ML16074A034

From kanterella
Revision as of 15:48, 3 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of a Change in Level 1 Management for the University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL)
ML16074A034
Person / Time
Site: University of Texas at Austin
Issue date: 03/02/2016
From: Whaley P
University of Texas at Austin
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16074A034 (1)


Text

.,;*::7?*':: Department of Mechanical Engineering

,,4...... ,*. THE UNIVERSITY OF TEXAS AT AUSTIN

'*!'*)

  • ':: * ' ; Nuclear Engineering 7iucxhing Laboratory"Austin. Texas 78758

';!i

;*'*:i*'512-232-5370' FAX 512-471-4589- http.//www.ne~ntexa*.edu/-netll March 2, 2016 Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C., 20555

Subject:

Notification of a Change in Level 1 Management for The University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL)

Reference:

Facility License R-129, Docket 50-602 Sirs:

This letter is to inform you that Dr. R. Neptune became the interim Chair of the Mechanical Engineering Department at University of Texas at Austin on January 1, 2016 replacing J. Murthy. Although this appointment is not a permanent assignment, the resignation of Dr. Murthy is. This notification is required by the R-129 Technical Specifications. The following is the current list of Level 1 and Level 2 Line Management for the R-129 license.

President of the University of Texas at Austin Gregory L. Fenves Exec. Vice President and Provost (interim) Judith H. Langlois Cockrell School of Engineering Dean Sharon L. Wood Department of Mechanical Engineering Chair (interim) Rick Neptune NETL Director Steven Biegalski NETL Associate Director P. M. Whaley Please contact the NETL if you have any questions at 512-232-5373.

P. M. Whaley NETL Associate Director cc: Reactor Oversight Committee S. Traiforos, Project Manager

&py

.,;*::7?*':: Department of Mechanical Engineering

,,4...... ,*. THE UNIVERSITY OF TEXAS AT AUSTIN

'*!'*)

  • ':: * ' ; Nuclear Engineering 7iucxhing Laboratory"Austin. Texas 78758

';!i

;*'*:i*'512-232-5370' FAX 512-471-4589- http.//www.ne~ntexa*.edu/-netll March 2, 2016 Nuclear Regulatory Commission Attn: Document Control Desk Washington D.C., 20555

Subject:

Notification of a Change in Level 1 Management for The University of Texas at Austin Nuclear Engineering Teaching Laboratory (NETL)

Reference:

Facility License R-129, Docket 50-602 Sirs:

This letter is to inform you that Dr. R. Neptune became the interim Chair of the Mechanical Engineering Department at University of Texas at Austin on January 1, 2016 replacing J. Murthy. Although this appointment is not a permanent assignment, the resignation of Dr. Murthy is. This notification is required by the R-129 Technical Specifications. The following is the current list of Level 1 and Level 2 Line Management for the R-129 license.

President of the University of Texas at Austin Gregory L. Fenves Exec. Vice President and Provost (interim) Judith H. Langlois Cockrell School of Engineering Dean Sharon L. Wood Department of Mechanical Engineering Chair (interim) Rick Neptune NETL Director Steven Biegalski NETL Associate Director P. M. Whaley Please contact the NETL if you have any questions at 512-232-5373.

P. M. Whaley NETL Associate Director cc: Reactor Oversight Committee S. Traiforos, Project Manager

&py