MONTHYEARML18017A9251999-10-21021 October 1999 Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05 ML18017A8511999-08-26026 August 1999 Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0501999-08-0404 August 1999 Application for Amend to License NPF-63,revising TS to Incorporate Analytical Methodology References in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0431999-08-0202 August 1999 Application for Amend to License NPF-63,revising TS 6.2.2.e to Require Either Operations Manager or off-shift Operations Superintendent to Hold SRO License ML18016B0071999-07-0909 July 1999 Application for Amend to License NPF-63,revising TS 3/4.2.2, TS 3/4.2.3 & TS 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Processing by Implementing Guidance in GL 88-16 & NUREG-1431,Rev 1, Std TS W Plants. ML18016B0111999-07-0909 July 1999 Application for Amend to License NPF-63,relocating TS 3/4.3.3.3,TS 3/4.3.3.4,TS 3/4.3.3.9 & TS 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis Requirements, IAW GL 95-10 ML18016A9891999-06-15015 June 1999 Application for Amend to License NPF-63,revising TS to Incorporate performance-based 10CFR50 App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9761999-06-0202 June 1999 Application for Amend to License NPF-63,revising TS 6.5, Review & Audit, TS 6.8, Procedures & Program & TS 6.10, Record Retention. ML18016A8381999-02-26026 February 1999 Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl ML18016A7681998-12-23023 December 1998 Application for Amend to License NPF-63,revising TS 5.6, Fuel Storage, by Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' Non-proprietary & Proprietary Licensing Repts Encl.Proprietary Info Withheld ML18016A6031998-10-0101 October 1998 Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl ML18016A5921998-09-23023 September 1998 Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door Shut ML18016A5441998-09-0101 September 1998 Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5391998-08-27027 August 1998 Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 ML18016A5031998-08-14014 August 1998 Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months ML18016A3991998-04-24024 April 1998 Application for Amend to License NPF-63,revising TS 3/4.3.2, ESFAS Instrumentation, to Allow Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3461998-03-12012 March 1998 Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A2561997-12-16016 December 1997 Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2221997-10-29029 October 1997 Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1 ML18012A8101997-06-12012 June 1997 Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f ML18012A7841997-05-16016 May 1997 Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6341997-04-23023 April 1997 Application for Amend to License NPF-63,incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affect Specs 4.3.2.1.1.a,4.3.2.1.4.b, 4.3.2.1.6.g,4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5761997-03-17017 March 1997 Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0021997-03-14014 March 1997 Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0051997-03-10010 March 1997 Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration ML18022B0011997-02-27027 February 1997 Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld ML18012A5291997-02-18018 February 1997 Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A4981997-02-0606 February 1997 Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4941997-01-29029 January 1997 Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability ML18012A4621997-01-10010 January 1997 Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure ML18012A4491996-12-30030 December 1996 Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits ML18012A4141996-10-31031 October 1996 Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & Temp ML18012A3931996-10-0808 October 1996 Application for Amend to License NPF-63,proposing to Implement Change to Bases for TSs 3/4.6.1.4 & 3/4.6.1.6 Revising Calculated Peak Pressure for MSLB Event ML18012A3701996-09-18018 September 1996 Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure Testing ML18012A3031996-07-19019 July 1996 Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years ML18012A2511996-05-31031 May 1996 Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders ML18012A1801996-03-20020 March 1996 Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 ML18012A1411996-02-16016 February 1996 Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation ML18011A8751995-04-0505 April 1995 Application for Amend to License NPF-63,revising Portions of Section 3/4.9, Refueling Operations to Be Consistent W/ NUREG-1431 & Relocating Applicable Sections Per Commission Final Policy Statement ML18011A8721995-03-30030 March 1995 Application for Amend to License NPF-63,revising EDG SR Contained in Section 4.8.1.1.2 to Be Consistent w/NUREG-1431 New Std TS for Westinghouse Plants & Eliminating Need for Duplicate EDG Testing Being Performed ML18011A8501995-03-20020 March 1995 Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR ML18011A8111995-03-0303 March 1995 Application for Amend to License NPF-63,eliminating Response Time Testing for Selected Pressure & Differential Pressure Sensors ML18022A9471995-02-0606 February 1995 Application for Amend to License NPF-63,revising TSs Re Relocation of Shutdown Margin Vs Boron Concentration ML18011A7691995-01-19019 January 1995 Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency ML18011A7411994-12-19019 December 1994 Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate Testing ML18011A7151994-12-0606 December 1994 Application for Amend to License NPF-63 to TS Re Revised TS Page Concerning Relocation of Selected TS in Accordance w/NUREG-1431 ML18011A7051994-12-0606 December 1994 Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants. ML18011A6881994-11-23023 November 1994 Application for Amend to License NPF-63 to TS Re Changes to ECCS Evaluation Model ML18011A6141994-10-24024 October 1994 Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 ML18011A5841994-09-12012 September 1994 Application for Amend to License NPF-63,revising TS3/4.8.1, AC Sources & Associated Bases 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18017A9251999-10-21021 October 1999 Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05 ML18017A8511999-08-26026 August 1999 Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations ML18016B0501999-08-0404 August 1999 Application for Amend to License NPF-63,revising TS to Incorporate Analytical Methodology References in TS 6.9.1.6.2 Which Are Used to Determine Core Operating Limits ML18016B0431999-08-0202 August 1999 Application for Amend to License NPF-63,revising TS 6.2.2.e to Require Either Operations Manager or off-shift Operations Superintendent to Hold SRO License ML18016B0111999-07-0909 July 1999 Application for Amend to License NPF-63,relocating TS 3/4.3.3.3,TS 3/4.3.3.4,TS 3/4.3.3.9 & TS 3/4.3.3.11 to Plant Procedure PLP-114, Relocated Tech Specs & Design Basis Requirements, IAW GL 95-10 ML18016B0071999-07-0909 July 1999 Application for Amend to License NPF-63,revising TS 3/4.2.2, TS 3/4.2.3 & TS 3/4.2.5,providing Clarification & Reducing Burden of Addl License Amend Processing by Implementing Guidance in GL 88-16 & NUREG-1431,Rev 1, Std TS W Plants. ML18016A9891999-06-15015 June 1999 Application for Amend to License NPF-63,revising TS to Incorporate performance-based 10CFR50 App J,Option B for Type a Tests (Containment Integrated Leakage Rate Tests) ML18016A9761999-06-0202 June 1999 Application for Amend to License NPF-63,revising TS 6.5, Review & Audit, TS 6.8, Procedures & Program & TS 6.10, Record Retention. ML18016A8381999-02-26026 February 1999 Application for Amend to License NPF-63,revising TS Table Notations for TS Table 3.3-4, ESFAS Instrumentation Trip Setpoints. Description of Changes & Environmental Evaluation,Encl ML18016A7681998-12-23023 December 1998 Application for Amend to License NPF-63,revising TS 5.6, Fuel Storage, by Increasing Spent Fuel Storage Capacity by Adding Rack Modules to Pools 'C' & 'D.' Non-proprietary & Proprietary Licensing Repts Encl.Proprietary Info Withheld ML18016A6031998-10-0101 October 1998 Application for Amend to License NPF-63,further Revising TS 3.0.4 to Clarify Intent Re Mode Changes as Discussed in Proposed Bases.Change to Retyped Page TS 3.9.9,encl ML18016A5921998-09-23023 September 1998 Application for Amend to License NPF-63,revising TS 3/4.6.1.3 to Be Consistent with NUREG-1431,rev 1 Std Tech Specs,W Plants, Dtd Apr 1995 & to Clarify Requirements for Locking Air Lock Door Shut ML18016A5441998-09-0101 September 1998 Application for Amend to License NPF-63,revising TS 3/4.9.11 to Require 23 Feet of Water Above Top of Fuel Rods within Irradiated Fuel Assemblies Seated in Storage Racks ML18016A5391998-08-27027 August 1998 Application for Amend to License NPF-63,revising TS Re Applicability of LCO & Surveillance Requirements,Per GL 