running) instrumentation. The present HPCS design incorporates minimum flow valve logic based on concurrent conditions of high pump discharge pressure'and low system flow. The pressure switch which provides the high discharge pressure (pump running) input takes its signal downstream of the pump 'discharge check valve.

Consequently, upon securing the pump following closure of the test flow path, high pressure can be trapped downstream of the check valve and result in the minimum flow valve remaining open with the pump off. This necessitates,depressurizing the system to close the valve.

This amendment seeks to replace the high discharge signal with a pump running input taken from the pump breaker. Thus, the valve would open on low flow and breaker closed (pump running) and would close on high flow'or wi th the breaker open. With this design enhancement, the pump discharge pressure-high signalwould no longer be used or needed.

p~O

) lpga g0l (j7 85030 60422 850227 PDR ADOCg 05PPP3/7 PDR P

C

~

ll J,

~ A

A. Schwencer Page Two February 27, 1985 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS FOR HPCS PUMP DISCHARGE PRESSURE-HIGH SIGNAL The Supply System has determined that the deletion of the signal sur-veillance from the Technical Specifications and non-reinsertion of the verification of breaker performance will not result in any decreased safety significance or system reliability. This is due to the fact that this action eliminates drift and calibration errors associated with instrumentation and their attendant failure modes. Actuation of the system itself is being made even more affirmative from the standpoint of signal reliability; that is, the proposed pump logic is a positive

'ndication of the pump breaker position and will automatically reflect the status of the HPCS pump without any of the problems associated with instrument channels. Furthermore, the pump minimum flow logic will be functionally verified during the HPCS Pump Quarterly Operability Test as well as during the 18 month Logic System Functional Test.

The Supply System has reviewed this change per 10CFR50.59 and determined that'o unreviewed safety questions will result from this amendment.

The Supply System has reviewed this change per 10CFR50.92 and determined that it does not:

1} Involve a significant increase in the probability or consequences of an accident previously evaluated because replacing an instrument signal with a non-instrumented signal does not degrade the HPCS system's ability to perform following an accident nor does it degrade the system pressure boundary; or 2} Create the possibility of a new or different kind of accident than previously, evaluated because the post accident ECCS function of the system will not be affected or 3} Involve a significant reduction in a margin of safety

-because the proposed change will have no effect on the ability of the HPCS system to meet its associated ECCS injection functions.

The Supply System has evaluated this request in accordance with the criteria contained in 10CFR170.21, and has included a warrant for one hundred fifty dollars ($ 150.00} as initial payment for this application for amendment under Facility'ategory A (Power Reactors}. In accordance with 10CFR50.91, the State of Washington has been provided a copy of this letter.

~.

~ ~

I

$

I

A. Schwencer Page Three February 27, 1985 REQUEST FOR AMENDMENT TO TECHNICAL SPECIFICATIONS FOR HPCS PUMP DISCHARGE PRESSURE-HIGH SIGNAL The Supply System would like to make this modification during the M3 Outage, presently scheduled to begin April 15, 1985, and expected to have a duration of approximately 60 days. This would require NRC approval to be accomplished no later than May 15, 1985, but preferably May 1 ln order to allow for a two week early startup. Should you have any questions, please contact Mr. P. L-. Powell, Manager, HNP-2 Licensing.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs HLA/tmh Attachments cc: R Auluck - NRC WS Chin - BPA C Eschels EFSEC JB Martin - NRC RY AD Toth - NRC Site E , Revell - BPA