ML13266A326

From kanterella
Revision as of 14:16, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of TI-2515/186 Inspection (NRC Inspection Report 05000275, 323/2013405) and Request for Information
ML13266A326
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/23/2013
From: Vincent Gaddy
Operations Branch IV
To: Halpin E
Pacific Gas & Electric Co
References
50-275/13-405, 50-323/13-405
Download: ML13266A326 (4)


See also: IR 05000275/2013405

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

September 23, 2013

Mr. Edward D. Halpin

Senior Vice President and

Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF TI-2515/186

INSPECTION (NRC INSPECTION REPORT 05000275, 323/2013405) AND

REQUEST FOR INFORMATION

Dear Mr. Halpin:

From November 19, 2013, to November 21, 2013, inspectors from the Nuclear

Regulatory Commissions (NRC) Region IV office will be onsite to perform the Temporary

Instruction (TI)-2515/186, Inspection of Procedures and Processes for Responding to

Potential Aircraft Threats. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection. Also, in order to demonstrate compliance with TI-2515/186,

we ask that you have the necessary staff members available to the inspection team to assist in

any plant walk-throughs, interviews and/or simulator demonstrations.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Dean Overland of your licensing

organization. If there are any questions about this inspection or the material requested,

please contact the lead inspector Sean Hedger at 817-200-1556 (Sean.Hedger@nrc.gov)

or Clyde Osterholtz at 817-200-1269 (Clyde.Osterholtz@nrc.gov).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required

to respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

E. Halpin -2-

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-275; 50-323

Licenses: DPR-80; DPR-82

Enclosure:

Inservice Inspection Document Request

cc: Electronic Distribution for Diablo Canyon Power Plant

ML13266A326

ADAMS: No Yes SUNSI Review Complete Reviewer Initials: SDH

Publicly Available Non-Sensitive

Category A. Non-publicly Available Sensitive

KEYWORD: SUNSI Review Complete

OE:OB C:OB

SHedger VGaddy

/RA/ /RA/

9/23/2013 9/23/2013

TI-2515/186 INSPECTION DOCUMENT REQUEST

FROM: Sean Hedger

Operations Engineer, NRC RIV

817-200-1556

TO: Dean Overland

Senior Engineer, Regulatory Services, Diablo Canyon Power Plant

805-545-6038

SUBJECT: INFORMATION REQUEST TO SUPPORT NOVEMBER 19-21, 2013,

TI-2515/186 INSPECTION, INSPECTION OF PROCEDURES AND

PROCESSES FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS

A. The following information is requested in order to support inspection preparation

activities. Requested materials should be sent either electronically or hardcopy in

order to arrive at the Region IV office no later than November 11, 2013.

  • Electronically: Via email, CD, or IMS Certrec

and/or

  • Hardcopy to: US Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Sean Hedger

Document Request:

  • Procedure(s) that describe actions taken to address potential aircraft threat

notifications onsite. This may include procedures that operations, security,

emergency preparedness, and health physics staff use.

  • Plant specific analyses prepared to support the designed actions you have taken to

address this issue in your procedures. Such analyses were described for support of

site actions in the topical Regulatory Guide 1.214 (dated January 2009).

  • Training materials used to train the various affected groups when contacted with a

potential aircraft threat (licensed operators, operators in training for a license, non-

licensed operators, security, EP, HP, fire brigade, and other support staff, as

examples).

  • If the site has conducted exercises or drills to evaluate the ability of staff to

implement these procedures in the past, provide any documentation summarizing

the results of these events. If any condition reports came out of the exercises/drills,

provide those as well.

  • A copy of the staffing analysis submitted to the NRC by December 24, 2012, to

address the Emergency Preparedness requirement in 10 CFR 50, Appendix E,

Section IV.A.9.

-1- Enclosure