87-09 ML18016A5031998-08-14014 August 1998 Application for Amend to License NPF-63,deleting SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fuel Handling Bldg Emergency Exhaust Sys Is Locked in Balanced Position at Least Once Per 18 Months ML18016A3991998-04-24024 April 1998 Application for Amend to License NPF-63,revising TS 3/4.3.2, ESFAS Instrumentation, to Allow Two Hour Surveillance Interval to Facilitate Testing of 6.9 Kv Emergency Bus Undervoltage Relays ML18016A3461998-03-12012 March 1998 Application for Amend to License NPF-63,deleting TS SR 4.9.12.d.4 Which Requires Verifying That Filter Cooling Bypass Valve for Fhb EES Is Locked in Balanced Position at Least Once Per 18 Months ML18016A2561997-12-16016 December 1997 Application for Amend to License NPF-63,revising TS 4.7.1.2.1.a.2.a to Change Differential Pressure & Flow Requirements of Steam turbine-driven AFW Pump to Allow Testing of Pump at Lower Speed than Is Currently Performed ML18016A2221997-10-29029 October 1997 Application for Amend to License NPF-63,revising TS 3/4.8.1, AC Sources - Operating & Associated Bases to Clarify Intent of Ts,Per NUREG-1431,Rev 1 ML18012A8101997-06-12012 June 1997 Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f ML18012A7841997-05-16016 May 1997 Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler ML18012A6341997-04-23023 April 1997 Application for Amend to License NPF-63,incorporating Enhancements to TS Identified in Plant Review Performed IAW GL 96-01.Changes Affect Specs 4.3.2.1.1.a,4.3.2.1.4.b, 4.3.2.1.6.g,4.3.2.1.10.a,4.3.2.1.10.b & 4.7.3.b.3 ML18012A5761997-03-17017 March 1997 Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances ML18022B0021997-03-14014 March 1997 Application for Amend to License NPF-63,increasing AOT for Refueling Water Storage Tank to Twelve Hs While Performing TS Surveillance 4.4.6.2.2 ML18022B0051997-03-10010 March 1997 Application for Amend to License NPF-63,revising TS 3.5.1 to Provide Optional Method of Meeting Surveillance Requirement & to Add New Action Statement Re Boron Concentration ML18022B0011997-02-27027 February 1997 Application for Amend to License NPF-63,amending TS 3/4.4.5, Sgs, & Associated Bases,To Add Sleeve Installation as Alternative to Tube Plugging for Repairing Degraded ST Tubes.Trs encl.CEN-630-P,rev 1 Withheld ML18012A5291997-02-18018 February 1997 Application for Amend to License NPF-63,revising Tech Specs 3/4.7.1, Turbine Cycle Safety Valves. ML18012A4981997-02-0606 February 1997 Application for Amend to License NPF-63,adding New Entry 3.0.5 to 3/4.0 Applicability.New 3.0.5 Provides Specific Guidance for Returning Equipment to Svc for Sole Purpose of Performing Testing to Demonstrate Operability ML18012A4941997-01-29029 January 1997 Application for Amend to License NPF-63,requesting to Add New Entry 3.0.5 to 3/4.0 to Provide Specific Guidance for Returning Equipment to Service in Order to Demonstrate Operability ML18012A4621997-01-10010 January 1997 Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure ML18012A4491996-12-30030 December 1996 Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits ML18012A4141996-10-31031 October 1996 Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & Temp ML18012A3931996-10-0808 October 1996 Application for Amend to License NPF-63,proposing to Implement Change to Bases for TSs 3/4.6.1.4 & 3/4.6.1.6 Revising Calculated Peak Pressure for MSLB Event ML18012A3701996-09-18018 September 1996 Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure Testing ML18012A3031996-07-19019 July 1996 Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years ML18012A2511996-05-31031 May 1996 Application for Amend to License NPF-63,correcting Location Described for One of Three Triaxial Peak Accelerograph Recorders ML18012A1801996-03-20020 March 1996 Application for Amend to License NPF-63,relocating TS 3.3.3.2, Movable Incore Detectors & Associated Bases, Consistent w/NUREG-1431 & GL 95-10 ML18012A1411996-02-16016 February 1996 Application for Amend to License NPF-63,revising TS 4.3.2 Re ESFAS Instrumentation ML18011A8751995-04-0505 April 1995 Application for Amend to License NPF-63,revising Portions of Section 3/4.9, Refueling Operations to Be Consistent W/ NUREG-1431 & Relocating Applicable Sections Per Commission Final Policy Statement ML18011A8721995-03-30030 March 1995 Application for Amend to License NPF-63,revising EDG SR Contained in Section 4.8.1.1.2 to Be Consistent w/NUREG-1431 New Std TS for Westinghouse Plants & Eliminating Need for Duplicate