ML14248A678

From kanterella
Revision as of 00:40, 4 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2014 DC Cook Initial License Examination Form ES-301-5
ML14248A678
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
Shared Package
ML14218A305 List:
References
Download: ML14248A678 (3)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Crews 1-3 (1SRO(U), 2ROs)

Facility: D C Cook U1/U2 Date of Exam: 7/21 & 23/2014 Operating Test No.: 2014301 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RO RX 3 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 5,8 5,8 4 4 4 2 SRO-U MAJ 7 7 2 2 2 1 TS 0 0 2 2 RO RX 3 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 4,6,9 4,9 4 4 4 2 SRO-U MAJ 7 7 2 2 2 1 TS 0 0 2 2 RX 3 1 2 1 1 0 RO NOR 1 3 2 1 1 1 SRO-I 4,5,6 4,5,8 I/C 8 4 4 2

,8,9 9 SRO-U MAJ 7 7 2 2 2 1 TS 2,4,6 2,4,6 6 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

ES-301 Transient and Event Checklist Form ES-301-5 CREW 4 (1SRO(U), 2 RO) CREW 5 (1 SRO(U), 1SRO(I), 1RO)

Facility: D C Cook Date of Exam:7/22 & 24/2014 Operating Test No.: 2014301 A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RX 2 1 1 1 0 RO NOR 1 1 1 1 1 SRO-I 3,9,7 I/C 3,7,8 7 4 4 2 10 SRO-U MAJ 6 6 2 2 2 1 TS 0 0 2 2 RO RX 2 1 1 1 0 NOR 1 1 1 1 1 SRO-I I/C 4,5,9 4,5,8 6 4 4 2 SRO-U MAJ 6 6 2 2 2 1 TS 0 0 2 2 RX 2 2 2 1 1 0 RO NOR 1 1 2 1 1 1 SRO-I 3,4,5 3,4,5 I/C 7.8.9 13 4 4 2 7,8,9 10 SRO-U MAJ 6 6 2 2 2 1 TS 3,4 3,5 6 0 2 2 RX 2 2 2 1 1 0 RO NOR 1 1 1 1 1 SRO-I 3,4,5 I/C 4,5,9 7.8.9 10 4 4 2 SRO-U 10 MAJ 6 6 2 2 2 1 TS 3,5 2 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 CREW 6 (3 SRO(I))

Facility: D C Cook U1/U2 Date of Exam: 7/22, 24, & 25/2014 Operating Test No.: 2014301 A E Scenarios P V 2 4 5 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I

M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)

N Y O C P O C P O C P O C P R I U T P E

RO RX 2 1 1 1 0 SRO-I NOR 1 2 2 1 1 3,7, 3,7, 3,4,5 SRO-U I/C 12 4 2 8 9,10 6,8 MAJ 6 6 7 3 2 1 TS 3,4,5 3 2 2 RX 2 2 2 1 0 RO NOR 1 2 2 1 1 SRO-I 3,4,5 I/C 4,5,9 7.8.9 4,8 12 4 2 SRO-U 10 MAJ 6 6 7 3 2 1 TS 3,5 2 2 2 RO RX 2 1 2 1 0 SRO-I NOR 1 1 2 1 1 3,4,5 SRO-U I/C 4,5,8 3,5,6 12 4 2 7,8,9 MAJ 6 6 7 3 2 1 TS 3,4 2 2 2 RO RX 1 0 SRO-I NOR 1 1 I/C 4 2 SRO-U MAJ 2 1 TS 2 2