|
---|
Category:Annual Operating Report
MONTHYEARML23059A4392023-02-28028 February 2023 2022 Aircraft Movement Data Annual Report ML22083A1062022-03-24024 March 2022 2020-2021 Biennial 10 CFR 50.59 and 10 CFR 72.48 Summary Reports and 2021 Commitment Revision Summary Report ML22055A4912022-02-28028 February 2022 Us Dept. of Energy, STI-NLF-RPT-218 Revision 0, 2021 Annual Radiological Environmental Monitoring Program (REMP) Report for the Three Mile Island Unit-2 (TMI-2) Independent Spent Fuel Storage Installation (ISFSI) TMI-21-019, Submittal of 2020 Annual Radiological Environmental Operating Report2021-04-27027 April 2021 Submittal of 2020 Annual Radiological Environmental Operating Report ML20127H6722020-05-0606 May 2020 CFR 50.46 Annual Report TMI-20-015, 2018-2019 Biennial 10 CFR 50.59 Summary Report and 2019 Commitment Revision Summary Report2020-04-30030 April 2020 2018-2019 Biennial 10 CFR 50.59 Summary Report and 2019 Commitment Revision Summary Report ML20114E0142020-04-23023 April 2020 (TMl-2) - Biennial 10 CFR 50.59 and Pdms SAR Report ML20062A1822020-02-27027 February 2020 Submittal of 2019 Annual Report ML19126A1632019-05-0606 May 2019 Submittal of 10 CFR 50.46 Annual Report ML18124A0082018-05-0404 May 2018 Submittal of 10 CFR 50.46 Annual Report TMI-18-024, Biennial 10 CFR 50.59 and Pdms SAR Report2018-04-24024 April 2018 Biennial 10 CFR 50.59 and Pdms SAR Report ML17125A1522017-05-0505 May 2017 10 CFR 50.46 Annual Report ML17052A3952017-02-17017 February 2017 Submittal of 2016 Annual Report ML16130A0652016-05-0606 May 2016 Submittal of 10CFR 50.46 Annual Report ML16125A1932016-04-30030 April 2016 Annual Radiological Environmental Operating Report for the Year 2015 ML16123A1822016-04-29029 April 2016 Transmittal of Biennial 10 CFR 50.59 and Pdms SAR Report ML16110A1652016-04-15015 April 2016 Transmittal of Biennial 10 CFR 50.59 and Commitment Revision Reports for 2014 and 2015 TMI-16-012, Transmittal of 2015 Annual Report2016-02-10010 February 2016 Transmittal of 2015 Annual Report RS-15-104, Annual Property Insurance Status Report2015-04-0101 April 2015 Annual Property Insurance Status Report TMI-14-066, 10 CFR 50.46 Annual Report2014-05-0909 May 2014 10 CFR 50.46 Annual Report TMI-14-049, Combined 2013 Annual Radioactive Effluent Release Report2014-04-25025 April 2014 Combined 2013 Annual Radioactive Effluent Release Report TMI-13-073, CFR 50.46 Annual Report2013-05-10010 May 2013 CFR 50.46 Annual Report ML13121A0782013-04-30030 April 2013 Annual Radiological Environmental Operating Report, 1 January Through 31 December 2012 TMI-13-065, Annual Radiological Groundwater Protection Program Report (Argppr), 1 January Through 31 December 20122013-04-30030 April 2013 Annual Radiological Groundwater Protection Program Report (Argppr), 1 January Through 31 December 2012 TMI-12-079, 10 CFR 50.46 Annual Report2012-05-11011 May 2012 10 CFR 50.46 Annual Report TMI-12-072, (TMI-2) - Biennial 10 CFR 50.59 and Pdms SAR Report2012-04-30030 April 2012 (TMI-2) - Biennial 10 CFR 50.59 and Pdms SAR Report TMI-12-047, (TMI-1), Biennial 10 CFR 50.59 and Commitment Revision Reports for 2010 and 20112012-04-16016 April 2012 (TMI-1), Biennial 10 CFR 50.59 and Commitment Revision Reports for 2010 and 2011 TMI-12-013, Annual Report2012-02-29029 February 2012 Annual Report TMI-11-086, Submittal of 10 CFR 50.46 Annual Report2011-05-13013 May 2011 Submittal of 10 CFR 50.46 Annual Report TMI-10-030, Annual Radiological Environmental Operating Report2010-04-28028 April 2010 Annual Radiological Environmental Operating Report TMI-10-031, Combined 2009 Annual Radioactive Effluent Release Reports2010-04-28028 April 2010 Combined 2009 Annual Radioactive Effluent Release Reports TMI-10-008, Submittal of 2009 Annual Operating Report2010-02-19019 February 2010 Submittal of 2009 Annual Operating Report TMI-09-053, Annual Radiological Environmental Operating Report for 1 January Through 31 December 20082009-04-30030 April 2009 Annual Radiological Environmental Operating Report for 1 January Through 31 December 2008 ML0912606692009-04-30030 April 2009 Annual Radiological Environmental Operating Report for 1 January Through 31 December 2008 ML0912804372009-04-30030 April 2009 Combined 2008 Annual Radioactive Effluent Release Report TMI-09-013, Annual Report2009-02-20020 February 2009 Annual Report ML0828807302008-06-30030 June 2008 SEIS Ch. 8 Energy References, Annual Energy Outlook 2008, with