EDG Testing Being Performed ML18011A8501995-03-20020 March 1995 Application for Amend to License NPF-63 to Relocate Cycle Specific Overpower & Overtemperature Delta T Trip Setpoint Parameters to COLR ML18011A8111995-03-0303 March 1995 Application for Amend to License NPF-63,eliminating Response Time Testing for Selected Pressure & Differential Pressure Sensors ML18022A9471995-02-0606 February 1995 Application for Amend to License NPF-63,revising TSs Re Relocation of Shutdown Margin Vs Boron Concentration ML18011A7691995-01-19019 January 1995 Application for Amend to License NPF-63,revising TS SR 4.0.3 & Associated Bases to Provide for Delay in Which to Perform Surveillance Discovered Not Performed within Specified Frequency ML18011A7411994-12-19019 December 1994 Application for Amend to License NPF-63,requesting one-time Schedular Rev to TS Re Containment Leak Rate Testing ML18011A7151994-12-0606 December 1994 Application for Amend to License NPF-63 to TS Re Revised TS Page Concerning Relocation of Selected TS in Accordance w/NUREG-1431 ML18011A7051994-12-0606 December 1994 Application for Amend to License NPF-63,revising TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std Ts,Westinghouse Plants. ML18011A6881994-11-23023 November 1994 Application for Amend to License NPF-63 to TS Re Changes to ECCS Evaluation Model ML18011A6141994-10-24024 October 1994 Application for Amend to License NPF-63,relocating Selected TS Per NUREG-1431 ML18011A5841994-09-12012 September 1994 Application for Amend to License NPF-63,revising TS3/4.8.1, AC Sources & Associated Bases 1999-08-04
[Table view] |
Text
$r CATEGORY 1
~
~r REGULATC INFORMATION DISTRIBUTION ITEM (RIDE)
ACCESSION -NBR: 9706230276 DOC.DATE: 97/06/12 NOTARIZED: YES DOCKET ¹ FAgIL:~0-40' Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400
.4 JTH . ~lAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Application for amend to License NPF-63,amending TS 6.0, "Administrative controls, including changes, replacing title "Shift Foreman."
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution T
NOTES:Application for permit renewal filed. 05000400 E
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 ROONEY,V 1 1 INTERNAL: ACRS 1 1 FILE CE SER~O 1 1 NRR/DE/ECGB/A 1 1 'NR /DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13
I h ~
l
~
p Qli g ~
P
Carolina Power 8t Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JUN 18 1'j97 SERIAL: HNP-97-100 10 CFR 50.90 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS
Dear Sir or Madam:
In accordance with the Code of Federal Regulations, Title 10, Part 50.90, Carolina Power &
Light Company (CP&L) requests a revision to the Technical Specifications (TS) for the Harris Nuclear Plant (HNP). The proposed amendment to TS 6.0, "Administrative Controls," includes changes which (1) replace the title "Shift Foreman" with "Superintendent - Shift Operations (S-SO)," wherever used, (2) replace the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deletes the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO) license, and (4) adds a new TS 6.2.2.f which states that "If the Manager - Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific ~rr position title. These changes are being proposed to more accurately reflect the Operations organization in place at the Harris Nuclear Plant. The proposed changes affect current ~P specifications 6.1.2, 6.2.2, Table 6.2-1, 6.2.4.1, and 6.12.
t r
Enclosure 1 provides a description of the proposed changes and the basis for the changes. t Enclosure 2 details, in accordance with 10 CFR 50.91(a), the basis for the Company's I determination that the proposed changes do not involve a significant hazards consideration.
Enclosure 3 provides an environmental evaluation which demonstrates that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental assessment needs to be prepared in connection with the issuance of the amendment.
9706230276 9706i2 ADQC1tt, 05000400
'"'~'
, PDR PDR State Road1134 NewHill NC Tel 919362-2502 Fax 919362-2095
gi4 Document Control Desk HNP-97-100/ Page 2
' Enclosure 4 provides page change instructions for incorporating the proposed revisions.
Enclosure 5 provides the proposed Technical Specification pages.
CP&L requests that the proposed amendment be issued such that implementation will occur within 30 days of issuance to allow time for orderly inco'rporation into copies of the Technical Specifications.
Please refer any questions regarding this submittal to Ms. D. B. Alexander at (919) 362-3190.
