~u NUCLEAR April 23, 2020 TMl-20-014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT 2 (TMl-2)

POSSESSION ONLY LICENSE NO. DPR-73 DOCKET NO. 50-320 BIENNIAL 10 CFR 50.59 AND PDMS SAR REPORT GPU Nuclear Inc.

Three Mile Island Nuclear Station Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8641 Attached is the biennial report for Three Mile Island Nuclear Station, Unit 2 (TMl-2) for years 2018 and 2019. This report is being submitted in accordance with TMl-2 Technical Specification 6.8.1.4 and the requirements of 10 CFR 50.59.

Please contact Robert Brady of TMl-1 Regulatory Assurance at (717) 948-8776 if you have any questions regarding this submittal.

Respectfully, Gregory H. Halnon President/CNO GPU Nuclear Attachment cc:

USN RC TMl-2 Region I Inspector USN RC TMl-2 Project Manager USN RC Regional Administrator, Region 1

TMI20014 Biennial10CFR50.59andPDMSSARReport

TMI2PDMSACTIVITIESDURING2018AND2019

TMI2remainedinasafeandstableconditionduringcalendaryears2018and2019.Activitiesincluded radwasteprocessing,routinesurveillances,andequipmentrepair.

PDMSSAFETYANALYSISREPORTCHANGES

ThePDMSSARwasupdated(Update13)andsubmittedtotheNRCinGPUNuclearletter,TMI19085, datedAugust23,2019.PDMSSARUpdate13revisedthePDMSSARtoreflectthecurrentplant configuration,administrativeprocesses,andeditorialchanges.

PROCEDURECHANGES

Thetypicalcategoriesofproceduresthatwerechangedin2018and2019wereadministrative, ventilation,electricaldistribution,radwasteprocessing,fireprotection,andTechnicalSpecification surveillance.AllprocedurechangesatTMI2aremadeusingtheExelon10CFR50.59ReviewProcess, whichprovidesascreeningprocesstodetermineifthechangerequiresawrittenevaluation.During 2018and2019therewerenoprocedurechangeswhichrequiredawrittenevaluation.

TESTSANDEXPERIMENTS

NotestsorexperimentsnotdescribedinthePDMSSAR,whereanSSCisutilizedorcontrolledina mannerthatisoutsidethereferenceboundsofthedesignfortheSSCorisinconsistentwithanalysesor descriptionsinthePDMSSARwereperformedatTMI2during2018and2019.

FACILITYMODIFICATION

During2018and2019therewerenofacilitymodificationsthatimpactedtheTMI2PDMSSAR.

Therefore,no10CFR50.59evaluationswereperformedrelatedfacilitymodifications.Duetothenon operatinganddefueledstatusofTMI2duringPDMS,therearenostructures,systems,orcomponents thatarerequiredtomeetthesafetyrelatedcriteria.Therefore,therearenostructures,systems,or componentsclassifiedassafetyrelatedatTMI2duringPDMS.Allfacilitymodificationsaremadeusing theExelon10CFR50.59ReviewProcess,whichprovidesascreeningprocesstodetermineifthechange requiresawrittenevaluation.Thisreviewandscreeningprocessisbasedon,andincorporatesinits entirety,theimplementationguidanceprovidedinNEI9607,Revision1.