Projections to 2030 ML0806501212008-02-20020 February 2008 2007 Annual Report ML0713603372007-05-16016 May 2007 Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-water Nuclear Power Reactors. ML0513706302005-05-16016 May 2005 (TMI Unit 1), Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Required by 10 CFR 50.46 ML0828807262005-01-0101 January 2005 Pennsylvania Bureau of Radiation Protection Environmental Radiation in PA - 2003 and 2004 Annual Reports ML0819806862004-12-31031 December 2004 008-C2-AmerGen 2005 - Three Mile Island 2004 Annual Report, Record of Well Pumpage and Water Levels, Susquehanna River Basin Commission Permit No 1991102 ML0415901802004-06-0101 June 2004 2003 Annual Report ML0819806852003-12-31031 December 2003 007-C2-AmerGen 2004 - Three Mile Island 2003 Annual Report, Record of Well Pumpage and Water Levels, Susquehanna River Basin Commission Permit No. 19961102 ML0217104602002-06-0606 June 2002 10CFR 50.46 Annual Report for Three Mile Island, Unit 1 2023-02-28
[Table view] Category:Letter
MONTHYEARML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 ML23171B0222023-06-19019 June 2023 (TMI-2) - Notification Pursuant to 10 CFR 72.140(d) Regarding Application of Previously Approved TMI-2 Quality Assurance Program to Independent Spent Fuel Storage Installation Activities ML23137A2822023-05-17017 May 2023 (TMI-2), Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23138A0662023-05-17017 May 2023 TMI-2 NHPA Section 106 Shpo Letter to NRC 5-17-23 ML23026A3132023-05-0202 May 2023 Issuance of Exemption from 10 CFR 70.24 (EPID-L-2023-LLE-0003) ML23122A1842023-05-0101 May 2023 Shpo_Er_Summary_Letter ML23121A2492023-05-0101 May 2023 License Amendment Request, Historic and Cultural Resources Review, Response to Request for Additional Information ML23117A0012023-04-26026 April 2023 Commitment Revision Summary Report ML23027A0832023-04-24024 April 2023 Environmental Assessment/Finding of No Significant Impact - Request for Exemption from 10 CFR 70.24 ML23108A0802023-04-18018 April 2023 Annual Radiological Effluent Release Report ML23108A0822023-04-18018 April 2023 Annual Radiological Environmental Operating Report IR 05000320/20230012023-04-12012 April 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report No. 05000320/2023001 ML23102A0382023-04-10010 April 2023 Occupational Radiation Exposure Annual Report ML23108A2002023-04-10010 April 2023 CFR 20.2206(b) Personnel Radiation Exposure Report for 2022 ML23094A2582023-04-0606 April 2023 Letter to Sidney Hill, Chief, Onondaga Nation, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23093A0572023-04-0606 April 2023 Letter to Joanna Cain, President, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2362023-04-0606 April 2023 Letter to Carissa Speck, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2542023-04-0606 April 2023 Ltr J Bendremer Thpo Stockbridge-Munsee Community Band of Mohican Indians Re Initiation of Consultation Under Section 106 of the NHPA for Proposed License Amendment Request for TMI 2 ML23086C0652023-04-0606 April 2023 Ltr Larry Heady, Thpo, De. Tribe of Indian; Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI Nuclear Station, Unit 2 ML23093A0562023-04-0606 April 2023 Letter to Steve Minnick, Site Decommissioning Director, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2602023-04-0606 April 2023 Letter to William Tarrant, Seneca-Cayuga Nation, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23094A2392023-04-0606 April 2023 Letter to Courtney Gerzetich, Thpo, Onedia Nation of Wisconsin, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23093A0592023-04-0606 April 2023 Letter to Rebecca Countess, Chair, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 2024-02-05
[Table view] |
Text
GPU Nuclear Inc.
((a.u NUCLEAR Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8641 April 29, 2016 TMl-16-013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000_1 THREE MILE ISLAND NUCLEAR STATION, UNIT 2 (TMl-2)
POSSESSION ONLY LICENSE NO. DPR-73 DOCKET NO. 50-320
SUBJECT:
BIENNIAL 10 CFR 50.59 AND PDMS SAR REPORT Attached is the biennial report for Three Mlle Island Nuclear Station, Unit 2 (TMl-2) for years 2014 and 2015. This report is being submitted in accordance with TMl-2 Technical Specification 6.8.1.4 and the 1
requirements of 10 CFR 50.59.
Please contact Mike FitzwaterofTMl-1 Regulatory Assurance at (717) 948-8228 if you have any questions regarding this submittal.
