TMI-09-013, Annual Report

From kanterella
Jump to navigation Jump to search
Annual Report
ML090680768
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 02/20/2009
From: Dougherty T
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-09-013
Download: ML090680768 (8)


Text

V Exekln.

Three Mile Island Unit 1 Route 441 South, P.O. Box 480 Telephone 717-948-8000 Nuclear Middletown, PA 17057 February 20, 2009 TMI-09-013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 THREE MILE ISLAND UNIT 1 (TMI-1)

OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289

SUBJECT:

2008 ANNUAL REPORT Attached is the 2008 Annual Report for TM I-1. This report is being submitted in accordance with TMI-1 Technical Specifications Sections 6.9.1.B.2 through 6.9.1.B.5 and 6.17. The attachments to this letter contain the following information:

Attachment 1 - Aircraft movement data from the Harrisburg International Airport (per TMI-1 T.S. section 6.9.1.B.2).

Attachment 2 - Leak reduction program test information (per TMI-1 T.S.

6.9.1.B.3).

Attachment 3 - Pressurizer power operated relief valve and pressurizer safety valve challenges (per TMI-1 T.S. section 6.9.1 .B.4).

Attachment 4 - Results of specific activity analysis - primary coolant system (per TMI-1 T.S. section 6.9.1.B.5).

koo

TMI-09-013 Page 2 of 2 Attachment 5 - Major changes to radioactive waste treatment systems (per TMI-1 T.S. section 6.17)

Sincerely,

/ '7 el Y -~

Thomas J. Dougherty' 7 Plant Manager TJD/awm Attachments cc: TMI-1 Senior Resident Inspector Administrator, Region I TMI-1 Project Manager

TMI-09-013 Attachment 1 ATTACHMENT 1 AIRCRAFT MOVEMENTS AT THE HARRISBURG INTERNATIONAL AIRPORT (HIA)

JANUARY 1, 2008 THROUGH DECEMBER 31, 2008

1. Total Aircraft Movements - 66,961.
2. Estimated total number of movements of aircraft larger than 200,000 pounds -

1309.

This estimate is composed of two parts, 1284 movements of civilian aircraft, and 25 movements of military aircraft.

TMI-09-013 Attachment 2 ATTACHMENT 2 TECHNICAL SPECIFICATION 6.9.1.B.3 PERIODIC LEAK REDUCTION PROGRAM TEST RESULTS The results of the TMI-1 2008 periodic Leak Reduction Program Tests, which included visual inspections, are summarized in Table 1. These tests were performed in accordance with the referenced procedures. (See Note 1 for procedure titles.)

TABLE 1 2008 LEAK REDUCTION PROGRAM TEST RESULTS FOR TMI-1 SURVEILLANCE DATE OF LEAKING LEAK LEAK RESULTING PROCEDURES PERFORMANCE COMPONENT RATE RATE MAINTENANCE (Note 1) I.D. UNDERTAKEN AS-FOUND AS-LEFT 1303-11.18 01/01/08 12/31/08 LLRT summation MAXPATH 22,106 15,152 (applying Option 2008 sccm sccm None required B) MINPATH 10,088 7,748 sccm sccm OP-TM-823-251 11-08-2008 AH-V-1A/B 1168 sccm Scheduled Valve operator in 2009 modification OP-TM-823-252 08-09-2008 AH-V-1C/D 838 sccm 1211 sccm Valve PM 1303-11.29 08-01-2008 None 0 None required OP-TM-212-251 11-04-2008 None 0 None required (DH train A outside RB) ... .... ..

OP-TM-212-251 10-14-2008 None 0 None required (DH Train B outside RB)

OP-TM-211-251 02-14-2008 None 0 None required (HPI train B outside RB)

OP-TM-211-251 05-14-2008 None 0 None required (HPI train A outside RB)

OP-TM-211-250 09-04-2008 None 0 None required Note 1: 1303-11.18,"RB Local Leak Rate Testing" 1303-11.29, "Waste Gas Disposal System Leak Check" OP-TM-211-250, "Leak Check of Bleed Line Piping and Valves" (formerly "Liquid Waste Disposal System Leak Check")

OP-TM-211-251, "Leakage Exam of Make-up System" OP-TM-212-251, "DH Leakage Exam for IST" OP-TM-823-251, "LLRT of Purge Exhaust Penetration Valves" OP-TM-823-252, "LLRT of Purge Supply Penetration Valves"

TMI-09-013 Attachment 3 ATTACHMENT 3 PRESSURIZER POWER OPERATED RELIEF VALVE AND PRESSURIZER SAFETY VALVE CHALLENGES IN 2008 There were no challenges to the pressurizer power operated relief valve (PORV) or either of the two pressurizer (PZR) safety valves during the entire calendar year of 2008.

A review of the Reactor Coolant System (RCS) pressure indication trend data concluded that the RCS pressure operated well below the PORV set point of 2450 psig, and both PZR safety valve set points of 2500 psig throughout the calendar year of 2008. Therefore no challenges to the PORV or PZR safety valves occurred during 2008.

TMI-09-013 Attachment 4 ATTACHMENT 4 RESULTS OF SPECIFIC ACTIVITY ANALYSIS-PRIMARY COOLANT SYSTEM Technical Specification 6.9.1..B.5 requires annual reporting of certain information regarding the results of specific activity analyses in which the primary coolant exceeded the limits of Technical Specification (TS) 3.1.4.1. The limits of TS 3.1.4.1 were not exceeded at TMI-1 at any time during the year 2008. The figure of RCS activity for 2008 shows that the limit of 0.35 microcurie/gram dose equivalent.l-131 (DEI) was not exceeded in 2008.

TMI-09-013.

Attachment 4 TMI-1 Dose Equivalent Iodine (DEI) in 2008 1.OOE+00 1.OOE-01 E


DEI 1.OOE-02 TS Limit a

1.OOE-03 1.OOE-04 2--Jan 1-Feb 2-Mar 1-Apr 1-May 31 -May 30-Jun 30-Jul 29-Aug 28-Sep 28-Oct 27-Nov 27-Dec Date

TMI-09-013 Attachment 5 ATTACHMENT 5 MAJOR CHANGES TO RAD WASTE TREATMENT SYSTEMS Technical Specification Section 6.17 requires reporting of "Major Changes to Radioactive Waste Treatment Systems." Major changes are interpreted to mean changes that would alter how the system functions or changes that would affect operational exposures, offsite dose rates or integrated doses. There were no major changes to the liquid, gaseous, or solid radioactive waste treatment systems at TMI-1 during the year of 2008.