Category:Meeting Briefing Package/Handouts
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19317C9952019-11-12012 November 2019 In-Service Testing Supplemental Position Indication Relief Request NRC Pre-Application Meeting November 18, 2019 ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18190A3922018-06-14014 June 2018 Licensee Presentation Material for June 14, 2018 Public Meeting ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18096A0222018-04-0404 April 2018 Annual Assessment Meeting 04/04/2018 Handouts ML18096A9902018-03-12012 March 2018 NRC Pre-Submittal Call Briefing Notes, Calvert Cliffs Emergency Planning Future Licensing Actions ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17143A1612017-05-23023 May 2017 Annual Assessment Meeting Handout and Sign in Sheet ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request 2024-05-16
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24137A1882024-05-16016 May 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides ML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML23157A0352023-06-0606 June 2023 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Presentation Slides NEI 99-01, Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides2023-02-21021 February 2023 Slides - Constellation - Pre-Application EP 2/23/2023 Meeting Slides ML23033A6662023-02-0909 February 2023 Summary of Public Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Its Request for Alternatives for Certain Steam Generator Weld Inspections for Calvert Cliffs 1 & 2, Byron 1 & 2, Braidwood 1 & 2, and Ginna ML23033A6672023-01-30030 January 2023 Public Call with Constellation January 30, 2023 (Slides) ML22124A1492022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Non-Proprietary (Public) ML22124A1482022-05-10010 May 2022 (Ccnpp) Control Element Assembly (CEA) Recovery Time Improvement Project LAR Pre-Submittal Redacted (Public) ML22013A3942022-01-13013 January 2022 Presentation Information for Pre-Submittal Meeting Regarding Relief Request to Use the Carbon Fiber Reinforced Polymer (Cfrp) Composite System ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21165A1942021-06-16016 June 2021 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation ML21165A2882021-06-16016 June 2021 Joint Annual Assessment for Pa/Md/Nj/Ny Nuclear Power Plants - Webinar Presentation (Updated) ML21162A3322021-06-11011 June 2021 BWR Fleet Relief Request Associated with RPV Instrument Nozzle Repairs ML21144A0172021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request Pre-Submittal Meeting ML21134A0162021-05-24024 May 2021 Spent Fuel Pool Cooling - Shutdown Cooling Licensing Design Basis License Amendment Request - NRC Pre-submittal Meeting Telecon May 24, 2021 (EPID L-2021-LRM-0051) (Slides) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20246G8772020-09-0303 September 2020 Licensee'S Presentation for September 3, 2020 Public Telephone Conference ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20175A8722020-06-23023 June 2020 Risk-Informed Inservice Inspection - U.S Nuclear Regulatory Commission (NRC) - Four Element Risk-Informed Approach ML20163A6542020-06-18018 June 2020 2020 NRC Annual Assessment Webinar Presentation - Pennsylvania and Maryland Facilities (Beaver Valley, Calvert Cliffs, Limerick, Peach Bottom, Susquehanna) ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20168A3192020-06-15015 June 2020 Joint Annual Assessment Meeting for Pa/Md Power Plants - Webinar Presentation ML19246B7162019-08-29029 August 2019 Meeting Between NRC and Exelon Regarding Calvert Cliffs-2 LAR to Use Framatome ATF LTAs ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18276A0712018-10-0404 October 2018 Exelon'S Presentation for October 4, 2018 Public Pre-Submittal Meeting on Planned Calvert Cliffs 10CFR50.69 LAR ML18171A0842018-06-21021 June 2018 GSI-191 Program Use of Risk Metrics for Containment Sump Tech Spec Operability Determination June 21, 2018 Public Meeting Slides (MF8521, MF8522; L-2016-LRM-0001) ML18136A4932018-05-16016 May 2018 Licensee'S Slides for Pre-Application Meeting W/Exelon Re Planned GSI-191 LAR for Calvert Cliffs (L-2016-LRM-0001) ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML16328A2832016-11-18018 November 2016 Supplemental Presentation Slides for 