Respectfully, Attachment cc: USNRC TMl-2 Begion I Inspector USNRC TMl-2 Project Manager USNRC Regional Administrator, Region 1
TMl-16-013 Biennial 10 CFR 50.59 and PDMS SAR Report TMl-2 PDMS ACTIVITIES DURING 2014 AND 2015 TMl-2 remained in a safe and stable condition during calendar years 2014 and 2015. Activities included rad waste processing, routine surveillances, equipment repair, and structural repairs.
PDMS SAFETY ANALYSIS REPORT CHANGES The PDMS SAR was updated (Update 11) and submitted to the NRC in GPU Nuclear letter, TMl-15-091, dated August 24, 2015. PDMS Update 11 revised the PDMS SAR to reflect the current plant configuration, administrative processes, and editorial changes.
PROCEDURE CHANGES The typical categories of procedures that were changed in 2014 and 2015 were administrative, ventilation, electrical distribution, rad waste processing, fire protection, and Technical Specification surveillance. All procedure changes at TMl-2 are made using the Exelon 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation. During 2014 and 2015 there were no procedure changes which required a written evaluation.
TESTS AND EXPERIMENTS No tests or experiments not described in the PDMS SAR were performed atTMl-2 during 2014 and 2015.
FACILITY MODIFICATION During 2014 and 2015 there was one facility modification that impacted the PDMS SAR. This was the sale and transfer of the TMl-2 River Water Pump House (RWPH) to TMl-1 (Exelon). The TMl-2 RWPH did not contain any safety-related equipment pertaining to the Unit 2 PDMS condition and was being rented and used by TMl-1. The transfer of the TMl-2 RWPH to TMl-1 did not screen to require a 10 CFR 50.59 evaluation. Thus there were no 10 CFR 50.59 evaluations performed with regard to facility modifications. Due to the non-operating and defueled status ofTMl-2 during PDMS, there are no structures, systems, or components that are required to meet the safety-related criteria. Therefore, there are no structures, systems, or components classified as safety-related at TMl-2 during PDMS. All facility modifications are made using the Exelon 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation. This review and screening process is based on, and incorporates in its entirety, the implementation guidance provided in NEI 96-07, Revision 1.
((a.u NUCLEAR Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8641 April 29, 2016 TMl-16-013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000_1 THREE MILE ISLAND NUCLEAR STATION, UNIT 2 (TMl-2)
POSSESSION ONLY LICENSE NO. DPR-73 DOCKET NO. 50-320
SUBJECT:
BIENNIAL 10 CFR 50.59 AND PDMS SAR REPORT Attached is the biennial report for Three Mlle Island Nuclear Station, Unit 2 (TMl-2) for years 2014 and 2015. This report is being submitted in accordance with TMl-2 Technical Specification 6.8.1.4 and the 1
requirements of 10 CFR 50.59.
Please contact Mike FitzwaterofTMl-1 Regulatory Assurance at (717) 948-8228 if you have any questions regarding this submittal.
Respectfully, Attachment cc: USNRC TMl-2 Begion I Inspector USNRC TMl-2 Project Manager USNRC Regional Administrator, Region 1
TMl-16-013 Biennial 10 CFR 50.59 and PDMS SAR Report TMl-2 PDMS ACTIVITIES DURING 2014 AND 2015 TMl-2 remained in a safe and stable condition during calendar years 2014 and 2015. Activities included rad waste processing, routine surveillances, equipment repair, and structural repairs.
PDMS SAFETY ANALYSIS REPORT CHANGES The PDMS SAR was updated (Update 11) and submitted to the NRC in GPU Nuclear letter, TMl-15-091, dated August 24, 2015. PDMS Update 11 revised the PDMS SAR to reflect the current plant configuration, administrative processes, and editorial changes.
PROCEDURE CHANGES The typical categories of procedures that were changed in 2014 and 2015 were administrative, ventilation, electrical distribution, rad waste processing, fire protection, and Technical Specification surveillance. All procedure changes at TMl-2 are made using the Exelon 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation. During 2014 and 2015 there were no procedure changes which required a written evaluation.
TESTS AND EXPERIMENTS No tests or experiments not described in the PDMS SAR were performed atTMl-2 during 2014 and 2015.
FACILITY MODIFICATION During 2014 and 2015 there was one facility modification that impacted the PDMS SAR. This was the sale and transfer of the TMl-2 River Water Pump House (RWPH) to TMl-1 (Exelon). The TMl-2 RWPH did not contain any safety-related equipment pertaining to the Unit 2 PDMS condition and was being rented and used by TMl-1. The transfer of the TMl-2 RWPH to TMl-1 did not screen to require a 10 CFR 50.59 evaluation. Thus there were no 10 CFR 50.59 evaluations performed with regard to facility modifications. Due to the non-operating and defueled status ofTMl-2 during PDMS, there are no structures, systems, or components that are required to meet the safety-related criteria. Therefore, there are no structures, systems, or components classified as safety-related at TMl-2 during PDMS. All facility modifications are made using the Exelon 10 CFR 50.59 Review Process, which provides a screening process to determine if the change requires a written evaluation. This review and screening process is based on, and incorporates in its entirety, the implementation guidance provided in NEI 96-07, Revision 1. *