Sincerely, W. R. Robinson Vice President Harris Nuclear Plant MGW/mgw
Enclosures:
- 1. Basis for Change Request
- 2. 10 CFR 50.92 Evaluation
- 3. Environmental Considerations
- 4. Page Change Instructions
- 5. Technical Specification Pages W. R. Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are employees, contractors, and agents of Carolina Power & Light Company.
Notary (
~n al)
My commission expires: p g No oo iZiimn~
S. Y4q+'g
+
Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. M. Fry, N.C. DEHNR Mr. L. A. Reyes, NRC Regional Administrator PUBLIC Mr. V. L. Rooney, NRC Project Manager
",~PE COO~~;
Clitlliiiiiiii
~/
A I
I H g4l a
II t E
h I,
ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS BASIS FOR CHANGE RE UEST
~Back round Technical Specification (TS) 6.0, Administrative Controls, refers to the on-shift individual responsible for the control room command function as the Shift Foreman. The Harris Nuclear Plant (HNP) Operations organization currently refers to this position as the Superintendent-Shift Operations (S-SO). This TS also specifies minimum qualification for the Manager-Operations and Operations Supervisor.
On January 4, 1988, and as supplemented December 29, 1988 and January 16, 1989, Carolina Power &, Light (CP&L) requested a revision to TS 6.2.2.e. The requested revision changed a requirement for the Manager - Operations to hold a Senior Reactor Operator (SRO) license to allowing the Manager - Operations to either (1) hold an SRO license, or (2) have at one time held an SRO license on Harris or a similar plant. This revision was approved and issued as Operating License Amendment 9 on March 2, 1989. In the NRC's Evaluation and Safety Summary for Amendment 9, the staffs position with respect to license requirements for the Manager-Operations was that if the Manager - Operations does not hold an SRO license then a middle manager position, such as the Operations Supervisor, shall hold an SRO license. The Operations Supervisor position provided an additional level of supervision between the Manager-Operations and the Shift Foreman. There is no explicit requirement for this position in ANS 3.1 (September 1979 Draft) which is the governing standard for the HNP.
Therefore, TS 6.2.2.e states that the Manager - Operations shall either hold an SRO license or have at one time held an SRO license for a similar unit. The TS requires that the Operations Supervisor, an off-shift middle manager position, also hold an SRO license. The Operations Supervisor position no longer exists. The SRO licensed Superintendent - Work Coordination position at HNP currently provides immediate supervision to the Superintendent - Shift Operations for plant operations and license activities since the current Manager - Operations does not hold an SRO license. The Superintendent - Work Coordination reports to the Manager-Operations. The Manager - Operations provides supervisory support to the operating shifts for administrative and personnel matters.
This TS change proposes to revise TS 6.0, Administrative Controls, by (1) replacing the title "Shift Foreman" with "Superintendent - Shift Operations," wherever used (2) replacing the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deleting the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold an SRO license, and (4) adding a new TS 6.2.2.f which states that "Ifthe Manager - Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific position title.
Basis Changing the titles "Shift Foreman" to "Shift - Superintendent Operations (S-SO)" and "Vice President - Harris Nuclear Project" to "Vice President - Harris Nuclear Plant" are administrative changes. The S-SO continues to be the on-shift licensed SRO individual with the responsibility for the control room command function.
The Manager - Operations has the overall responsibility for management of planning, directing and coordinating operating activities in accordance with applicable regulations, polices and procedures. The Manager - Operations will continue to either hold an SRO license or have at one time held an SRO license at Harris or a similar unit. A licensed SRO middle manager is required for supervision of plant operations and license activities when the Manager - Operations does not hold an SRO license. The current Manager - Operations does not hold an SRO license but has previously held a license at Harris. Therefore, the SRO licensed Superintendent - Work Coordination currently provides the immediate supervision to the S-SO for plant operations and license activities. The current Manager - Operations provides supervision of the operating shifts for administrative and personnel matters. The Manager - Operations may assume the responsibilities of the designated Operations middle manager ifhe or she holds an SRO license.
This change will provide the equivalent off-shift SRO licensed supervision for plant operations and license activities without specifying a specific job title. The combination of the SRO licensed Operations middle manager and the Manager - Operations positions, when the Manager-Operations does not holds an SRO license, continues to fulfill the guidance of ANS 3.1 (September 1979 Draft) for the Operations Manager's position.