10/25/2016 Public Meeting Via E-mail from K.Greene to R.Guzman Calvert Cliffs GSI-191 Resolution Update ML16307A4902016-10-25025 October 2016 Presentation Slides from Public Meeting Calvert Cliffs GSI-191 Resolution Update ML16274A0012016-09-30030 September 2016 PWR MSIP Analysis and Measurements ML16242A1782016-09-0101 September 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16198A0012016-07-18018 July 2016 Presentation Slides from Public Meeting Regarding Calvert Cliffs GSI-191 Resolution Update ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML15321A3702015-12-0101 December 2015 GSI-191 Program Strainer Head Loss Testing and Option 2b Closure Approach ML15308A1072015-11-0505 November 2015 TSTF-505 LAR - NRC Pre-Submittal, November 5, 2015 Meeting Slides ML15279A4992015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application ML15282A0832015-10-0808 October 2015 October 8, 2015, Public Meeting Regarding the NFPA-805 License Amendment Application - Final ML15222A5472015-08-31031 August 2015 GSI 191 Program Chemical Effects Testing Update Option 2b Closure Approach ML15152A0822015-06-0404 June 2015 Presentation for the June 4, 2015 Public Meeting Regarding the National Fire Protection Association Standard 805 License Amendment Request ML14230A9132014-08-18018 August 2014 Enclosure - Fuel Performance and Cask Internals - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L ML14230A9112014-08-18018 August 2014 Enclosure - Example AMP - July 17, 2014, Summary of Meeting with Exelon Corporation to Discuss Request for Additional Information No. 4 to the Calvert Cliffs ISFSI License Renewal Application (Docket No. 72-08) TAC L24475 2024-05-16
[Table view] |
Text
Aging Management Program Example for Stress Corrosion Cracking Darrell S. Dunn Meeting to Discuss the Request for Additional Information Responses p Regarding g g the Calvert Cliffs Independent p Spent p
Fuel Storage Facility License Renewal July 17, 2014
Stress Corrosion Cracking Background Information
- Sensitization from welding increases susceptibility
- Crevice and pitting corrosion can be precursors to SCC
- SCC possible with low surface chloride concentrations
- Welded stainless steel canisters have sufficient through wall tensile residual stresses for SCC 2/3 of the requirements
- At Atmospheric h i SCC off welded ld d stainless steels has been observed for SCC are present in - Component failures in 16-33 years welded stainless steel - Estimated crack ggrowth rates of 0.11 to 0.91 mm/yr canisters 2
Regulatory Basis
TLAAs that demonstrate that ITS SSCs will continue to perform their intended function for the period of extended operation.
A description of the AMP for management of issues associated with aging that could adversely affect ITS SSCs.
- 1. Scope of the Program 6. Acceptance Criteria
- 2. Preventive Actions 7. Corrective Actions
- 3. Parameters Monitored/Inspected 8. Confirmation Process
- 4. Detection of Aging Effects 9. Administrative Controls
- 5. Monitoring and Trending 10. Operating Experience 3
AMP Element 1 Scope of the Program NUREG-1927: The scope of the program should include the specific structures and components subject to an AMR
- Welded stainless steel dry storage canisters
- Fabrication and closure welds
- Weld heat affected zones
- Locations where temporary supports or fixtures were attached by welding
- Crevice locations
- Surface areas where atmospheric deposits preferentially occurs
- Surface areas with a lower than average temperature 4
AMP Element 2 Preventative Actions NUREG-1927: Preventive actions should mitigate or prevent the applicable aging effects
- Preventative actions are not presently incorporated into existing dry storage canister designs
- Future designs or amendments could include
- Surface modification to impart compressive residual stresses on welds and weld heat affected ff zones
- Materials with improved localized corrosion and SCC resistance 5
AMP Element 3 Parameters Monitored/Inspected NUREG-1927: Parameters monitored or inspected should be linked to the effects of aging on the intended functions of the particular structure and component
- Canister surfaces,, welds,, and weld heat affected zones for discontinuities and imperfections
- Size and location of localized corrosion (e.g., ( g pitting and crevice corrosion) and stress corrosion cracks
