Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station BVY-98-068, Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp1998-03-31031 March 1998 Monthly Statistical Rept for Mar 1998 for Vynp ML20248L1581998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Vermont Yankee Nuclear Power Station ML20217M7801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Vynp Station ML20198L6111997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Vynp Station BVY-97-161, Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station BVY-97-145, Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station BVY-97-111, Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station BVY-97-088, Monthly Operating Rept for June 1997 for Nynps1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nynps BVY-97-074, Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station BVY-97-033, Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station BVY-97-021, Monthly Operating Rept for Jan 1997 for VYNPS1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for VYNPS BVY-97-001, Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station BVY-96-138, Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station BVY-96-114, Monthly Operating Rept for Sept 1996 for Vynp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Vynp BVY-96-103, Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station1996-07-31031 July 1996 Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VT Yankee Power Station BVY-96-041, Monthly Operating Rept for Mar 1996 for Vynp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Vynp BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station1996-02-29029 February 1996 Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station ML20095F6601995-11-30030 November 1995 Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station BVY-95-118, Monthly Operating Rept for Oct 1995 for Vynp1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Vynp BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Vynp ML20092F5901995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Vermont Yankee Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
'
,
.
,
-
VERMONT YANKEE NUCLEAR" POWER STATION MONTHLY STATISTICAL REPORT 80-02 FOR THE MONTH OF FEBRUARY, 1980 6
U 031 n
'oA65
.
.
,
.
_
/3 ~
.
OPERATING DATA REPORT DOCKET NO. 50-271 DATE 800312 COMPLETED BY rrnogen TELEPHONE 617 166-9011 X2215 OPERATING STATUS Vermont Yankee Notes
- 1. Unit Name:
- 2. Reporting Period: r ak - , v.. 10an
- 3. Licensed Thermal Power (SIWt): 1.593
- 4. Nameplate Rating (Gross $1We): 540
- 5. Design Electrical Rating (Net 31We): 514(open) 504(closed)
- 6. Afaximum Dependable Capacity (Gross SIWE): 535
- 7. Sfaximum Dependable Capacity (Net StWe): 514
- 8. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:
.
- 9. Power Level To Which Restricted. !f Any (Net 31We):
- 10. Reasons For Restrictions.If Any:
-
_ ___
'
.
-
This 3fonth Yr..to.Date Cumulative .
i
'
- 11. Hours !n Reportin2 Period 696' 1,440
- 12. Number Of Hours Reactor Was Critica] 611.75 1,334.8 52.493.19
- 13. Reacto,- Reserve Shutdown Hours 0 0 0 14, Hours Generator On.Line 600.5 1.310.6 , 50,638.38
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (31Wil) 414 96A.5 1.065.965 71.190.578 ;
- 17. Gross Electrical Energy Generated (StWH) 120.755 ...
672.576 23.642,246
- 18. Net Electrical Energy Generated (31WH) 307.911 645,431 22,413,816 86.3 77.h
'
- 19. Unit Service Factor _
91
- 20. Unit Availability Factor 86.1 91 77.6
- 21. Unit Capacity Factor (Using 3!DC Net)
-
87 8 88.9 68.2
- 22. Unit Capacity Factor (Using DER Net) 86 87.2 66.8
- 23. Unit Forced Outa;e Rate 0 2.0 6.4
'
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date.and Di. ration of Each):
-
.
,
,, .. .
' -
.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved
'
-
INITIAL CRITICA LITY -
, INITIAL ELECTRICITY
,'
CO313t ERCIAL OPERATION
'(9/77)
. . _ _ .
..
.
AVERAGE DAILY UNIT POWER LEVEL
,
.
DOCKET NO. 50-271
.