Conclusions The changes proposed by this amendment are being requested to more accurately reflect the Operations organization in place at the HNP. CPS'elieves that these changes are organizational and administrative in nature and can be implemented without any decrease in the overall safe and efficient operation of the unit.
,I
\p 1
ENCLOSURE2 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS 10 CFR 50.92 EVALUATION The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviewed this proposed license amendment request and determined that its adoption would not involve a significant hazards determination. The bases for this determination are as follows:
Pro osed Chan e This Technical Specification (TS) change proposes to revise TS 6.0, Administrative Controls, by (1) replacing the title "Shift Foreman" with "Superintendent - Shift Operations," wherever used (2) replacing the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deleting the last sentence in TS 6.2.2.e which states that the Operations Supervisor will hold a Senior Reactor Operator (SRO) license, and (4) adding a new TS 6.2.2.f which states that "Ifthe Manager-Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific position title.
Basis This change does not involve a significant hazards consideration for the following reasons:
The proposed amendment does not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendment deals with changing position titles and clarification of the Harris Nuclear Plant (HNP) Operations management organization and responsibilities.
The changes are considered to be administrative in nature and do not involve any modifications to any plant equipment or effect plant operation.
Therefore, there would be no increase in the probability or consequences of an accident previously evaluated.
.2: The proposed amendment does not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment deals with changing position titles and clarification of the HNP Operations management organization and responsibilities. The changes are considered to be administrative in nature and do not involve any modifications to any plant equipment or effect plant operation.
Therefore, the proposed change does not create the possibility of a new or different kind of accident &om any accident previously evaluated.
- 3. The proposed amendment does not involve a significant reduction in the margin of safety.
The proposed amendment does not reduce the margin of safety as defined in the Safety Analysis Report or the bases contained in the Technical Specifications. The requirement to have a licensed SRO management position responsible for plant operations is maintained within the proposed amendment.
Therefore, the proposed change does not involve a significant reduction in the margin of safety.
E2-2
~ ~
o
ENCLOSURE3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS ENVIRONMENTALCONSIDERATIONS 10 CFR 51.22(c)(9) provides criterion for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (3) result in a significant increase in individual or cumulative occupational radiation exposure. Carolina Power & Light Company has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:
Pro osed Chan e This Technical Specification (TS) change proposes to revise TS 6.0, Administrative Controls, by (1) replacing the title "Shift Foreman" with "Superintendent - Shift Operations," wherever used (2) replacing the title "Vice President - Harris Nuclear Project" with "Vice President - Harris Nuclear Plant" in TS 6.1.2 consistent with other TS references to this position, (3) deleting the last sentence in TS 6.2.2.e which states that the Operations Super visor will hold a Senior Reactor Operator (SRO) license, and (4) adding a new TS 6.2.2.f which states that "Ifthe Manager-Operations does not hold a Senior Reactor Operator License, then a designated Operations middle manager shall hold a Senior Reactor Operator License." This will provide the equivalent off-shift SRO licensed supervision for operations and license activities, previously provided by the Operations Supervisor, without specifying a specific position title.
Basis The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) for the following reasons:
- 1. As demonstrated in Enclosure 2, the proposed amendment does not involve a significant hazards consideration.
E3-1
2.'he proposed amendment does not result in a significant change in the types or increase in the amounts of any effluents that may be released offsite.
The proposed changes are administrative in nature and do not involve any new equipment or require existing systems to perform a different type of function than they are currently designed to perform. The change does not introduce any new effluents or increase the quantities of existing effluents. As such, the change cannot affect the types or amounts of any effluents that may be released offsite.
- 3. The proposed amendment does not result in a significant increase in individual or cumulative occupational radiation exposure.
The proposed changes are administrative in nature and do not result in any physical plant changes or new surveillances which would require additional personnel entry into radiation controlled areas. Therefore, the amendment has no affect on either individual or cumulative occupational radiation exposure.
E3-2
ENCLOSURE4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT CHANGE TO OPERATIONS ORGANIZATIONDESCRIPTION TECHNICAL SPECIFICATION 6.0, ADMINISTRATIVECONTROLS PAGE CHANGE INSTRUCTIONS Removed Pa e d 6-1 6-1 6-la 6-la 6-5 6-5 6-6 6-6 6-26 6-26 6-27 6-27 E4-1