- Appearance and location of atmospheric deposits on the canister surfaces 6
AMP Element 4 Detection of Aging Effects (1/2)
NUREG-1927: Define method or technique, frequency, sample size, data collection, and timing to ensure timely detection of aging effects
- Qualified and demonstrated technique to detect evidence of localized corrosion and SCC:
- Remote visual inspection, e.g. EVT-1, VT-1, VT-3, or Eddy Current Testing (ET) may be appropriate
- PPending di d detection t ti fifindings, di sizing i i SCC would ld require i
volumetric methods 7
AMP Element 4 Detection of Aging Effects (2/2)
- Minimum of one canister at each site
- Canisters with the greatest susceptibility
- Documentation of the examination of the canister
- Location and appearance of deposits
- Every 5 years
- Within 25 years of initial loading 8
AMP Element 5 Monitoring and Trending NUREG-1927: Should provide for prediction of the extent of the effects of aging and timely corrective or mitigative actions
- Document canister condition particularly at welds and crevice locations using images and video that will allow comparison in subsequent examinations
- Changes to the size and number of any corrosion product accumulations
AMP Element 6 Acceptance Criteria (1/2)
NUREG-1927: Acceptance criteria, against which the need for corrective action will be evaluated;; should ensure that SSC functions are maintained
- Pitting or crevice corrosion
- Stress corrosion cracking
- Corrosion products near crevices
- Corrosion products on or adjacent to fabrication welds, closure welds welds, and welds for temporary supports or attachments 10
AMP Element 6 Acceptance Criteria (2/2)
- Locations with corrosion products require additional examination for localized corrosion and/or SCC
- Size of the area affected and the depth of penetration if localized corrosion and/or SCC is identified
- Canisters with localized corrosion and/or SCC must be evaluated for continued service in accordance with ASME B&PV Code Section XI IWB-3514.1 and IWB-3640 11
AMP Element 7 Corrective Actions NUREG-1927: Corrective actions, including root cause determination and prevention of recurrence, should be timely
- Supplemental inspections to determine the extent of condition at the site
- Subsequent inspections of canisters with indications
- Canisters that do not meet the prescribed evaluation criteria must be repaired p or removed from service 12
AMP Element 8 Confirmation Process NUREG-1927: Confirmation process should ensure that preventive q
actions are adequate & appropriate pp p corrective actions have been completed & are effective
- Ensure that inspections, , evaluations,, and corrective actions are completed in accordance with the Site Specific or General Licensees Corrective Action Program (CAP)
- Extent of condition
- Evaluation for continued service
- Repair, replace, mitigation actions 13
AMP Element 9 Administrative Controls NUREG-1927: Administrative controls should provide a formal review and approval process
- Training requirements for inspectors
- Records retention requirements 14
AMP Element 10 Operational Experience NUREG-1927: Include past corrective actions; provide objective evidence to support a determination that the effects of aging will be adequately managed so that the SSC intended functions will be maintained during the period of extended operation
- No reported cases of localized corrosion or SCC in welded stainless steel canisters
- Atmospheric deposits on canister surfaces have been observed
- Laboratoryy and field test data on conditions necessaryy for chloride induced SCC and SCC growth rates 15
Acronyms AMP: Aging management program TLAA: time limiting aging analysis AMR: Aging management review ITS: Important to safety ASME B&PV code: American Societyy SCC: Stress corrosion crackingg of Mechanical Engineers Boiler and Pressure Vessel code SSC: Structures systems and components CAP: Corrective action pprogram g
VT-1: Visual Testing-1 (ASME B&PV CFR: Code of Federal Regulations code Section XI, Article IWA-2200)
EVT-1:
EVT 1: Enhanced visual testing testing-1 1 VT-3:
VT 3: Visual Testing-3 Testing 3 (ASME B&PV (Boiling water reactor vessels and code Section XI, Article IWA-2200) internals project, BWRVIP-03) 16