UNIT Ve ront Yankee DATE 800312 COMPLETED BY ' r "ae" TELEPHONE 617-366-9011 X2215 Februarv, 1980 MONT11 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (51We-Net)
- 0 37 514 2 0 18 9'6 3 0 19 526 4 0.7 20 524 5 356 21 525
~
6 436 526
, 22 k, 7 521' 23 526
,
8 518 24 5'14 9 511 525 25 10 525 26 11 526 27 526 12 5'S 28 526 13 526 29 524 14 526 30 15 526 33 16 977
.
INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
.
(9/77)
_ ,...
DOCKET NO. 50-271 .
UNITSilOTDOWNS AND POWER REDUCTIONS UNIT NAhlE Vermont Yankee DATE 80011' REPORT hl0NTil February, 1980 COhfPLETED llY F P Recrs TELEPIIONE 617-166-9011 X2215 "L . -
e c. ':1 . E c
_
- , .2 _e g -o .5 ~
- 4 Licensee c -*,, c ,, Cause & Curreceive No. Date o 3g ;; jg5 H;
Event nT $."'8 Action to dE 5 #0 jdg Report y
}u Prevent Itecurrence 80-6 800201 S 95.5 D 1 N/A ZZ ZZ Shutdown for modifications as required (cont by NUREG 0578. -
80-7 800204 S 0 H 4 N/A RA CONROD Turbine surveillance and control rod (Power pattern adjustment Reducti an) 80-8 800224 S 0 11 4 N/A RA CONROD Turbine surveillance and control rod (Power pattern adjustment Reducti un)
.
d i 2 3 4 F Fo<s ed Iteason: kleiliod:
S: St heduled Exhibit G -Insituctions A. Equipment Failure (Explain) 1-htanual for Picparation of Daia B hlaintenance niTest 7 hianual Scrain. Enity Shecis for I.ieensec
, C Itefueling 3-Automatic Scraan. Event Itepose (Llitt) File INultt'.G- -
D.Itegulatosy Itcstriction 4-Osher (Explain) 0161) li Opciator Training & License Examination F Aihninisisaiive $
G Opesational I.isor (lixplain) lialubit I Same Source P8/17) 11 Othes Ilimpi.ain)
.
DOCKET NO. 50-271
'
UNIT Ve rmont Yankee DATE 800312 COI4PLETED BY F.C. Beers TELEP110NE 617-366-9011 X2215 SAFETY RELATED flAINTENANCE FEBRUARY, 1980 PAGE 1 OF 3 NATUllE OF LER OR OtHAGE -
HALFUNCTION EQUIPfll!NT flAINTENANCE NUf-!BER CAUSE ItESULT CORItECTIVE ACTION "B" Diesel Jacket Cool- Corrective N/A Failed gasket Leakage Replaced gasket ant Outlet at #8 MR 79-1128 Cylinder RCIC Trip Throttle Corrective N/A Dirt Sluggish actuation Disassembled & Cleaned Valve MR 80-0007 "B" RWCU Pump Suction Corrective N/A Worn packing Leakage Adjusted packing Valve V12-19B HR 80-0035 .
PCAC Valves SB16-19-6&7 Preventive N/A Upgrade temper- More reliable Install new Nordel seats MR 80-0059 ature rating of operation
'
valve Temperature Indication Corrective N/A Failed selector Faulty temperature Replaced switch
, op .'.'B" , Diesel Cenerator MR 80-0077 switch on instro - reading
,
ment Main Steam Valve V60-95EC Corractive N/A Worn packing Leakage Repacked valve MR 80-0088 The rmocouple for SLC Corrective N/A Unknown - pos- Thermocouple loose Tightened thermocouple &
Temperature Switch TS- MR 80-0110 sibly impact in wall, seal repaired seal tight 11-51 tight broken Recirculation Flow Corrective N/A Failed component s Failed transmitter Replaced transmitter Transmitter FT2-110A MR 80-0120
DOCKET NO. so_77i
.
UNIT vernnne ynntnn DATE 800117 C0!1PLETED 11Y F.c. Beers ,
TELEPl!ONE 617-166-9011 x?215 SAFETY RELATED !!AINTENAllCE FEBRUARY, 1980 PACE 2.0F 3 flATUltE OF LER OR OLIfAGE 11ALFUNCT10N EQUIPflENT MAINTENANCE NUllBER CAUSE ItESULT C0llRECTIVE ACTION Main Steam Safety / Relief Corrective N/A Degraded valve Back leakage Replaced. valves Valves Instrument Air MR 80-122 seats through valve Check Valves V105-37A4D Shock Suppressor RR-2 Corrective LER 80-8/3L Unknown-No obvious Loss of fluid Rebuilt shock suppressor MR 80-0130 seal degradation Main Steam Safety / Relief Corrective N/A Worn parts Air leakage Replaced solenoids Valve. Solenoids MR 80-0131 .
Containment Atmos. Samp1- Corrective N/A Position. indicator Loss of position Adjusted position indi-ing Valve V109-76B MR 80-0134 on valve out of indication cator adj ustment R"9 Valve V10-65B Corrective N/A Worn packing Leakage Adjusted packing MR 80-0140
'
Annunciator Relay K51A Preventive N/A Worn parts Relay odoriferous Replaced relay coil MR 80-0143 RWCU Valve PCV-12-55 Corrective N/A Dirt on seat Valve leakage Cycled valve MR 80-0151 Main Steam Valve V60-31 Corrective N/A Dirt on seat Valve leakage Cycled velve MR 80-0170 IRM-A Corrective N/A Loose retaining Inoperable Reset Tightened screws MR 80-0171 Screw Switch
.
DOCKET NO. 50-271 -
.
UNIT Vermont Yankee DATE 800312 C0!!PLETED liY F. C. Beers TELEPliONE 617-366-9011 X2215 SAFETY RELATED !!AINTENANCE FEBRUARY, 1980 PACE 3 0F 3 NATUlth OF LER Olt OLII' AGE !!ALFUNCTION EQUIPflliNT P!AllDENANCE NU!! Bell CAUSE I!ESULT C0ltitECTIVE ACTION
.
R.CIC Steam Line Flange Corrective N/A Failed gasket Leakage Replaced gasket MR 80-0177 "B" Diesel Fuel Oil Corrective , N/A Clogged filter liigh differential Changed filter Filter MR 80-0236 Pressure llPCI EGR Corrective LER 80-7/3L Unknown Sticky operation Replaced EGR MR 80-0243
'
SBGT Train A Corrective N/A Saturated filter Loss of filter Replaced filter MR 80-0251 efficiency RHR SW Pump P8-1C Switch Corrective Broken wire on Pump could not be Replaced breaker with Cear MR 80-0258 closing coil be started remotel / spare repaired wiring
.
,
.
DOCKET NO. 50-271 UNIT vo -, y , ,i, n ,
DATE anou s COMPLETED BY F. c. 9nars TELEPHONE 617-366-9011 X2215 REPORT MONTH vgwr,3,,v. logo
SUMMARY
OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 84.3% of rated thermal power for the month.
Gross electrical generation was 320,755 MWH or 85.3% design electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
2/1/80 At the beginning of the reporting period the plant was shut down.
2/4/80 At 1058 hours0.0122 days <br />0.294 hours <br />0.00175 weeks <br />4.02569e-4 months <br /> a plant startup was init'.ated.
At 2332 hours0.027 days <br />0.648 hours <br />0.00386 weeks <br />8.87326e-4 months <br /> the generator was phased onto the grid.
2/9/80 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> power was reduced for surveillance testing and a rod pattern adjustment.
At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> the adjustment was completed and a power ascension was initiated.
2/24/80 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> power was reduced for surveillance testing and a rod pattern adjustment.
At 0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> the adjustment was completed and a power ascension initiated.
2/29/80 At the end of the reporting period the plant was operating at 99.8% of rated thermal power.